Inspection Manual Change Notice 18-039
ML18323A125
Person / Time
Issue date: 11/19/2018
From: Bridget Curran
NRC/NRR/DIRS/IRGB
To:
Curran B
Shared Package
ML18323A034 List:
References
CN 18-039
Download: ML18323A125 (1)


Text

NRC INSPECTION MANUAL DIRS Change Notice 18-039 DELETED: TRANSMITTED:

Number Date Number Date

1. IMC 2515 App D 10/03/17 IMC 2515 App D 11/19/18
2. IP 71111.18 11/17/16 IP 71111.18 11/19/18
3. IP 71111.22 06/15/15 IP 71111.22 11/19/18 TRAINING: No special training is required for any documents issued with this Change Notice.

REMARKS: IMC 2515 Appendix D, Plant Status, has been revised to address (1) comments provided by NRR/DMLR related to the period of extended operation, (2)

Feedback Forms 9900-2273 and 71111.08-2275 which resulted in creation of new IMC 0327, Steam Generator Tube Primary-To-Secondary Leakage, (3) use of mandatory and discretionary language with regards to steam generator tube primary-to-secondary leakage reports to NRR, and (4) a recommendation from the working group established to update the ROP for regulatory actions taken following the Fukushima Dai-ichi accident (ML17164A285).

IP 71111.18, Plant Modifications, has been revised to (1) Provide oversight of licensee commitments to update site specific SAMGs when the PWROG/BWROG issues revised generic severe accident technical guidelines.

Additional background information can be found in SRM SECY-15-0065 (ML15239A767) and a February 23, 2016 letter from the NRC to NEI (ML16032A029). (2) Conform to new IP format requirements found in IMC 0040 (ML18003A122).

IP 71111.22, Surveillance Testing, has been revised to (1) Address recommendations from the working group established to update the ROP for regulatory actions taken following the Fukushima Dai-ichi accident (ML17164A285). IP revised to allow for oversight of FLEX testing, and as a minimum, require one inspection sample per year. (2) Conform to new IP format requirements found in IMC 0040 (ML18003A122).