ML18289A383
| ML18289A383 | |
| Person / Time | |
|---|---|
| Site: | 07100963 |
| Issue date: | 10/11/2018 |
| From: | Patricia Silva NRC/NMSS/DSFM/IOB |
| To: | Ford B Entergy Nuclear Operations |
| Tapp J | |
| Shared Package | |
| ML18289A382 | List: |
| References | |
| Download: ML18289A383 (1) | |
Text
NRC FORM 311 (07-2015) 10 CFR 71 U.S. NUCLEAR REGULATORY COMMISSION QUALITY ASSURANCE PROGRAM APPROVAL FOR RADIOACTIVE MATERIAL PACKAGES
- 1. APPROVAL NUMBER 0963 REVISION NUMBER 0
Pursuant to the Atomic Energy Act of 1954, as amended, the Energy Reorganization Act of 1974, as amended, and Title 10, Code of Federal Regulations, Chapter 1, Part 71, and in reliance on statements and representations heretofore made in Item 4 by the organization named in Item 2, the Quality Assurance Program identified in Item 4 is hereby approved. This approval is issued to satisfy the requirements of Section 71.101 of 10 CFR Part 71. This approval is subject to all applicable rules, regulations, and orders of the Nuclear Regulatory Commission now or hereafter in effect and to any conditions specified below.
- 2. NAME Entergy Nuclear Operations, Inc. (Pilgrim)
STREET ADDRESS 1340 Echelon Parkway CITY STATE ZIP CODE
- 3. DOCKET NUMBER Jackson MS 39213 71-0963
- 4. QUALITY ASSURANCE PROGRAM APPLICATION DATE(S)
June 18, 2018
- 5. CONDITIONS
- 1. Activities conducted with regard to transportation packagings under applicable criteria of Appendix B to 10 CFR Part 50 authorized by this approval: procurement, maintenance, repair, and use. All other activities (i.e.,
design, fabrication, assembly, testing, and modification) shall be satisfied by obtaining certifications from packaging suppliers that these activities were conducted in accordance with an NRG-approved Quality Assurance Program. It shall remain the responsibility of the Quality Assurance Program holder that all transportation activities meet the requirements of 10 ClrR i71.101.
- 2. Records shall be maintained in accordance with the provisions of 1'() CFR Part 71. Specifically:
- a. Records of each shipment of liaensed material shall be maintaiD~d for 3 years after that shipment
[10 CFR 71.91 (a)].
..-,.. /
ha.
, ~
- b. Records providing evidence of packaging quality shall be maintained for 3 years after the life of the packaging [10 CFR 71.91 (d)].
~),t R
d d
.b.
t* *t*
ff..
~Ok'J:.
1*h-; h II b;#/__ t.
d f 3
ft th*
- c.
ecor s escn mg ac 1v1 1es a ec mg pac aging qua 1., s a e main ame or years a er 1s Quality Assurance Program Approval is termin-atet:l [10 CFR 71~ 135].
r, A/'
i?!: \\~'
- 3. Planned and periodic audits of all aspects of the Q_uv ityAssurance Program shall be conducted in accordance with written procedures or checklists, by appropriately trained personnel not having direct responsibility in the areas being audited, in accordance with 1 O CFR 71.137.
SIG RE PATR A SILVA, CHIEF INSPECTIONS AND OPERATIONS BRANCH DIVISION OF SPENT FUEL MANAGEMENT OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS NR F RM 311 (07-2015)