ML18330A086

From kanterella
Jump to navigation Jump to search
Letter to N. Smith Arkansas Followup Scheduling Letter and Questionnaire for May 2019
ML18330A086
Person / Time
Issue date: 11/26/2018
From: Michelle Beardsley
NRC/NMSS/DMSST/ASPB
To: Smith N
State of AR, Dept of Health
Beardsley M
References
Download: ML18330A086 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 26, 2018 Nathaniel Smith, M.D., MPH Director of Health and State Public Health Officer Arkansas Department of Health 4815 W. Markham Street Little Rock, AR 72205

Dear Dr. Smith:

The U.S. Nuclear Regulatory Commission (NRC) uses the Integrated Materials Performance Evaluation Program (IMPEP) for the evaluation of Agreement State programs. Per our previous discussion, I will be the team leader for the followup IMPEP review of the Arkansas Agreement State Program scheduled for May 21-23, 2019. The review team will include Randy Erickson, NRC Region IV, and Vanessa Danese, State of Texas.

Enclosed is the Integrated Materials Performance Evaluation Program Questionnaire. The questionnaire was previously provided to Bernard Bevill electronically on November 13, 2018. I ask that you send your responses via e-mail to michelle.beardsley@nrc.gov by May 6, 2019. I previously sent the questionnaire in advance of this IMPEP review scheduling letter, in order to provide time for you to allocate the staff resources necessary to complete the document by the requested date. I encourage you to use electronic documents and provide them in advance of the review to the extent possible, to allow team members to better prepare for the onsite review.

Also included with the questionnaire is the document Materials Requested to Be Available for the On-Site Portion of an IMPEP Review. We encourage States to have the items listed prepared prior to the IMPEP teams arrival.

I request that you set up an appointment with the appropriate State Senior Managers to discuss the results of the IMPEP review of the Arkansas Agreement State Program on May 23, 2019.

If you have any questions, please call me at 301-415-0275.

Sincerely,

/RA/

Michelle Beardsley, Health Physicist Agreement States Programs Branch Division of Materials Safety, Security, State, and Tribal Programs

Enclosure:

2019 Followup IMPEP Questionnaire cc: Bernard Bevill, Section Chief Radiation Control Section

SUBJECT:

Arkansas Followup FY2019 IMPEP Scheduling Letter and Questionnaire Distribution: (SP08)

RJohnson, ASPB DWhite, ASPB LRoldan-Otero, ASPB PMichalak, ASPB RErickson, RIV/RSAO VDanese, TX SHS ML18330A086 OFFICE IMPEP Tech Editor NMSS/MSST/ASPB NAME KMeyer MBeardsley via email DATE 11/26/18 11/26/18 OFFICIAL COPY

Approved by OMB1 Control No. 3150-0183 Expires 01/31/2020 INTEGRATED MATERIALS PERFORMANCE EVALUATION PROGRAM QUESTIONNAIRE Reporting Period: December 2, 2017 to May 6, 2019 Note: If there has been no change in the response to a specific question since the last IMPEP questionnaire, the State or Region may copy the previous answer, if appropriate.

A. GENERAL Please prepare a summary of the status of the State's or Region's actions taken in response to each of the open recommendations from previous IMPEP reviews.

B. COMMON PERFORMANCE INDICATOR I. Technical Quality of Licensing Actions

1. How many specific radioactive material licenses does your program regulate at this time?
2. Please identify any major, unusual, or complex licenses which were issued, received a major amendment, were terminated, decommissioned, submitted a bankruptcy notification or renewed in this period.
3. Discuss any variances in licensing policies and procedures or exemptions from the regulations granted during the review period.
4. What, if any, changes were made in your written licensing procedures (new procedures, updates, policy memoranda, etc.) during the reporting period?
5. Identify by licensee name and license number any renewal applications that have been pending for one year or more. Please indicate why these reviews have been delayed and describe your action plan to reduce the backlog.

1Estimated burden per response to comply with this voluntary collection request: 53 hours6.134259e-4 days <br />0.0147 hours <br />8.763227e-5 weeks <br />2.01665e-5 months <br />. Forward comments regarding burden estimate to the Records Management Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and to the Paperwork Reduction Project (3150-0183), Office of Management and Budget, Washington, DC 20503. If an information collection does not display a currently valid OMB control number, NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

MATERIALS REQUESTED TO BE AVAILABLE FOR THE ON-SITE PORTION OF AN IMPEP REVIEW Please have the following information available for use by the IMPEP review team when they arrive at your office:

  • List of open license cases, with date of original request, and dates of follow-up actions.
  • List of licenses terminated during review period.
  • Copy of current log or other document used to track licensing actions.
  • List of all licensing actions completed during the review period (sorted by license reviewer, if possible).
  • List of all licenses that your agency has imposed additional security requirements upon.

ALSO, PLEASE HAVE THE FOLLOWING DOCUMENTS AVAILABLE:

  • Standard license conditions
  • Technical procedures for licensing, model licenses, review guides 2