ML18351A044
| ML18351A044 | |
| Person / Time | |
|---|---|
| Issue date: | 12/17/2018 |
| From: | Jeffrey Mitchell Acquisition Management Division |
| To: | Beckman Associates |
| References | |
| 31310018D0011 | |
| Download: ML18351A044 (3) | |
Text
___________
(x) 31310019F0001 x 31310018D0011 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
2019-X0200-FEEBASED-20-20D003-1054-11-5-139-251A-11-5-139-1054 785915794 BECKMAN ASSOCIATES INC NRCHQ WASHINGTON DC 20555-0001 MAIL STOP TWFN-07B20M ACQUISITION MANAGEMENT DIVISION US NRC - HQ WASHINGTON DC 20555-0001 NRCHQ JEFFREY R MITCHELL 301-415-5074 MAIL STOP TWFN-07B20M ACQUISITION MANAGEMENT DIVISION US NRC - HQ NRR-19-0031 See Block 16C P00001 3
1
- 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
- 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.
is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
- 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS FACILITY CODE CODE 10B. DATED (SEE ITEM 13) 10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11) 9A. AMENDMENT OF SOLICITATION NO.
CODE
- 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
- 7. ADMINISTERED BY (If other than Item 6)
CODE
- 6. ISSUED BY PAGE OF PAGES
- 4. REQUISITION/PURCHASE REQ. NO.
- 3. EFFECTIVE DATE
- 2. AMENDMENT/MODIFICATION NO.
- 5. PROJECT NO. (If applicable)
- 1. CONTRACT ID CODE AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 12/07/2018 1071 STATE RTE 136 SUITE 20 BELLE VERNON PA 150122926 Net Increase:
$250,000.00 CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT:
Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
FAR 52.232-22 Limitation of Funds x
- 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
X Project
Title:
Design Bases Assurance (DBA) inspections [Calendar Year 2019]
The purpose of this modification is to provide incremental funding in the amount of $250,000.00 thereby increasing the total obligation amount from $100,000.00 to $350,000.00. A detailed description is provided on Attachment No. 1.
Total Obligation Amount: $350,000.00 (changed)
Total Ceiling Amount: $2,129,859.86 (unchanged)
Continued...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) 15A. NAME AND TITLE OF SIGNER (Type or print) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED (Signature of person authorized to sign)
(Signature of Contracting Officer)
JEFFREY R. MITCHELL STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243 Previous edition unusable Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect.
12/17/2018
ITEM NO.
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT NAME OF OFFEROR OR CONTRACTOR 2
3 CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF BECKMAN ASSOCIATES INC (A)
(B)
(C)
(D)
(E)
(F) 31310018D0011/31310019F0001/P00001 Delivery: 12/31/2019 Delivery Location Code: NRCHQ NUCLEAR REGULATORY COMMISSION NUCLEAR REGULATORY COMMISSION WASHINGTON DC 20555-0001 USA Period of Performance: 01/01/2019 to 12/31/2019 NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
3130018D0011 Mod 0001 31310019F0001 Attachment No. 1 As a result of this modification action section B.3 NRCB040A CONSIDERATION AND OBLIGATION COST-PLUS-FIXED-FEE ALTERNATE I is hereby deleted in its entirety and is replaced with the following:
B.3 NRCB040A CONSIDERATION AND OBLIGATION--COST-PLUS-FIXED-FEE ALTERNATE I (a) The total estimated cost to the Government for full performance of this task order is
$2,129,859.86, of which the sum of $2,000,511.77 represents the estimated reimbursable costs, and of which $129,348.09 represents the fixed-fee.
(b) There shall be no adjustment in the amount of the Contractor's fixed-fee.
(c) The amount obligated by the Government with respect to this contract is $350,000.00, of which the sum of $320,000.00 represents the estimated reimbursable costs, and of which
$30,000.00 represents the fixed-fee.
(d) This is not a fully-funded contract and FAR 52.232 "Limitation of Cost" and FAR 52.232-22 Limitation of Funds applies.
(e) In accordance with FAR 52.216 Fixed Fee, it is the policy of the NRC to withhold payment of fee after payment of 85 percent of the fee has been paid in order to protect the Government's interest. The amount of fixed-fee withheld from the contractor will not exceed 15 percent of the total fee or $100,000.00, whichever is less. Accordingly, the maximum amount of fixed-fee that may be held in reserve is $19,402.00.