ML18347A676
| ML18347A676 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 04/15/1976 |
| From: | Bixel D Consumers Power Co |
| To: | Purple R Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18347A676 (1) | |
Text
consumers Power company General Offices: 212 West Michigan Avenue, Jackson, Michigan 49201
- Area Code 517 788-0550 April l5, l976 Director of Nuclear Reactor Regulation Att:
Mr Robert A. Purple, Chief Operating Reactor Branch No 1 US Nuclear Regulatory Comm.iss.ion Washington, DC 20555 DOCKET 50-255, LICENSE DPR PALISADES PLANT - ADDITIONAL RESPONSE TO QUESTION 4.A,4 -
CYCLE 2, RELOAD FUEL This letter is written to provide additional information with respect to Question 4.A.4 (see letter dated March 10, 1976),
Other responses to this question were submitted by letters dat~d March 20 and April 8, 1976.
With respect to the supplemental analysis provided with our April 8, 1976 letter (1.0 DES/PD break), Exxon Nuclear has reviewed the analysis for peak metal-water reaction and found that the maximum oxidation at any point is nine to ten percent.
The total hydrogen release is calculated to correspond to much less than one percent of the zirconium reacting with water.
This analysis was presented as "Preliminary.".However, the numbers (results) contained in the analysis are considered final, David A. Bixel Assistant Nuclear Licensing Administrator CC:
JGKeppler, USNRC