ML18283B932
From kanterella
Jump to navigation
Jump to search
ML18283B932 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 03/05/1975 |
From: | Tennessee Valley Authority |
To: | Office of Nuclear Reactor Regulation |
References | |
BB-207 | |
Download: ML18283B932 (1) | |
Similar Documents at Browns Ferry | |
---|---|
Category:Graphics incl Charts and Tables
MONTHYEARML21286A5422021-10-0404 October 2021
[Table view]Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.5, Analyses of Abnormal Operational Transients ML21286A3972021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.12, Process Radiation Monitoring Systems Characteristics ML21286A3422021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.9, Reactor Water Cleanup System Equipment Design Data ML21286A3592021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Table 6.4, (Deleted by Amendment 13) ML21286A3762021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.1, Systems (or Portions of Systems) Required to Mitigate LOCA And/Or HELB ML21286A3732021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.2, Reactor Protection System Instrumentation Specifications ML21286A3682021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.3, Primary Containment Isolation ML21286A3892021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.7, Reactor Manual Control System Instrumentation ML21286A3952021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.6, Refueling Interlocks Effectiveness ML21286A5662021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.13-1, Results of BFN Atwsi Evaluation ML21286A5522021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.5, Analyses of Abnormal Operational Transients ML21286A5502021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.4, Approach to Safety Analysis ML21286A5482021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.6, Iodine-131 Activity (Ci) by Location as Function of Time for CRDA ML21286A5432021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Table 13.5, Startup and Power Test Program ML21286A4042021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.13, Area Radiation Monitoring ML21286A5322021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.6, Analysis of Design Basis Accidents ML21286A5282021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.4, Approach to Safety Analysis ML21286A5162021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Table 10.17, Process Sampling Systems ML21286A4942021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Table 10.11, Power Block Structures ML21286A4602021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Table 10.4, Tools and Servicing Equipment ML21286A4572021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 12, Table 12.2, Reactor Building Concrete Structure Base Slab Design Data ML21286A4522021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 12, Table 12.3, Plant Radiation Zone Classification ML21286A4272021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Table 8.4, Normal Auxiliary Power ML21286A4242021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Table 8.6, 250-V DC Power Supply ML21286A4232021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.20, Design Output Documents ML21286A4142021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Table 8.5, Standby AC Power Supply ML21286A4092021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.16, Process Computer System ML21286A2772021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table 2.3, Meteorology ML21286A2232021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix G, State B ML21286A2222021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix G - BWR Operating States ML21286A2262021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix G, State D ML21286A2272021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix G, State a ML21286A2622021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Table 1.11, Id Resolution of Construction Permit Concern - Summary ML21286A2522021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Table 1.4-1, Class of BWR Systems Criteria Requirements for Safety Evaluation ML21286A2662021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table 2.5, Sheets 1-3, Historical Earthquake Listing 200 Mile Radius Around 87.11 W Lon 34/71 N Lat ML21286A3172021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.3, Reactor Recirculation System ML21286A2002021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix a, AEC General Design Criteria - Group 1 (Overall Plant Requirements) ML21286A2722021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Table 1.7, Comparison of Nuclear System Design Characteristics ML21286A3482021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Table 6.5, Plant Parameters Used Locaa Analysis ML21286A3542021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Table 6.3, Emergency Core Cooling Systems Equipment Design Data Summary ML21286A3672021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.5, Neutron Monitoring System, SRM Trips ML21286A3962021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.8, Reactor Vessel Instrumentation ML21286A3122021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Table 3.2-1, Deleted by Amendment No. 16 ML21286A3132021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Table 3.3, Reactor Vessel Internals, Mechanical Design Data ML21286A2962021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.2, Reactor Pressure Vessel Materials ML21286A2822021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table 2.4A, Maximum Possible Flood ML21286A2842021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table, 2.4, Deleted ML21286A3112021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.4, Nuclear Steam Pressure Relief System ML21286A3242021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Table 3.6, Definition of Fuel Design Limits ML21286A3432021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.8, Residual Heat Removal System Equipment Design Data 2021-10-04 |
Text
PLATE B 75 70 65 IF)
ILI UI LO IFI UI 60 UJ
~ I-EU z
I-
<<t K K
EL 0 55 I- UI z
CO I-OE 50
<<E E3 K
D O
X 45 40 35 2 3 4 5 6 7 8 9 Io 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 WHEELER RESERVOIR TEMPERATURES, STATION 4S: I WATER TEMPERATURE SURVEY FEBRUARY, 1971 WHEELER RESERVOIR TEMPERATURE MILE 293. 55 FEBUARY 1971 BROWNS FERRY NUCLEAR PLANT TENNESSEE VALLEY AUTHORITY OIVISION OF ITATCR CONTROL PLANNING ENON<<LN<<5 I.AOOIIAIOII'I,OOIII<<5 NORRIS 3-5-75 57 EL 92 BB 207
Retrieved from "https://kanterella.com/w/index.php?title=ML18283B932&oldid=1921059"