ML18297A152

From kanterella
Jump to navigation Jump to search
Submittal of Emergency Plan Implementing Procedure 5.7.1, Rev. 61
ML18297A152
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/18/2018
From: Shaw J
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML18297A157 List:
References
NLS2018057
Download: ML18297A152 (1)


Text

Nebraska Public Power District NLS2018057 October 18, 2018 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C. 20555-0001 Alwa:ys there when :you need us

Subject:

Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, License No. DPR-46

Dear Sir or Madam:

50.54(q) The purpose of this letter is to report a change to Emergency Plan Implementing Procedure (EPIP) 5.7.1, Emergency Classification (Revision,61), and provide a summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP. This letter contains no commitments.

If you have any questions regarding this submittal, please contact me at (402) 825-2788.

Sincerely, /If;,# ./ Jim Shaw / / (/Licensing Manager /bk

Attachment:

Report of Change and Summary of 50.54( q) Analysis Emergency Plan Implementing Procedure

5. 7 .1, Revision 61

Enclosure:

Emergency Plan Implementing Procedure

5. 7 .1, Revision 61 cc: Regional Administrator, w/ attachment and enclosure (2) USNRC -Region IV Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/ attachment ( enclosure per controlled document distribution)

USNRC-CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, w/ attachment and w/o enclosure COOPER NUCLEAR STATION P.O. Box 98 / Brownv11/e, NE 68321-0098 Telephone:

(402) 825-3811 / Fax: (402) 825-5211 www.nppd.com