ML18285A614

From kanterella
Jump to navigation Jump to search
Revision 19 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
ML18285A614
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/19/2018
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18285A591 List:
References
Download: ML18285A614 (2)


Text

LGS UFSAR CHAPTER 17 - QUALITY ASSURANCE TABLE OF CONTENTS 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE APPENDIX 17.2B - Deleted.

APPENDIX 17.2.I - Deleted.

APPENDIX 17.2.II - Deleted.

CHAPTER 17 17-i REV. 13, SEPTEMBER 2006

LGS UFSAR CHAPTER 17 - QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to the LGS UFSAR.

17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE The licensee is responsible for the operation and maintenance of Limerick Generating Station (LGS). These activities are presently conducted in accordance with the NRC approved Quality Assurance Topical Report (QATR) which describes the formal and comprehensive control methods established to assure compliance with 10CFR50, Appendix B.

The QATR describes how the Quality Assurance Program is to be functionally implemented with due regard to the safety and health of the public and the personnel on site. The LGS Quality Assurance Program as described by the QATR is incorporated herein by reference.

CHAPTER 17 17.2-1 REV. 13, SEPTEMBER 2006