ML18284A196

From kanterella
Jump to navigation Jump to search
Rev. 50 to Updated Final Safety Analysis Report
ML18284A196
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/01/2018
From: Mark D. Sartain
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML18284A261 List:
References
18-291
Download: ML18284A196 (6)


Text

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 1, 2018 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Serial No.:

18-291 NCM/EMM:vlh Docket Nos.:

50-280/281 License Nos.: DPR-32/37 VIRGINIA ELECTRIC AND POWER COMPANY {DOMINION ENERGY VIRGINIA}

SURRY POWER STATION UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT REVISION 50 Pursuant to 10 CFR 50.71(e), Dominion Energy Virginia submits Revision 50 to the Updated Final Safety Analysis Report (UFSAR) for Surry Power Station.

Two CD-ROMs are attached to this submittal. Attachment 1 contains a CD-ROM labeled, "Surry Power Station Updated Final Safety Analysis Report, Revision 50, Docket Nos. 50-280/281, Security-Related Information -

Withhold Under 10 CFR 2.390," and contains the following files:

000 SPS UFSAR Frontmatter.pdf 001 SPS UFSAR Chapter 1.pdf 002 SPS UFSAR Chapter 2.pdf 003 SPS UFSAR Chapter 3.pdf 004 SPS UFSAR Chapter 4.pdf 005 SPS UFSAR Chapter 5.pdf 006 SPS UFSAR Chapter 6.pdf 007 SPS UFSAR Chapter 7.pdf 008 SPS UFSAR Chapter 8.pdf 009 SPS UFSAR Chapter 9.pdf 010 SPS UFSAR Chapter 10.pdf 011 SPS UFSAR Chapter 11.pdf 012 SPS UFSAR Chapter 12.pdf 013 SPS UFSAR Chapter 13.pdf 014 SPS UFSAR Chapter 14.pdf 015 SPS UFSAR Chapter 15.pdf 016 SPS UFSAR Chapter 16.pdf 017 SPS UFSAR Chapter 17.pdf 018 SPS UFSAR Chapter 18.pdf 1,550,336 bytes 598,016 bytes 5,511,168 bytes 3, 168,256 bytes 2,091,008 bytes.

2,418,688 bytes 1,914,880 bytes 2,123,776 bytes 3,065,856 bytes 7,512,064 bytes 3, 123,200 bytes 2,394,112 bytes 245,760 bytes 479,232 bytes 13,948,928 bytes 8,402,944 bytes 98,304 bytes 73,728 bytes 647,168 bytes contains Security-Related Information that Dominion Energy Virginia requests be withheld from public disclosure in accordance with 1 O CFR 2.390.

ATTACHMENT 1 TO THIS LETTER CONTAINS SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.

UPON SEPARATION FROM ATTACHMENT 1, TH.IS LETTER IS DECONTROLLED.

Serial No.: 18-291 Docket Nos.: 50-280/281 UFSAR Revision 50 Page 2 of 4 contains a CD-ROM labeled, "Surry Power Station Updated Final Safety Analysis Report, Revision 50 - Redacted, Docket Nos. 50-280/281," and contains the following files:

000 SPS UFSAR Frontmatter.pdf 001 SPS UFSAR Chapter 1.pdf 002 SPS UFSAR Chapter 2.pdf 003 SPS UFSAR Chapter 3.pdf 004 SPS UFSAR Chapter 4.pdf 005 SPS UFSAR Chapter 5.pdf 006 SPS UFSAR Chapter 6.pdf 007 SPS UFSAR Chapter 7.pdf 008 SPS UFSAR Chapter 8.pdf 009 SPS UFSAR Chapter 9.pdf 010 SPS UFSAR Chapter 1 O.pdf 011 SPS UFSAR Chapter 11.pdf 012 SPS UFSAR Chapter 12.pdf 013 SPS UFSAR Chapter 13.pdf 014 SPS UFSAR Chapter 14.pdf 015 SPS UFSAR Chapter 15.pdf 016 SPS UFSAR Chapter 16.pdf 017 SPS UFSAR Chapter 17.pdf 018 SPS UFSAR Chapter 18.pdf 1,550,336 bytes, publicly available.

598,016 bytes, publicly available.

5,511,168 bytes, publicly available.

3, 168,256 bytes, publicly available.

2,091,008 bytes, publicly available.

2,418,688 bytes, publicly available.

1,914,880 bytes, publicly available.

2,123,776 bytes, publicly available.

3,065,856 bytes, publicly available.

7,512,064 bytes, publicly available.

3,123,200 bytes, publicly available.

2,394,112 bytes, publicly available.

245,760 bytes, publicly available.

479,232 bytes, publicly available.

13,948,928 bytes, publicly available.

8,282, 112 bytes, publicly available.

98,304 bytes, publicly available.

73,728 bytes, publicly available.

647,168 bytes, publicly available.

Third-party documents included by reference in the Surry UFSAR and contained in these files may not be text searchable.

Serial No.: 18-291 Docket Nos.: 50-280/281 UFSAR Revision 50 Page 3 of 4 Should you have any questions regarding this submittal, please contact Mr. Gary Miller at (804) 273-2771.

Sincerely, Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Commitments made in this letter: None.

Attachments

1. CD-ROM labeled, "Surry Power Station Updated Final Safety Analysis Report, Revision 50, Docket Nos. 50-280/281, Security-Related Information-Withhold Under 10 CFR 2.390"
2. CD-ROM labeled, "Surry Power Station Updated Final Safety Analysis Report, Revision 50 - Redacted, Docket Nos. 50-280/281" COMMONWEAL TH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain, who is Vice President - Nuclear Engineering and Fleet Support, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the ~9-;t of his kno~dge and belief.

Acknowledged before me this

/

-=

day of u_e,fz>l,c r

, 2018.

My Commission Expires:,&y 3/1 ;)/J;/,;J.

~I!£<*~~

Notary Public VICKILHULL NOTARY PUBLIC REG. # 1405'2 COMMONWEALTH OF VIRGINIA *

. MY COMMISSlON EXPIRES 1131/2022

cc:

(w/Atts. 1 & 2)

U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257 Ms. K. R. Cotton Gross NRG Project Manager One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Ms. Yen-Ju Chen NRG Senior Project Manager U. S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop 4834 Rockville, MD 20852-2738 NRC Senior Resident Inspector Surry Power Station Serial No.: 18-291 Docket Nos.: 50-280/281 UFSAR Revision 50 Page 4 of 4

ATTACHMENT 2 CD-ROM labeled, Serial No.: 18-291 Docket NQs.: 50-280/281 UFSAR Revision 50 "Surry Power Station Updated Final Safety Analysis Report, Revision 50 - Redacted, Docket Nos. 50-280/281" Virginia Electric and Power Company (Dominion Energy Virginia)

Surry Power Station Units 1 and 2

ATTACHMENT 1 CD-ROM labeled, "Surry Power Station Updated Final Safety Analysis Report, Revision 50, Docket Nos. 50-280/281, Security-Related Information - Withhold Under 10 CFR 2.390" Virginia Electric and Power Company (Dominion Energy Virginia)

Surry Power Station Units 1 and 2 Serial No.: 18-291 Docket Nos.: 50-280/281 UFSAR Revision 50 ATTACHMENT 1 TO THIS LETTER CONTAINS SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.

UPON SEPARATION FROM ATTACHMENT 1, THIS PAGE IS DECONTROLLED.