IR 05000335/2018412

From kanterella
(Redirected from ML18333A013)
Jump to navigation Jump to search
NRC Security Inspection Report 05000335/2018412 and 05000389/2018412
ML18333A013
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/28/2018
From: Binoy Desai
Division of Reactor Safety II
To: Hernandez O
Florida Power & Light Co
References
IR 2018412
Download: ML18333A013 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 28, 2018

SUBJECT:

ST. LUCIE NUCLEAR PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000335/2018412 AND 05000389/2018412

Dear Mr. Hernandez:

On November 8, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your St. Lucie Nuclear Plant, Units 1 and 2, and discussed the results of this inspection with Dan DeBoer and other members of his staff. The results of this inspection are documented in the enclosed report.

The NRC inspector documented a finding of very low security significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or the significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the St. Lucie Nuclear Plant.

A cross-cutting aspect was assigned to the finding in the area of Human Performance.

Specifically, because St. Lucie Nuclear Plant failed to follow processes, procedures, and work instructions (H.8).

If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to Regional Administrator, Region II, and the NRC Resident Inspector at St. Lucie Nuclear Plant. This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Binoy Desai, Chief Plant Support Branch Division of Reactor Safety Docket Nos: 50-335 and 50-389 License Nos: DPR-67 and NPF-16 Enclosure:

NRC IR 05000335/2018412, and 389/2018412 w/Attachment: Supplemental Information (OUO)

cc: (See page 3) cc:

Andrew Brady Nuclear Fleet Security Florida Power & Light Company Mail Stop: NT3/JW 15430 Endeavor Drive Jupiter, FL 33478 Mano Nazar President and Chief Nuclear Officer Nuclear Division Florida Power & Light Company Mail Stop EX/JB 700 Universe Blvd.

Juno Beach, FL 33408 Michael J. Snyder Licensing Manager St. Lucie Nuclear Plant Florida Power & Light Co.

6501 S. Ocean Drive Jensen Beach, FL 34957 Dan DeBoer Site Director Florida Power & Light Company 6501 S. Ocean Drive Jensen Beach, FL 34957 ML18333A013 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB RII:DRS/PSB RII:DRS/PSB RII: DRP/BR3 RII:DRS/PSB SIGNATURE JOB2 JCS3 BBD RXM1 BBD NAME J. Brown J. Shehee B. Desai R. Musser B. Desai DATE 11/ 27 /2018 11/ 27 /2018 11/ 27 /2018 11/ 28 /2018 11/ 28 /2018 E-MAIL COPY YES NO YES NO YES NO YES NO YES NO