OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION December 14, 2018 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 And 2 NRC INSPECTION REPORT 05000254/2018201 AND 05000265/2018201
Dear Mr. Hanson:
On December 4, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Quad Cities Nuclear Power Station. The NRC inspectors discussed the results of this inspection with Mr. Ken Ohr, Site Vice President, and other members of your staff.
The results of this inspection are documented in the enclosed report.
NRC inspectors documented one finding of very low security significance (Green) and one unresolved item in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement; and the NRC resident inspector at the Quad Cities Nuclear Power Station.
If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security, and Incident Response; and the NRC resident inspector at the Quad Cities Nuclear Power Station.
The enclosure transmitted herewith contains Sensitive, Unclassified, and Non-Safeguards Information. When separated from the enclosure, this transmittal document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION B. Hanson 2
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION This letter will be available for public inspection at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Request for Withholding.
The enclosed report contains Security-Related Information and will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(B)(1)(ii).
Sincerely,
/RA/
Danté Johnson, Branch Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security Incident Response Docket No.: 50-254 & 50-265 License No.: DPR-29 & DPR-30 Nonpublic
Enclosure:
Inspection Report 05000254/2018201 05000265/2018201 cc w/ Encl: Ken Ohr, Site Vice President Archie Williams, Jr., Manager, Site Security
ML18344A595 Pkg. ML18344A596 Cover Letter, ML18344A600 Report OFFICE NSIR/DSO NSIR/DSO RIII NSIR/DSO/SPEB NAME R. Richardson J. Berry S. Orth D. Johnson SIGNATURE DATE 12/12/18 12/12/18 12/12/18 12/14/18