consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 December 1, 1976 USNuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re:
LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, Docket No. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of November 1976.
Also enclosed is a revised copy of Appendix A for the month of October 1976 reflecting.1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> erroneously reported for the Hours Critical, and a correction in the Gross Thermal Energy Generated.
William E. Adams General Engineer cc:
JGKeppler, NRC RBDeWitt RB Sewell DEVanFarowe, Diliv. of Radiological Lansing, Mich.
Document Control
___ :.~-*-*-**- ---------~*
APPENDIX D Palisades UNIT------~--
DATE Dec. 1, 1976 616 764-8913 COMPLETES BY DIBollnow DOCKET N0. __
5_0_-_2_5_5 ____ _
OPERATING STATCS
- l.
REPORTING PERIOD: __
-..:..7-=-6=1-=-0-=-0::.1 ________ THROUGH 761031 HOt.:RS IN REPORTI:\\G PERIOD:
7 45
___,,~~
- 2.
CURRENTLY ACTHORIZED POWER LEVEL (MWth) 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY} (MWe-NET): __________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD 5..
HOURS REACTOR WAS CRITICAL.......*****.
- 6.
REACTOR RESERVE SHUTDOWN HOURS.*****.
- 7.
. HOURS GENERATOR ON LINE......****.****
- 8.
\\JNJT RESERVE SHUTDOWN HOURS *..*..****.
~.
GROSSTHERM~LENERGY 584.8 577.4 GENERATED (:>IWH). * * * *. *.. *.. *. * * * * *.
- 1, 208, 304
- 10.
GROSS ELECTRICAL ENERGY
- 11.
-GEi\\ERATED (:>!WH)... : **....*....******
NET ELECTRICAL ENERGY GENERATED
(~IWH)....** * *****.**.**.*.****.*.*.
RE.-\\CTOR AV Al LA BI LITY FACTOR (I).**.*....
UNIT AVAILABILITY FACTOR (2)......*..*.*
l 1NIT CAP..\\CITY FACTOR (3)....**.***.***.
UNIT FORCED OUTAGE RATE (4)........**..
382,340 359,455.
78.5%
70.5%.
22.5%
CU.MULA TlVE YR TO DATE TO DATE 32880.4 19 i 967.4 3,601.4 182575.2 7,051,032 30,070,992 2,199,790 9;346,440 22056,45~
827382101 53.0%
47.1% -
~9.2%
43.8%.. **:
41.1%
3*3. 2%
14.1%
49.5%
- 12.
l3.
- 14.
- 15.
- 16.
SHL;TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
- 18.
(I l (3)
IF SHL'.T DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:-------------
UNITS IN TEST STATUS (PRIOR TO co~nlERCIAL OPERATION) REPORT THE FOLLOWING:
REACTOR A \\'AILABI LITY FACTOR l:NlT AVAILABILITY fACTOR U:-llT CAPACITY FACTOR t:~IT FORCED Ol'T AGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION C0;\\1i\\IERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
-~~-~~-~~~-~~xroo HOURS IN REPORTl:-.:G PERIOD NFT ELF.CTR IC AL POWFR GE'.'IERA TED DATE LAST FORECAST DATE ACHIEVED MAX. DEPEND.'\\ULE CAPACITY (I\\lW.-:-NET) X HOURS lN REPORTING l'ERIUIJ FORCED OUTAGE HOURS
~-~~~--~-~~---~~x100 HOURS GENERATOR ON Ll~E +FORCED OUTAGE HOURS 1.16-D-l
APPENDIX D OPERATING STATCS e*
UNIT Palisades DATE Dec. 1, 1976 "616-764-8913 CO:'>IPLETED BY ~D~I=B~o~l~l~n=o~w~---
DO 50-255 CKET NO. ________
- 1.
REPORTING PERIOD: ____ 7_6_l_l_O_l_* ---~--- THROUGH __
7_6_1_1_3_0 _______ _..._
HOt:RS IN REPORTI:\\'G PERIOD: _____.;..7_2-'-0----------------------...,;.
- 2.
CURRENTLY ACTHORIZED POWER LEVEL (MWth) 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) _,6_..,8....,4,.___
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY} (.MWe-NET): __________
- 4.
REASO~S FOR RESTRICTION (If ANY):
THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL.....*.*.****
- 6.
REACTOR RESERVE SHUTDOWN HOURS ***...*
7.*. HOURS GENERATOR ON LINE...*.*..*******
- 8.
lrN!T RESERVE Slll)TDOWN HOURS *..********
- 9.
GROSS THER'.\\fAL ENERGY.
574.1 537.2 GENERATED ('.\\IWH). * * * *.. *... * * * *. *. * *
- 1, 080, 384
- 10.
GROSS ELECTRICAL ENERGY
- 11.
-GENERATED ('.\\IWH).*. :.*.**..*.********
NET ELECTRICAL ENERGY GENERATED
_34 7' 280 326,235
. CU'.\\IULATIVE YR TO DATE TO 0.-\\TE 4!454.5
~~
42138.6 192112.4 8,131,416 31!151~376 2,547,070 9,693,720 2,382,690 9,064,33~
- 12.
- 13.
- 14.
- 15.
(:-.IWH)
RE.-\\CTOR AVAILABILITY FACTOR (1) *********
UNIT A \\"AlLABILITY FACTOR (2) *.**********
l 1NIT CAPACITY FACTOR (3)....**.....*...
UNIT FORCED OUTAGE RATE (4) *.......**..
79.7%
,55.4%
47 ;7%*
74.6%
- 51.5%
44.3%.-
66.3%
~3. 3%
33.8%
25.4%
- 15. 7%.
49.1%
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHt:T DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTt:P: ______
~--~------
- 18.
UNITS IN TEST STATUS (PRIOR TO COM~tERCIAL OPERATION) REPORT THE FOLLOWING:
(l)
REACfOR A\\'AILABILITY FACTOR l:NIT AVAILABILITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOliRS GENERATOR ON Ll'.'1E
XlOO HOURS IN REPORTI:-;G PERIOD DATE LAST FORECAST DATE ACHIEVED i
(3)
UNIT CAPACITY FACTOR
{.~ t41 CN!T FORCCD Ol'TAGE RATE NF.T ELF.CTRIC.-\\L POWFR GF~ERATED MAX. DEPENIJAHLI: CAPACITY ('.\\[We-NET) X HOURS IN REPORTINl; l'EKIOU FORCED OUTAGE HOURS
XlOO HOliRS GENERATOR ON Ll:\\E +FORCED OUTAGE HOURS l<
1.16-D-l
.. : t _,..
~: r*
.9J
,.q'
~~;.
APPENDIXC DOCKET NO. __
5_0_=2_5_5 __
UNIT __
P_a_l_i_sa_d_e_s_
DA TE _..:.1.:::..2--=l=-.;_....r...7.!.l..6'--. _
COMPLETED BY DIBollnow AVERAGE.DAILY UNIT POWER LEVEL MONTH No::2:emhe:i:: 1976
. AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY
{.MWe-net)
DAY (MWe-net}
1 667 17*
. 31 2
660 18 313 3
662 19 596
.4 663 20 661 5
656 21 660 6
653 22 656
. 660 7
659 23 8
- 657, 24 604...
0 9
650 25 10 658 26 0
1.1 6~6
- 27.
. 232.
12 29 28 620 13 0
29 651 14 0
30 650 15
- 0 31 16 0
DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the ncar.:st whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum.
dependable capacity for the net dectric:il rating of the unit. there may be occasions when the daily.
average power level exceeds the I 00% line (or the restricted power level-line). In such cases, the rt 1.) average daily unit power output sheet should be footnoted to c.xpbin the apparent anomaly.
~
v 1.16-C-I
- 'i:*
- t *i1*r
,...; *...,.,.., r*
f.;~
.. ~*-..*----~~*--~---!
TYPE F*FORCED DURATION NO.
DATE S*SCHEDULED (HOURS) 15 761112 F
128.6 16 761124 F
21.9 17 761125 F
32.3 APPENDIX E UNIT SHUTDOWNS DOCK ET NO. _5_0_-_25_5 __ -'--_
UNIT NAME _P_a_l_i_s_*a_d_es ____,
DA TE _n_e_c_e_m_b_e_r_l_, _1_9_7 6
.COMPLETED BY DIBollnow REPORT M 0 NTH _ _.N..... o,_,.v'-'"e""'rn""'"h.....
er...._1._9"-'7_,.6,___
METHOD OF
~HUTTING DOWN REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS/COMMENTS A
3 Control Rod Drive repairs A
3 Generator Voltage Regulator repairs A
3 Generator Voltage Regulator Repairs (l) REASON (2) METHOD A* -EQUIPMENT FAlLl:Jlff (EXPLAIN)
I-MANUAL B-MAINT. OR TEST 2-MANUAL C-REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMIN!STRATIVE G-Ol'ERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
SUMMARY
The Plant operated at a nominal 99% rated power *for m.ost of the month.
The forced shutdowns were due to CRD Seal Leakage -and Generator Voltage regu).ator malfunctions.