MONTHYEARML23180A1512023-06-29029 June 2023 LLC, Request for Exemption to the Reporting Requirements of 10 CFR 50.46(a)(3) ML21102A3072021-04-15015 April 2021 OEDO-21-00155 - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC, Small Modular Reactor ML21050A4312021-02-19019 February 2021 LLC - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC Small Modular Reactor ML20247J5642020-09-11011 September 2020 Standard Design Approval for the NuScale Power Plant Based on the NuScale 600 Standard Plant Design Certification Application ML20231A8042020-08-28028 August 2020 Final Safety Evaluation Report for the NuScale Standard Plant Design ML20224A4602020-08-25025 August 2020 OEDO-20-00292-Response to the Advisory Committee on Reactor Safeguards Letter on NuScale Power, LLC, Report on the Safety Aspects of the NuScale Small Modular Reactor ML20231A5982020-08-25025 August 2020 OEDO-20-00285_NuScale Area of Focus - Boron Redistribution ML20210M8902020-07-29029 July 2020 Area of Focus - Boron Redistribution ML20195A5872020-07-13013 July 2020 LLC - Submittal of Draft Operator Licensing and Examination Standard for NuScale Small Modular Reactors ML20195C7662020-07-13013 July 2020 LLC Request for Standard Design Approval Based on the NuScale Standard Plant Design Certification Application ML20192A3262020-07-10010 July 2020 LLC, Submittal of Environmental Report: Revision Status ML20198M3932020-07-0202 July 2020 LLC Submittal of Revised Packing Slip for Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1, Dated June 19, 2020 ML20174A3472020-07-0101 July 2020 OEDO-20-00220 - Area of Focus - Probabilistic Risk Assessment and Emergency Core Cooling System Valve Performance ML20184A2872020-07-0101 July 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and General Design Criterion 33, PM-0720-70785, Revision 0 ML20181A4322020-06-22022 June 2020 Final SER for NuScale TR-0516-49416 NON-Loss-of-Coolant Analysis Model, Rev 3 (Letter) ML20181A2702020-06-22022 June 2020 Final SER for NuScale TR-0516-49422 Loss-of-Coolant Analysis Model, Rev 2 (Letter) ML20198M3922020-06-19019 June 2020 LLC - Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1 ML20171A7312020-06-19019 June 2020 LLC, Submittal of Riser Flow Hole Methodology and Associated Changes to Final Safety Analysis Report Incorporating Its Use ML20157A2232020-06-0303 June 2020 Letter to NuScale Requesting -A for TR-0716-50350 ML20150C5172020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled NRC Public Meeting Presentation: Boron Redistribution and Associated Design and DCA Changes, PM-0620-70336, Revision 0 ML20150E1772020-05-29029 May 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Extended Dhrs Operation and RCS Boron Redistribution (Closed Session), PM-0620-70243, Revision 0 ML20150C8812020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and Associated Design and DCA Changes, PM-0620-70244, Revision 0 ML20149M1192020-05-28028 May 2020 LLC Summary of Impacts to Erai 8930 Response and Discussion on the Exemption from General Design Criterion 33 ML20141L8082020-05-20020 May 2020 LLC Submittal of Containment Response Analysis Methodology Technical Report, TR-0516-49084, Revision 3 ML20141N0122020-05-20020 May 2020 LLC Submittal of Changes to Final Safety Analysis Report, Section 6.2, Containment Systems, Section 6.3, Emergency Core Cooling System, and Technical Report TR-0516-49084, Containment Response Analysis Methodology Technical Report ML20141M7642020-05-20020 May 2020 LLC Submittal of Nuclear Steam Supply System Advanced Sensor Technical Report, TR-0316-22048, Revision 3 ML20141L7872020-05-20020 May 2020 LLC, Submittal of Second Updates to Standard Plant Design Certification Application, Revision 4 ML20141L8162020-05-20020 May 2020 LLC, Submittal of Long-Term Cooling Methodology, TR-0916-51299, Revision 3 ML20141M1142020-05-20020 May 2020 LLC Submittal of NuScale Instrument Setpoint Methodology Technical Report, TR-0616-49121, Revision 3 ML20141L8042020-05-20020 May 2020 LLC Submittal of Technical Specifications Regulatory Conformance and Development, TR-1116-52011, Revision 4 ML20128J3162020-05-18018 May 2020 OEDO-20-00167 - Response to the ACRS Letter on Combustible Gas Monitoring ML20133K0882020-05-12012 May 2020 LLC, Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution (Closed Session), PM-0420-69512, Revision 0 ML20133J9142020-05-11011 May 2020 LLC Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0420-69511, Revision 0 ML20112F4552020-05-0101 May 2020 LLC, Design Certification Application Phases 5 and 6 Review Status ML20107F8492020-05-0101 May 2020 OEDO-2000140 - NuScale Area of Focus - Helical Tube Steam Generator Design ML20104A0792020-04-27027 April 2020 OEDO-20-00115 - Safety Evaluation Report for Topical Report TR-0516-49416, Revision 2, Non-Loss-of-Coolant Accident Analysis Methodology ML20099H0802020-04-0808 April 2020 LLC - Submittal of Presentation Materials Entitled NRC Public Meeting: Revisions to Nuscale'S EPZ Sizing Methodology Topical Report, PM-0420-69598, Revision 0 ML20098G2372020-04-0707 April 2020 Nuscale Power, LLC Submittal of Remaining Closure Items for the Emergency Core Cooling System Valve Failure Mode Effects Analysis Audit Items ML20097F1922020-04-0606 April 2020 Nuscale Power, LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: Nuscale Topic - Hydrogen/Oxygen Monitoring, PM-0420-69518, Revision 0 ML20094H6742020-04-0303 April 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation NuScale Topic-Probabilistic Risk Assessment with a Focus on Emergency Core Cooling System Analysis PM-0420-69559, Revision 0 ML20092L8992020-04-0101 April 2020 LLC - Submittal of Updates to Standard Plant Design Certification Application, Revision 4 ML20072M6682020-03-30030 March 2020 Response to NuScale Letter Dated February 24, 2020, on Planned SDA Application Content ML20072H3332020-03-0909 March 2020 LLC - Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0320-69218, Revision 0 ML20057D9002020-03-0606 March 2020 Submittal of Errata to Final SE for NuScale Power, LLC TR-1010-859-NP-A, Quality Assurance Program Description for the NuScale Power Plant ML20062F7262020-03-0505 March 2020 Request for Withholding Information from Public Disclosure for Nuscale Power, LLC Letter Public ML20069A1572020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Rod Ejection Accident Methodology, PM-0320-69146, Revision 0 ML20069A1772020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Non-Loss-of-Coolant Accident, PM-0320-69141, Revision 0 ML20069A9632020-03-0404 March 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report, Loss-of-Coolant Accident Evaluation Model, PM-0320-69138, Revision 0 ML20066G2802020-03-0303 March 2020 LLC, Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Topic - Hydrogen Monitoring, PM-0220-69071, Revision 0 ML20066G2882020-02-28028 February 2020 LLC Submittal of Presentation Materials Titled ACRS Full Committee Presentation: NuScale - Steam Generator Design (Closed Session), PM-0220-69053, Revision 0 2023-06-29
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRAIO-0420-69855, LLC, Submittal of Corrected Response to NRC Request for Additional Information No. 284 (Erai No. 9225) on the NuScale Design Certification2020-04-30030 April 2020 LLC, Submittal of Corrected Response to NRC Request for Additional Information No. 284 (Erai No. 9225) on the NuScale Design Certification ML19332A1202019-11-27027 November 2019 LLC Supplemental Response to NRC Request for Additional Information No. 484 (Erai No. 8930) on the NuScale Design Certification Application ML19304B4712019-10-31031 October 2019 LLC Supplemental Response to NRC Request for Additional Information No. 466 (Erai No. 9482) on the NuScale Design Certification Application ML19296D8052019-10-23023 October 2019 LLC Response to NRC Request for Additional Information No. 526 (Erai No. 9719) on the NuScale Design Certification Application ML19283E5302019-10-10010 October 2019 LLC Supplemental Response to NRC Request for Additional Information No. 522 (Erai No. 9681) on the NuScale Design Certification Application ML19260G7352019-10-0707 October 2019 Summary of Public Meeting with NuScale to Discuss Response to RAI 9681 ML19266A5872019-09-23023 September 2019 LLC Supplemental Response to NRC Request for Additional Information No. 518 (Erai No. 9659) on the NuScale Design Certification Application ML19262G9742019-09-19019 September 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Tier 1, Section 3.11, Reactor Building and Section 3.13, Control Building, and Tier 2, Section 3.8.4, Design of Category I Structure and Section 14.3, Certified ... ML19262G5762019-09-19019 September 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Section 14.2, Initial Plant Test Program, Table 14.2-2, Pool Cleanup Systems Test #2, and Table 14.2-50, Module Assembly Equipment Test #50 ML19259B8102019-09-16016 September 2019 LLC Supplemental Response to NRC Request for Additional Information No. 205 (Erai No. 9044) on the NuScale Design Certification Application ML19259A0922019-09-16016 September 2019 LLC Response to NRC Request for Additional Information No. 525 (Erai No. 9705) on the NuScale Design Certification Application ML19238A3722019-08-26026 August 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19238A3662019-08-23023 August 2019 LLC - Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19215A0032019-08-0202 August 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on the NuScale Design Certification Application ML19215A0062019-08-0202 August 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 441 (Erai No. 9485) on the NuScale Design Certification Application ML19212A7622019-07-31031 July 2019 LLC Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19212A3752019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 483 (Erai No. 9516) on the NuScale Design Certification Application ML19212A7992019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19212A6892019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 205 (Erai No. 9044) on the NuScale Design Certification Application ML19210D1592019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 401 (Erai No. 9447) on the NuScale Design Certification Application ML19210D7342019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 520 (Erai No. 9642) on the NuScale Design Certification Application ML19210E1462019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19207B3812019-07-26026 July 2019 LLC - Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19207A5342019-07-26026 July 2019 LLC - Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19207B8522019-07-25025 July 2019 LLC Response to NRC Request for Additional Information No. 194 (Erai No. 8884) on the NuScale Design Certification Application ML19203A3152019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 325 (Erai No. 9268) on the NuScale Design Certification Application ML19203A3212019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 333 (Erai No. 9282) on the NuScale Design Certification Application ML19203A3092019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 54 (Erai No. 8837) on the NuScale Design Certification Application ML19203A3422019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 154 (Erai No. 8938) on the NuScale Design Certification Application ML19200A2482019-07-19019 July 2019 LLC Response to NRC Request for Additional Information No. 522 (Erai No. 9681) on the NuScale Design Certification Application ML19200A2082019-07-19019 July 2019 LLC - Response to NRC Request for Additional Information No. 524 (Erai No. 9691) on the NuScale Design Certification Application ML19199A1172019-07-18018 July 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 484 (Erai No. 8930) on the NuScale Design Certification Application ML19198A3252019-07-17017 July 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 249 (Erai No. 9135) on the NuScale Design Certification Application ML19196A3682019-07-15015 July 2019 LLC Response to NRC Request for Additional Information No. 516 (Erai No. 9647) on the NuScale Design Certification Application ML19191A2202019-07-10010 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19184A6152019-07-0303 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 386 (Erai No. 9316) on the NuScale Design Certification Application ML19176A5802019-06-25025 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19170A3702019-06-19019 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19168A2442019-06-17017 June 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 325 (Erai No. 9268) on the NuScale Design Certification Application ML19164A1452019-06-13013 June 2019 LLC - Submittal of Containment Response Analysis Methodology Technical Report, TR-0516 -49 08 4, Revision 1 ML19157A3262019-06-0606 June 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19154A6222019-06-0303 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on the NuScale Design Certification Application ML19154A6052019-06-0303 June 2019 LLC Response to NRC Request for Additional Information No. 514 (Erai No. 9645) on the NuScale Design Certification Application ML19151A8372019-05-31031 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 377 (Erai No. 9380) on the NuScale Design Certification Application ML19140A4592019-05-20020 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 401 (Erai No. 9447) on the NuScale Design Certification Application ML19137A2902019-05-17017 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 156 (Erai No. 9031) on the NuScale Design Certification Application ML19137A2872019-05-15015 May 2019 LLC Response to NRC Request for Additional Information No. 519 (Erai No. 9656) on the NuScale Design Certification Application ML19126A2942019-05-0606 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 26 (Erai No. 8840) on the NuScale Design Certification Application ML19122A5092019-05-0202 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 494 (Erai No. 9548)on the Design Certification Application ML19121A6002019-05-0101 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on Design Certification Application 2020-04-30
[Table view] |
Text
RAIO-1218-63855 December 17, 2018 Docket No.52-048 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738
SUBJECT:
NuScale Power, LLC Response to NRC Request for Additional Information No.
511 (eRAI No. 9613) on the NuScale Design Certification Application
REFERENCE:
U.S. Nuclear Regulatory Commission, "Request for Additional Information No.
511 (eRAI No. 9613)," dated November 20, 2018 The purpose of this letter is to provide the NuScale Power, LLC (NuScale) response to the referenced NRC Request for Additional Information (RAI).
The Enclosure to this letter contains NuScale's response to the following RAI Question from NRC eRAI No. 9613:
- 12.02-33 This letter and the enclosed response make no new regulatory commitments and no revisions to any existing regulatory commitments.
If you have any questions on this response, please contact Carrie Fosaaen at 541-452-7126 or at cfosaaen@nuscalepower.com.
Sincerely, Zackary W. Rad Director, Regulatory Affairs NuScale Power, LLC Distribution: Gregory Cranston, NRC, OWFN-8G9A Samuel Lee, NRC, OWFN-8G9A Getachew Tesfaye, NRC, OWFN-8H12 Enclosure 1: NuScale Response to NRC Request for Additional Information eRAI No. 9613 NuScale Power, LLC 1100 NE Circle Blvd. , Suite 200 Corvalis, Oregon 97330 , Office: 541.360.0500 , Fax: 541.207.3928 www.nuscalepower.com
RAIO-1218-63855 :
NuScale Response to NRC Request for Additional Information eRAI No. 9613 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com
Response to Request for Additional Information Docket No.52-048 eRAI No.: 9613 Date of RAI Issue: 11/20/2018 NRC Question No.: 12.02-33 As a follow-up RAI to RAI 9266, Question 12.02-13, the staff is requesting additional information for the evaporation rate of the Reactor Building pool. More specifically the staff is seeking to understand the use of a non- conservative value for pool water temperature.
Basis:
10 CFR 52.47(a)(5) requires applicants to identify the kinds and quantities of radioactive materials expected to be produced during operation and the means for controlling and limiting radiation exposures within the limits set forth in 10 CFR Part 20. This relates to the assumed airborne concentrations of radionuclides as a result of assumed evaporation rates and other parameters that would impact the airborne concentrations.
10 CFR 20.1101(b) and 10 CFR 20.1003, require the use of engineering controls to maintain exposures to radiation as far below the dose limits in 10 CFR 20 as is practical. This relates to the design of the Reactor Building HVAC (RBV) system and its ability to remove heat and airborne radionuclides.
10 CFR 20.1204, "Determination of Internal Exposure", 10 CFR 20.1204, "Determination of Internal Exposure"; 10 CFR 20.1701, "Use of Process or Other Engineering Controls"; and 10 CFR 20.1702, "Use of Other Controls".
Background:
In discussions held with NuScale on RAI 9266, Question 12.02-12, the staff has questioned the use of 100°F pool surface water temperature when calculating the evaporation rate from the pool. The NuScale Technical Specification (TS) 3.5.3, "Ultimate Heat Sink" (UHS) bulk average NuScale Nonproprietary
temperature limit of 140°F is significantly greater than the temperature assumed for determining the evaporation rate.
In their response to RAI 9266, Question 12.02-13, NuScale stated:
"The calculated airborne activity in the airspace above the reactor pool water is based on an evaporation rate from the reactor pool while the pool water temperature is at the design basis temperature for the Reactor Building HVAC (RBV) system, which is 100°F air temperature. Above this temperature, the RBV system may be unable to adequately cool the Reactor Building atmosphere, thereby potentially resulting in compensatory measures, such as increasing pool heat removal via the pool cooling systems, to return the pool water temperature below 100°F."
While operating within the design basis air temperature for the Reactor Building HVAC (RBV) would have some impact on pool surface water temperature, this does not necessarily limit UHS bulk average temperature to 100°F, the value used in NuScale's calculations to determine evaporation rates from pool. NuScale has not provided sufficient information related to elements of the Design Certification Application which establish a design basis for UHS bulk average temperature of 100°F that supports use as an initial condition the analysis of the evaporation rate from the pool. As such, since NuScale could foreseeably operate above 100°F UHS temperature, the staff requested the airborne equilibrium values of radioisotopes of concern when operating the UHS up to TS limit of 140°F or other appropriate limit justified by NuScale.
NuScale has also not provided this information.
Staff confirmatory calculations have determined that an increased pool temperature would result in higher evaporation rates which would result in increased airborne radionuclide concentrations. The calculations indicate that operation near technical specification limits for UHS bulk temperature of 140° F could increase airborne tritium equilibrium values over 3 times the value provided by NuScale with UHS temperature of 100° F. In table 12.2-33:
Reactor Building Airborne Concentrations, NuScale has provided the airborne concentration of tritium as 1.87E-06 µCi/ml with the UHS temperature of 100° F. This value is approximately 9%
of the Occupational Value of the Derived Air Concentration (DAC) for tritium (2.0E-05 µCi/ml).
10 CFR 20.1204(g)(2) Determination of internal exposure states:
(g) When a mixture of radionuclides in air exists, licensees may disregard certain radionuclides in the mixture if NuScale Nonproprietary
(2) The concentration of any radionuclide disregarded is less than 10 percent of its DAC, and (3) The sum of these percentages for all of the radionuclides disregarded in the mixture does not exceed 30 percent With an assumption of 9% DAC value for airborne tritium, a licensee may take advantage of 10 CFR 20.1204(g)(2), and disregard the contribution of tritium in determination of internal exposure. Operation of the UHS bulk temperature above 100° F could foreseeably cause the airborne concentration of tritium to exceed the 10 CFR 20.1204(g)(2) threshold.
Questions:
To facilitate staff understanding of the application information in support of its reasonable assurance review regarding identifying the kinds and quantities of radioactive material expected to be produced during operations and the resulting radiation exposures, the staff requests the applicant respond to the following:
- 1. Revise DCA Table 12.2-36, "Input Parameters for Determining Facility Airborne Concentrations" to update the Pool surface water temperature to reflect NuScale TS 3.5.3, Ultimate Heat Sink (UHS) bulk average temperature limit of 140°F, or establish a design basis UHS temperature for controlling radionuclide evolution to limit evaporation and update the resultant change in Pool evaporation rate.
- 2. In addition the staff requests NuScale to update DCA Table 12.2-33, "Reactor Building Airborne Concentrations," to reflect changes to reactor building equilibrium airborne concentrations as a result of increased pool evaporation rate.
OR
- 1. Provide a COL Item in DCA section 12.5 that states that the COL Applicant is responsible for developing the operational programmatic elements that ensure internal and external occupational exposures resulting from an increased UHS temperature remain below regulatory limits.
NuScale Response:
NuScale's original response to RAI 9266 actually states:
NuScale Nonproprietary
"The calculated airborne activity in the airspace above the reactor pool water is based on an evaporation rate from the reactor pool while the pool water temperature is at the design basis temperature for the Reactor Building HVAC (RBV) system, which is 100°F.
Above this temperature, the RBV system may be unable to adequately cool the Reactor Building atmosphere, thereby potentially resulting in compensatory measures, such as increasing pool heat removal via the pool cooling systems, to return the pool water temperature below 100°F."
RAI 9613 misquotes this part of NuScale's response. The design basis for the RBV is not based on the Reactor Building air temperature, but the reactor pool water temperature.
The NuScale design basis airborne source term has recently been revised in response to NRC audit feedback (total tritium curie generated was less than the total curies released) and modeling improvements (pool evaporation rate under the bioshield was previously neglected in determining the pool water equilibrium tritium value). The results show the peak airborne concentration of tritium in the air space above the reactor pool is approximately 7.3% of a DAC, and the total airborne is approximately 8% of a DAC. NuScale Technical Specification (TS 3.5.3) has also recently been revised (as described in the NuScale response to RAI 06.02.01.01.A-18) to limit the UHS pool water bulk average temperature to a maximum of 110°F. It is unlikely that a slight increase in pool water temperature would result in exceeding the 10% of a DAC limit for tritium above the reactor pool.
The stated value of pool water temperature of 100°F represents the parameter used for the radiological analysis that assessed the adequacy of the Reactor Building HVAC system design because it was the basis of the design of the Reactor Building HVAC system. Therefore, plant operations with the pool temperature higher could not be sustained by the design. This analysis also assumes that twelve power modules are operating with the design basis fuel failure for the entire cycle for every cycle and that the pool water radionuclide concentration is at its peak value resulting from refueling operations. Therefore, this analysis provides reasonable assurance that the facility can be operated in conformity with the regulations.
Regarding 10 CFR 20.1204(g)(2), internal occupational doses are not assigned to plant personnel based on airborne values documented in FSAR tables. 10 CFR 20.1204 requires that the licensee take suitable and timely measurements of concentrations of radioactive materials in air in work areas, or quantities of radionuclides in the body, or quantities of radionuclides excreted from the body, or combinations of these measurements. Occupational doses are assigned based on these contemporary measurements, not FSAR tables. These occupational doses are assigned in accordance with procedures developed as part of the radiation protection program (COL Item 12.5-1).
NuScale Nonproprietary
NuScale has provided a COL item (COL Item 12.5-1) that states that the COL applicant is responsible for developing an operational radiation protection program to ensure occupational radiation internal and external exposures remain below regulatory limits regardless of the plant condition, including increased UHS temperature. The regulatory radiation occupational exposure limits in 10 CFR 20 are not dependent upon plant conditions, but include "the dose received by an individual in the course of employment in which the individual's assigned duties involve exposure to radiation or to radioactive material from licensed and unlicensed sources of radiation, whether in the possession of the licensee or other person." Therefore, the operational radiation protection program is provided to ensure occupational exposures comply with regulations.
Additionally, a nuclear facility that is issued a license to operate a commercial nuclear facility is required to operate in conformity with the application and within the rules and regulations of the NRC. Therefore, the licensing basis for the operation of the facility, as documented in the safety analysis report, establishes the parameters of operation, and the licensee is required to operate the facility in accordance with its licensing basis. As such, operation of the facility with the pool temperature above 100°F would not be in accordance with the licensing basis, and cannot be sustained.
Impact on DCA:
There are no impacts to the DCA as a result of this response.
NuScale Nonproprietary