ML18348A788

From kanterella
Jump to navigation Jump to search
Advising, Exxon Nuclear Co. Performed Reevaluation of ECCS System & Transmitted Topical Report XN-76-44(A) Revised Nucleate Boiling Lockout for ENC WREM-Based ECCS Evaluation Models, Dated February 1977
ML18348A788
Person / Time
Site: Palisades 
Issue date: 03/30/1977
From: Hoffman D
Consumers Power Co
To: Schwencer A
Office of Nuclear Reactor Regulation
References
Topical Report XN-76-44(A)
Download: ML18348A788 (1)


Text

  • -

..;I consumers

!Plower company General Offices: 212 West *Michigan Avenue, Jackson, Michigan 49201 *Area Code 517 788;0550 March 30'. 1977R£GUlATQRY DOrJ(EJ fll.t CiJPY Director of Nuclear Reactor Regulation Att:

Mr Albert Schwencer, Chief Operating Reactor Branch No 1 US Nuclear Reguiatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR-20 PALISADES PLANT -

EXXON ECCS EVALUATION MODEL As requested in your December.20, 1976 letter, a reevaluation of the* PaJ.isades Nuclear Plant ECCS system has been pe!'formed by Exxon Nuclear Company using an NRC staff approved model that.precludes the return to nucleate boiling during blowdovm. after c.ritical heat flU:X has been predicted.

This reevaluation is documented in the topical report XN-76-44(A),* entitled "Revised Nucleate Boiling Lo.ckout for ENC WREM-Based ECCS *Evaluation Models," dated February.1977 and transmitted directly by Exxon to Mr *George Lear, DOR~ by letter dated February*S,

  • 1977.

The reference report should complete questions on this subject.

David P Hoffman Assistant Nuclear Licensing Administrator CC: