ML18347A526

From kanterella
Jump to navigation Jump to search
Submits Report of Eddy Current Testing, Data Evaluation and Tube Plugging, March 1976 & Request Tech Spec Change, as a Result of This Testing Program
ML18347A526
Person / Time
Site: Palisades 
Issue date: 03/09/1976
From: Bixel D
Consumers Power Co
To: Purple R
Office of Nuclear Reactor Regulation
References
Download: ML18347A526 (1)


Text

consumers Power company General Offices: 212 West Michigan Avenue, Jackson, Michigan 49201

  • Area Code 517 788-0550 March 9, 1976 Director of Nuclear Reactor Regulation Att:

Mr Robert A. Purple, Chief Operating Reactor Branch No 1 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255, LICENSE DPR-20 PALISADES PLANT -

MARCH 1976 EDDY CURRENT TEST REPORT Al~D TECHNICAL SPECIFICATIONS CHANGE REQUEST An eddy current inspection of the Palisades steam generators has been conducted in accordance with the Palisades Plant Technical Specification 4.14.

Prelim-inary results of this inspection were discussed at a meeting held with members of your staff on February 26, 1976.

The final report entitled "Report of Eddy Current Testing, Data Evaluation and Tube Plugging, March 1976" is attached as Enclosure A.

As a result of this testing program and other analyses submitted previously, a proposed Technical Specifications change has.been developed.

This proposed change augments that proposed by letter dated January 30, 1976 and is attached as Enclosure B.

<BJao/

David A. Bixel Assistant Nuclear Licensing Administrator CC:

JGKeppler, USNRC 2419