OMB 3150-0021, Draft 2019 Collection Renewal, 10 CFR Part 51 Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions - Burden Spreadsheet
ML18311A238
Person / Time
Issue date: 02/04/2019
From: William Ford
NRC/NRR/DMLR/MENB
To:
William Ford, DMLR/MENB, 415-1263
Shared Package
ML18311A226 List:
References
NRC-2018-0203, OMB 3150-0021
Download: ML18311A238 (2)


Text

Table 1 10 CFR Part 51 Annual Reporting Burden Respondents Responses Total Burden Per Annual Cost at Requirement Description Per Per Total Burden Responses Response $275/hr Year Respondent 51.6 Request for exemptions 2.6 1 2.6 5 13 $3,575 Request to withhold 51.16(b) proprietary information 0 1 0 10 0 $0 from disclosure Establishes NRCs general authority to require environmental 51.41 5 1 5 20 100 $27,500 information from applicants, as required (License amendments)

Establishes general requirements of 51.45 applicants Burden included under the specific ER reporting requirements Environmental Reports (ER) 51.50, 51.51, 50.52, ER for Combined 0.3 1 0.3 10,300 3,090 $849,750 and 50.55 License 51.50, 51.51, 50.52, ER for Construction 0 1 0 10,400 0 $0 and 50.55 Permit 51.50, 51.51, 50.52, ER for Amended Design 0 1 0 60 0 $0 and 50.55 Certification 51.50, 51.51, 50.52, ER for Early Site Permit 0.3 1 0.3 11,400 3,420 $940,500 and 50.55 51.50, 51.51, 50.52, ER for Design 1.3 1 1.3 60 78 $21,450 and 50.55 Certification Post-construction ER for 51.53 1.3 1 1.3 12,300 15,990 $4,397,250 License renewals Post-construction ER for 51.53 Research and Test 0.3 1 0.3 60 18 $4,950 Reactors Specific requirements for 51.54 applicants ER for 0 1 0 0 0 $0 Manufacturing License (States the number of 51.58 Burden included under the specific ER reporting requirements copies required)

Specific requirements for 51.60, 51.61, and applicants ER-Materials 4.6 1 4.6 1,668 7,673 $2,110,075 51.62 License (States the number of 51.66(a) and (b) Burden included under the specific ER reporting requirements copies to be filed)

Specific requirements for 51.68 petitioners ER- 1 1 1 80 80 $22,000 Rulemaking TOTAL 16.7 30,462.0 $8,377,050

Table 2 Annual Costs to the Federal Government Submissions NRC Staff Total Review Time Per Review Time Per Annual Cost at $275/hr Per Year Year Submission Request for exemptions 2.6 5 13.0 $3,575 Request to withhold proprietary information 0 10 0.0 $0 from disclosure License amendments 5 20.00 100.0 $27,500 ER for Combined 0.3 4,000.00 1,200.0 $330,000 License ER for Construction 0 6,240.00 0.0 $0 Permit ER for Amended Design 0 100.00 0.0 $0 Certification ER for Early Site Permit 0.3 7,300.00 2,190.0 $602,250 ER for Design 1.3 200.00 260.0 $71,500 Certification Post-construction ER for 1.3 4,100.00 5,330.0 $1,465,750 License renewals Post-construction ER for Research and Test 0.3 60.00 18.0 $4,950 Reactors Specific requirements for applicants ER for 0 4,000.00 0.0 $0 Manufacturing License Specific requirements for applicants ER-Materials 4.6 5,096.00 23,441.6 $6,446,440 License Specific requirements for petitioners ER- 1 80.00 80.0 $22,000 Rulemaking TOTAL 32,632.6 $8,973,965