Category:Letter
MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] Category:Licensee Event Report (LER)
MONTHYEARML18344A4142018-12-10010 December 2018 LER 1979-037-00 for Palisades Nuclear Plant, Two Manual Three Inch Containment Isolation Valves in Bypass Line Were Discovered to Be Locked Open 05000255/LER-2017-0022017-07-17017 July 2017 Reactor Protection System Actuation While the Reactor was Shutdown, LER 17-002-00 for Palisades Regarding Reactor Protection System Actuation While the Reactor was Shutdown 05000255/LER-2017-0012017-05-24024 May 2017 Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions, LER 17-001-00 for Palisades Nuclear Plant Regarding Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions PNP 2014-100, Cancellation of Licensee Event Report (LER) 2004-002, Leak Indications Identified in Reactor Pressure Vessel Head Nozzle Penetrations2014-11-19019 November 2014 Cancellation of Licensee Event Report (LER) 2004-002, Leak Indications Identified in Reactor Pressure Vessel Head Nozzle Penetrations PNP 2011-009, Special Report of Inoperability of Main Steam Line Gross Gamma Activity Monitor2011-02-10010 February 2011 Special Report of Inoperability of Main Steam Line Gross Gamma Activity Monitor ML0726101822007-09-14014 September 2007 Cancellation of Licensee Event Report 07-003, Potential for Reduced Component Cooling Water Cooling Capability ML0609002832006-03-30030 March 2006 Cancellation of Licensee Event Report 05-006, Inoperable Containment Due to Containment Air Cooler Through-Wall Flaws ML18347B2971998-05-19019 May 1998 Submit, NPDES Notification Report, Incident No. Pal-98-05-NC138 for NPDES Permit No MI0001457 Re Difference from Daily Maximum Effluent Limitation for Facility ML18348A9021989-02-0707 February 1989 LER 1988-005-01 for Palisades, Inadequate Procedure Results in Valve Testing During Prohibited Conditions ML18346A2471981-06-19019 June 1981 LER 1981-020-00 for Palisades Nuclear Plant, Pcs Unidentified Leakage Greater than 1.0 Gpm ML18346A2481981-05-13013 May 1981 LER 1981-015-00 for Palisades Nuclear Plant, Safety Injection Tank Boron Concentration ML18346A2491981-02-20020 February 1981 LER 1981-005-00 for Palisades Nuclear Plant, Update - Inoperable Diesel Generator ML18346A2501981-02-19019 February 1981 LER 1981-007-00 for Palisades Nuclear Plant, Inoperable Auxiliary Feedwater Pump ML18346A2511981-01-26026 January 1981 LER 1981-002-00 for Palisades Nuclear Plant, Inadequate Mounting of DC Distribution Panel ML18346A2521981-01-16016 January 1981 LER 1981-001-00 for Palisades Nuclear Plant, During Charging of Station Batteries, Output Breakers of Both Batteries Were Inadvertently Opened for Approximately One Hour ML18346A2531981-01-14014 January 1981 LER 1980-046-00 for Palisades Nuclear Plant, Hydraulic Snubber Failure ML18346A2541981-01-0707 January 1981 LER 1980-045-00 for Palisades Nuclear Plant, Low Condensate Makeup Inventory ML18347A8141980-10-10010 October 1980 LER 1980-037-00 for Palisades Nuclear Plant, Pipe Support Sway Struts Identified to Have the Potential of the Bushing Becoming Loose And/Or Disengaged from the Clamp End of the Sway Strut ML18347A8461980-08-27027 August 1980 License Event Report 1980-027-00 Re Gaseous Release, Extended Due Date of Reporting by Region III on 8/26/1980 ML18347A8471980-08-12012 August 1980 License Event Report 1980-024-00 Re Containment High Radiation Monitor ML18347A8481980-08-0808 August 1980 License Event Report 1980-023-00 Re Containment High Radiation Monitor ML18347A8491980-08-0808 August 1980 License Event Report 1980-022-00 Re Inoperable Nuclear Instrumentation ML18347A8501980-08-0606 August 1980 License Event Report 1980-021-00 Re Misaligned Containment Sump Valve ML18347A8521980-07-29029 July 1980 License Event Report 1980-020-00 Re Misaligned Control Rod ML18347B2071980-06-19019 June 1980 Licensee Event Report 80-018 Regarding Oil Level in Snubber No. 2 Found to Be Less than Zero During Routine Testing of Hydraulic Snubbers ML18347B2081980-06-13013 June 1980 Licensee Event Reports 80-014, 80-015, and 80-016 Regarding Oil Level in Snubbers No. 5, 9, and 7 Were Found to Be Less than Zero During Routine Testing of Hydraulic Snubbers ML18347B2091980-05-15015 May 1980 Licensee Event Report 80-012 Regarding Bottom Half of the Barrier for Fire Penetration HO-12 Was Missing During Inspection of Fire Barriers ML18347B2101980-05-14014 May 1980 License Event Report 1980-011-00 Re Improper Return-to-Service of Porv'S ML18348A9071980-05-12012 May 1980 Submittal of LER 1980-006-00 Purge Valve T-Ring Air Supplies ML18348A9051980-05-12012 May 1980 Submittal of LER 1980-008-00 Update of Valve Leakage ML18347B1411978-09-0606 September 1978 LER 1978-029-00 for Palisades Plant Re Lower Level of Hydrazine in Iodine Removal Tank Due to Approximately 6% of Drainage from the Tank T-102 ML18347B1421978-08-18018 August 1978 LER 1978-028-00 for Palisades Plant Re Containment Building Purge Valve T-Ring in CV-1806 Was Not Pressurized ML18347B1441978-08-11011 August 1978 LER 1978-022-00 for Palisades Plant Re Four Incore Alarms Following Reactor Start-up ML18347B1451978-08-10010 August 1978 LER 1978-021-00 for Palisades Nuclear Plant, Containment Purge Supply Valve CV-1808 Failed to Open During Monthly Test ML18347B1491978-07-20020 July 1978 LER 1978-024-00 & LER 1978-025-00 for Palisades Nuclear Plant, Steam Generator Ph Dropped to 8.02 & One of Two Heaters for T-53B (Concentrated Boric Acid Tank) Failed ML18347B1781978-04-28028 April 1978 License Event Report LER-78-000-00 Re Out-of-Sequence Rod Withdrawal ML18347B1801978-04-19019 April 1978 License Event Report 78-008: Cycle 2 Core Axial Power Distribution Limits of TS 3.10.3 Were Exceeded by Approximately 12% for Steady State Operation During Cycle 2 ML18347B1811978-03-27027 March 1978 License Event Report 1978-007-00 Relates to Electrical Connectors Inside of Containment ML18347B1841978-03-13013 March 1978 Two Updated License Event Reports, LER-78-004 & LER-78-006 ML18348A1951978-03-0202 March 1978 License Event Report 1978-006-00 Re Shipping Cask Movement ML18347B1851978-03-0202 March 1978 License Event Report 1978-005-00 Re Steam Generator Level Instrumentation ML18348A1961978-03-0101 March 1978 License Event Report 1978-004-00 Re Steam Generator Pressure Instrumentation ML18348A1981978-02-0101 February 1978 License Event Report 1978-003-00 Re CV-3025 Failed Closed ML18348A1971978-02-0101 February 1978 License Event Report 1977-065-00 Re Operation in a Degraded Mode Permitted by a Limiting Condition for Operation ML18348A1991978-01-20020 January 1978 LER 1977-063-00 Re Iodine Removal System Hydrazene Tank, LER 1978-001-00 Re Containment Door Interlock Failure & LER 1978-002-00 Re Setpoints of Five Valves Were Outside Band ML18348A2001978-01-0606 January 1978 License Event Report 1977-062-00 Re Iodine Removal System Naoh Tank (T-103) ML18348A2011978-01-0606 January 1978 License Event Report 1977-064-00 Re HPSI Pump P-66B ML18348A2021977-12-21021 December 1977 LER 1977-054-00 Re Four Coincident In-Core Alarms, LER 1977-057-00 Re Pressure Set Point for Channel C, & LER 1977-058-00 Re De-Energized R Bus ML18348A2031977-12-16016 December 1977 License Event Report 1977-055-00 Re Loss of Off-Site Power and Plant Trip ML18348A2041977-12-12012 December 1977 License Event Report 1977-056-00 Re Gaseous Waste Discharge 2018-12-10
[Table view] |
Text
{{#Wiki_filter:.c* ,. ~
~L i
..\;,
**ii
**~
VEA130(1308lCl-019949C195)PD 07(14/75 1305 TLX CONSPOWER JKN ZCZC 002 DLY JACKSON MICHIGAN 7-14-75 PMS USNRC ~-o,.)~s l"iR KEN BAKER
(
NUCLEAR REGULATORY COMMISSION REG ION II I*
(
799 ROOSEVELT ROAD
- GLEN~ELLYN, IL 60137 THIS TWX IS TO DOCUMENT OUR TELEPHONE CONVERSATION ON 7-13-75~
WHICH WAS TO REPORT THE INOPERABLE STATUS OF CONTROL ROD NO 27.
THIS INCIDENT WILL BE REPORTED AS AN UNUSUAL EVENT, CODE NUMBER UE-75-7, TITLED, "CONTROL ROD FAILURE TO INSERT ... " THIS TWX*
WILL BE FOLLOWED BY A FOR~AL REPORT AS REQUIRED BY TECH SPEC i
\:.
SF-1201 ~~
CC: R B SEWELL
(.:
K W BERRY PALISADES NUCLEAR PLANT
(
CONSUMERS POWER COMPANY
{
\...~
. ALL CH
(
"*--* NrHJN I'
'"-* SF-1201 (RS-{;9) i_
.;v .
'/
j I*
I
\
. \
(.
VEA072 ( 1008> ( 1-009 792C203 >PD 0.7 /22/75. 1004 TLX CONSPOWER JKN ZCZC 001 DLY'JACKSON MICHIGAN 7-22-75 PMS MR KEN BAKER USNRC REGION I I i r-1 3-,_
.lr.2 -z QPR NO-~ .
799 ROOSEVELT ROAD GLEN ELLYN, IL 6-013 7 . *.~:;!o~RNO .--~~~~-~~~
. TELEPHONED 10
. ll f -----;-----...,(J;Jfl-
. DATE DLD
ffJ*/ TIME ___
-/-z_Qi'-_;;LJ)
SUBJECT.: PALISADES PLANT 'A.'l"l'EMP'l'S* TO DELIVER:
.AB NORMAL OCCURRENCE ------------------
MOV - 3011 IMPROPER OPERATION THIS MESSAGE .IS TO CORRECT A CONVErSATION MR G B SLADE HAD WITH YOU sF-1201 ckJ~5 HOURS, JULY 19, 1975 CONCERNING AN ABNORMAL OCCURRENCE AT PALISADES RELATING TO THE IMPROPER FUNCTIONING OF THE MOV-3011. DUR-ING THE Q0-1 TEST PER PRC 75-41 ~ 7-21-75. THIS OCCURRENCE WAS DE-TERMINED NOT TO BE AN ABNORMAL OCCURRENCE AS REPORTED BUT AN UNUSAL EVET - UE 75-60 DETAILS WILL BE PRESENTED IN THE FORMAL REPORT *.
PER YOUR *REQUEST THE SWITCH THAT FAILED WAS GE TYPE CR 2940 -
SPRING RETURN - BAT LEVER OPERATION~
CORRECTION - SHOULD BE . EVENT - UE 75-6.
c.
CC: R B SEWELL D K POWERS/J G LEWIS*
t:. SF-1201 ~~Jg)I SADE s PL ANT c
CONSUMERS POWER CO *--*
C ALL HO NNNN
( ._.
. . ,. . .... '"'* ':ir
. . . ,...- p;, ..... ..:0 VEC185 (1532) u.:..o30255A206)PD 0712?/.J~\JU.5'2:& 1 Ii ~* .
c TLX CONSPOWER JKN
zczc 00005 . } ....
3-~ '2 Colri11~1IC:SION, (/ NO.~---
PMS KEN BAKER NUCLEAR REGULATORY .., 3/.}BOOK NO. *-----:*--
AC- - - [,,-)3 c?PR. (a (o .
TELEPHON:-: N"'.R. _______ s_S_o_ __~_;J_.... __.___Q_
REGION III TELEPHONE8 T0 ___8.J'-'--------*- **---- ____ f\Y --~><--...l.L(,_
799 ROOSEVELT ROAD DATE DLD. 0 ) ft} TIME ___ :L3-_$_f_.
( GLEN ELLYN, IL 60137 ATT.EMPTS TO* DEU-iJ'C. * :
PALISADES NUCLEAR ?LANT IS DECLARING ITSELF UNDER ABNORMAL OPERATING CONDITIONS AS SPECIFIED IN TECH SPEC SECTION 5-2s2 ~S OF 7-16-75.
THE T-91 TANK UTILITY WATER STORAGE TANK WAS REMOVED FHOM NORMAL SERVICE TO REPLACE THE LINER COATING. THE COATING MODIFICATION WILL TAKE APPROXIMATELY FOUR WEEKS. THE T-90 TANK, PRIMARY SYSTEM MAKE-UP STORAGE lANK, WILL ALSO HAVE A COATING MOblFICATION IN THE SF-1201 (R5-tW . . . .
t- ***-----. - .
NEAR FUTUREo THESE TANKS BEING OUT OF SERVICE MAKES NORMAL OPERATION
\_
IMPOSSIBLE.
J G LEWIS/I P ~EAL CONSUMERS PO~JER COMPANY
( PALISADES NUCLEAR PLANT CB\IJ CC: R B SEWELL J L BACOl\t NNMN
* . *,i}Mlf~
SF-1201 CRS-691 U\J . ., *.'* '!""- *-:~,,
\
\
. -*-**,* . UNITED STATES ..
NUCLEAR REGULATORY *cQMMJS::.10N OFFICE OF INSPECTION AND ENFORCEMENT REGION Ill .
799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS 60137 A. IE Inspection Report No.
*Transmittal Date \
Distribution: Distribution:
IE Chief, . FS&EB . IE Chief, FS&EB IE:HQ (5)
DR Central Files L:D/D for Fuels & Materials Regul.atory Standards (3) .DR Central.Files Licensing (13) *IE Files IE Files IE Chief, - M&PPB L:D/D for Reactor Project B. IE Inquiry Report No.
Transmittal Date _
Distribution: Distribution:
IE Chief, FS&EB *:tE Chief, FS&EB IE:HQ (5) IE:HQ DR Central Files DR Central Files Regulatory Standards .(3) IE Files Licensing (13)
IE Files C. Incident Notification From: Consumers Power Company 50-255 (Licensee,& Docket No. (or License No.)*
Transmittal Date July 31, 197 5 Palisades Plant Distribution: Distribution:
IE Chief, FS&EB IE Chief, FS&EB IE:HQ (4) . IE:HQ (4)
Licensing (4) L:D/D for Fuels & Materials DR Central Files
- DR Central Files IE Files IE Files
\ ' . ~i-~-~*Y;~
. I
~*}}