ML18347A656

From kanterella
Jump to navigation Jump to search
6/7/1976 Letter Requesting Evaluation Schedule for Adequacy of Pressure Vessel Support, Letter Advising, Will Response After Scheduled Meeting with NRC in Two Weeks
ML18347A656
Person / Time
Site: Palisades 
Issue date: 06/24/1976
From: Bixel D
Consumers Power Co
To: Schwencer A
Office of Nuclear Reactor Regulation
References
Download: ML18347A656 (1)


Text

consumers Power company General Offices: 212 West Michigan Avenue,.Jackson, Michigan 49201

  • Area Code 517 788-0550 June 24, 1976 Director of Nuclear Reactor Regulation Att:

Mr A. Schwencer, Chief Operating Reactor Branch No 1 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255, LICENSE DPR-20 PALISADES PLANT, VESSEL TRANSIENT LOADS Your letter dated June 7~ 1976 requested that we inform you within*30 days of our schedule for providing you with our evaluation of the adequacy of the pressure vessel supports.

Since receipt of this request, a meeting has been scheduled between members of a Combustion Engineering Users Group and members of your staff.

We believe that the results of this meeting should be prop-erly considered in our proposed schedule for evaluation of the vessel supports and, therefore, plan to provide a response to your request within two weeks of this meeting.

David A. Bixel Assistant Nuclear Licensing Administrator CC:

JGKeppler, USNRC