ML18304A336

From kanterella
Jump to navigation Jump to search
Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 17. (Cover Letter Only)
ML18304A336
Person / Time
Site: Peach Bottom  
(DPR-012, DPR-044, DPR-056)
Issue date: 10/23/2018
From: Pat Navin
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML18304A336 (6)


Text

..,,

SAFEGUARDS INFORMATION

.,_ Exelon Generation~

October 23, 2018 U.S. Nuclear Regulatory Commission AITN: Document Control Desk Washington, D.C. 20555-0001

Subject:

Peach Bottom Atomic Power Station, Units 1, 2 and 3 Facility Operating License Nos. DPR-12, DPR-44 and DPR 56 NRC Docket Nos. 50-171, 50-277, 50-278 and 72-29 Peach Bottom Atomic Power Station Security Plan, Training iai,d Qualffi~1ign Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 17 In accordance with 10 CFR 50.54, "Conditions of licenses," p~ragfclph (pX2), Exelon Generation Company, LLC (EGC) is submitting Revision 17 to th~iPec1ch Bottom Atomic Power Station (PBAPS) Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation S~curlty,Program (Security Plan). The changes to the PBAPS Security Plan was implementeq en, OctoJ>~r 12, 2018. In accordance with 10 CFR 50.54(p)(2), EGC is submitting this change within 60 days of implementation (i.e.,

no later than December 11, 2018).

The PBAPS Security Plan, Training and Qualification Plan, and Safeguards Conti11gency Plan, and Independent Spent Fuel Storage Installation Security Program have been revised:

1. Section 11.3 of the PSP (refer to Attachment 2) *
2. Section 15.3 of the PSP (refer to Attachment 2)
3. Section 0-5 of the PSP Appendix D (refer to Attachment 2)

EGC has concluded that the changes do not decrease the safeguards effectiveness of the PBAPS Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program., Attachment 2, and Attachment 3 contain Safeguards Information. Therefore, EGC requests that this Information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding, 0 paragraph (a)(1 )(i), and 10 CFR 73.21, "Requirements for the protection of safeguards information,° paragraph (b)(1 )(i).

_soo 1 SAFEGUARDS INFORMATION ATTACHMENT 1, ATTACHMENT 2, and ATTACHMENT 3 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

\\

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission October 23, 2018 Page ~1 If you have any questions or require additional information, please contact Shelly Griffith at 717-456-3025.

Re~d Patrick D. Navin

. Site:Vlce President

. fl~ibh Bottom Atomic Power Station

'Exelon Generation Company, LLC Attachments: 1. Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 17 lncludlng Figures 1, 2, 3, and 4 (Contains Safeguards Information)

I

2. SY-M-101*-104-F-03, Table of Changes for Site Security Plan Change Submittals (Contains Safeguards Information)
3. 10 CFR 50.54(p) (Contains Safeguards Information) cc:

Regional Administrator - NRC Region I w/attachments CCN: 18-96 SAFEGUARDS INFORMATION ATTACHMENT 1, ATTACHMENT 2, and ATTACHMENT 3 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission October 23, 2018 Page3 bee:

Sr. Vice President, Mid-Atlantic Operations Sr. Vice President, Operations Support Vice President, Engineering Site Vice President, PBAPS Plant Manager, f;>BAPS

' Director, Operations, PBAPS Director, Security

.*. Manager; *Site Security/PBAPS Director, Site Training, PBAPS Manager, Regulatory Assurance, PBAPS.

Manager, Licensing - KSA3-E Commitment Coordinator - PBAPS Records Management - PBAPS SAFEGUARDS INFORMATION w/o attachments n

n n

n n

n II n

II II ATTACHMENT 1, ATTACHMENT 2, and ATTACHMENT 3 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

)

SAFEGUARDS INFORMATION ATTACHMENT 1 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Docket No. 50-171, 50-277, 50-278 and 72-29

,.* Peach Bottom*Atomic* Power. Station-Security:Plan, Training,and'Quallflcatlon'Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 17 (Includes Figures 1, 2, 3, and 4)

SAFEGUARDS INFORMATION ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION, UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION ATTACHMENT 2 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Docket No. 50-171, 50-277, 50-278 and 72-29 SY-AA*101*104-F*03, Table of Changes for Site Security Plan Change Submittals SAFEGUARDS INFORMATION ATTACHMENT 2 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION ATTACHMENT 3 Peach Bottom Atomic Power Station, Units 1, 2 and 3

' Docket No. 50-171, 50-277, 50-278 and 72-29 10 CFR 50.54(p) For Peach Bottom Atomic Power Station Physical Security Plan, Revision 17 SAFEGUARDS INFORMATION ATTACHMENT 3 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED