Monthly Operating Data for November 1977 & Revised Appendix a for Month of October 1976 Reflecting .1 Hour Erroneously Reported for Hours Critical, & Correction in Gross Thermal Energy Generated
ML18347B214
Person / Time
Site: Palisades 
Issue date: 12/01/1976
From: Adams W
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347B214 (5)


Text

consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 December 1, 1976 USNuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re:

LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, Docket No. 50-255 Gentlemen:

Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of November 1976.

Also enclosed is a revised copy of Appendix A for the month of October 1976 reflecting.1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> erroneously reported for the Hours Critical, and a correction in the Gross Thermal Energy Generated.

William E. Adams General Engineer cc:

JGKeppler, NRC RBDeWitt RB Sewell DEVanFarowe, Diliv. of Radiological Lansing, Mich.

Document Control

___ :.~-*-*-**- ---------~*

APPENDIX D Palisades UNIT------~--

DATE Dec. 1, 1976 616 764-8913 COMPLETES BY DIBollnow DOCKET N0. __

5_0_-_2_5_5 ____ _

OPERATING STATCS

l.

REPORTING PERIOD: __

-..:..7-=-6=1-=-0-=-0::.1 ________ THROUGH 761031 HOt.:RS IN REPORTI:\\G PERIOD:

7 45

___,,~~

2.

CURRENTLY ACTHORIZED POWER LEVEL (MWth) 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684

3.

LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY} (MWe-NET): __________ _

4.

REASONS FOR RESTRICTION (IF ANY):

THIS REPORTING PERIOD 5..

HOURS REACTOR WAS CRITICAL.......*****.

6.

REACTOR RESERVE SHUTDOWN HOURS.*****.

7.

. HOURS GENERATOR ON LINE......****.****

8.

\\JNJT RESERVE SHUTDOWN HOURS *..*..****.

~.

GROSSTHERM~LENERGY 584.8 577.4 GENERATED (:>IWH). * * * *. *.. *.. *. * * * * *.

  • 1, 208, 304
10.

GROSS ELECTRICAL ENERGY

11.

-GEi\\ERATED (:>!WH)... : **....*....******

NET ELECTRICAL ENERGY GENERATED

(~IWH)....** * *****.**.**.*.****.*.*.

RE.-\\CTOR AV Al LA BI LITY FACTOR (I).**.*....

UNIT AVAILABILITY FACTOR (2)......*..*.*

l 1NIT CAP..\\CITY FACTOR (3)....**.***.***.

UNIT FORCED OUTAGE RATE (4)........**..

382,340 359,455.

78.5%

70.5%.

22.5%

CU.MULA TlVE YR TO DATE TO DATE 32880.4 19 i 967.4 3,601.4 182575.2 7,051,032 30,070,992 2,199,790 9;346,440 22056,45~

827382101 53.0%

47.1% -

~9.2%

43.8%.. **:

41.1%

3*3. 2%

14.1%

49.5%

12.

l3.

14.
15.
16.

SHL;TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

17.
18.

(I l (3)

IF SHL'.T DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:-------------

UNITS IN TEST STATUS (PRIOR TO co~nlERCIAL OPERATION) REPORT THE FOLLOWING:

REACTOR A \\'AILABI LITY FACTOR l:NlT AVAILABILITY fACTOR U:-llT CAPACITY FACTOR t:~IT FORCED Ol'T AGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION C0;\\1i\\IERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE

-~~-~~-~~~-~~xroo HOURS IN REPORTl:-.:G PERIOD NFT ELF.CTR IC AL POWFR GE'.'IERA TED DATE LAST FORECAST DATE ACHIEVED MAX. DEPEND.'\\ULE CAPACITY (I\\lW.-:-NET) X HOURS lN REPORTING l'ERIUIJ FORCED OUTAGE HOURS


~-~~~--~-~~---~~x100 HOURS GENERATOR ON Ll~E +FORCED OUTAGE HOURS 1.16-D-l

APPENDIX D OPERATING STATCS e*

UNIT Palisades DATE Dec. 1, 1976 "616-764-8913 CO:'>IPLETED BY ~D~I=B~o~l~l~n=o~w~---

DO 50-255 CKET NO. ________

1.

REPORTING PERIOD: ____ 7_6_l_l_O_l_* ---~--- THROUGH __

7_6_1_1_3_0 _______ _..._

HOt:RS IN REPORTI:\\'G PERIOD: _____.;..7_2-'-0----------------------...,;.

2.

CURRENTLY ACTHORIZED POWER LEVEL (MWth) 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) _,6_..,8....,4,.___

3.

LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY} (.MWe-NET): __________

4.

REASO~S FOR RESTRICTION (If ANY):

THIS REPORTING PERIOD S.

HOURS REACTOR WAS CRITICAL.....*.*.****

6.

REACTOR RESERVE SHUTDOWN HOURS ***...*

7.*. HOURS GENERATOR ON LINE...*.*..*******

8.

lrN!T RESERVE Slll)TDOWN HOURS *..********

9.

GROSS THER'.\\fAL ENERGY.

574.1 537.2 GENERATED ('.\\IWH). * * * *.. *... * * * *. *. * *

  • 1, 080, 384
10.

GROSS ELECTRICAL ENERGY

11.

-GENERATED ('.\\IWH).*. :.*.**..*.********

NET ELECTRICAL ENERGY GENERATED

_34 7' 280 326,235

. CU'.\\IULATIVE YR TO DATE TO 0.-\\TE 4!454.5

~~

42138.6 192112.4 8,131,416 31!151~376 2,547,070 9,693,720 2,382,690 9,064,33~

12.
13.
14.
15.

(:-.IWH)

RE.-\\CTOR AVAILABILITY FACTOR (1) *********

UNIT A \\"AlLABILITY FACTOR (2) *.**********

l 1NIT CAPACITY FACTOR (3)....**.....*...

UNIT FORCED OUTAGE RATE (4) *.......**..

79.7%

,55.4%

47 ;7%*

74.6%

  • 51.5%

44.3%.-

66.3%

~3. 3%

33.8%

25.4%

15. 7%.

49.1%

16.

SHUTDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

17.

IF SHt:T DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTt:P: ______

~--~------

18.

UNITS IN TEST STATUS (PRIOR TO COM~tERCIAL OPERATION) REPORT THE FOLLOWING:

(l)

REACfOR A\\'AILABILITY FACTOR l:NIT AVAILABILITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOliRS GENERATOR ON Ll'.'1E


XlOO HOURS IN REPORTI:-;G PERIOD DATE LAST FORECAST DATE ACHIEVED i

(3)

UNIT CAPACITY FACTOR

{.~ t41 CN!T FORCCD Ol'TAGE RATE NF.T ELF.CTRIC.-\\L POWFR GF~ERATED MAX. DEPENIJAHLI: CAPACITY ('.\\[We-NET) X HOURS IN REPORTINl; l'EKIOU FORCED OUTAGE HOURS


XlOO HOliRS GENERATOR ON Ll:\\E +FORCED OUTAGE HOURS l<

1.16-D-l

.. : t _,..

~: r*

.9J

,.q'

~~;.

APPENDIXC DOCKET NO. __

5_0_=2_5_5 __

UNIT __

P_a_l_i_sa_d_e_s_

DA TE _..:.1.:::..2--=l=-.;_....r...7.!.l..6'--. _

COMPLETED BY DIBollnow AVERAGE.DAILY UNIT POWER LEVEL MONTH No::2:emhe:i:: 1976

. AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY

{.MWe-net)

DAY (MWe-net}

1 667 17*

. 31 2

660 18 313 3

662 19 596

.4 663 20 661 5

656 21 660 6

653 22 656

. 660 7

659 23 8

657, 24 604...

0 9

650 25 10 658 26 0

1.1 6~6

27.

. 232.

12 29 28 620 13 0

29 651 14 0

30 650 15

- 0 31 16 0

DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the ncar.:st whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum.

dependable capacity for the net dectric:il rating of the unit. there may be occasions when the daily.

average power level exceeds the I 00% line (or the restricted power level-line). In such cases, the rt 1.) average daily unit power output sheet should be footnoted to c.xpbin the apparent anomaly.

~

v 1.16-C-I

'i:*
  • t *i1*r

,...; *...,.,.., r*

f.;~

.. ~*-..*----~~*--~---!

TYPE F*FORCED DURATION NO.

DATE S*SCHEDULED (HOURS) 15 761112 F

128.6 16 761124 F

21.9 17 761125 F

32.3 APPENDIX E UNIT SHUTDOWNS DOCK ET NO. _5_0_-_25_5 __ -'--_

UNIT NAME _P_a_l_i_s_*a_d_es ____,

DA TE _n_e_c_e_m_b_e_r_l_, _1_9_7 6

.COMPLETED BY DIBollnow REPORT M 0 NTH _ _.N..... o,_,.v'-'"e""'rn""'"h.....

er...._1._9"-'7_,.6,___

METHOD OF

~HUTTING DOWN REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS/COMMENTS A

3 Control Rod Drive repairs A

3 Generator Voltage Regulator repairs A

3 Generator Voltage Regulator Repairs (l) REASON (2) METHOD A* -EQUIPMENT FAlLl:Jlff (EXPLAIN)

I-MANUAL B-MAINT. OR TEST 2-MANUAL C-REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMIN!STRATIVE G-Ol'ERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

SUMMARY

The Plant operated at a nominal 99% rated power *for m.ost of the month.

The forced shutdowns were due to CRD Seal Leakage -and Generator Voltage regu).ator malfunctions.