ML18283B094
| ML18283B094 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 05/13/1975 |
| From: | Gilleland J Tennessee Valley Authority |
| To: | Rusche B Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18283B094 (6) | |
Text
NRC
.oTRIBUTIOih FOR PAR i 50 DOCK MATERIAL (TEMiPORARY FORMi)
CONTROL NO:
F I LE'ROM:
Tennessee Valley Auth Chattanooga, Tn 1
DATE OF DOC 5-13-75 DATE R EC'D 5-14-75 LTR XXX TWX RPT OTHER TO:
CLASS Mr Rusche'NC LASS XXXXXX PROP INFQ ORIG c otic signed INPUT CC OTHER NO CYS REC'D 1
SENT AEC PDR SENT I OCAL PDR DOCKET NO:
50-25 DESCRIPTION:
Ltr trans the following:
ENCLOSURES:
Revision 83 to report: entitled:
"Plan for Evaluation Pepair
& Peturn to Service of B"'om.s Ferry 1 6 2"...zsith regard to t:he 3-2?-75 fire PLANT NAME:
Brogans Ferry 1
6 2
(40.cys encl rec ')
~
FOR ACTION/INFORMATION 5-15-75 ehf BUTLER (L)
W/ Copies CLARK (L)
W/ Copies I'/L) VH {t.i W/ Copies KNIE L'fL)
W/ Copies SCHWENCER (L)
Z)EMANN)L)
REGAN()))p Npsss XtEMOVE STOLZ (L)
DICKER (E)
LEAR (L) f:
W/ Copies W/ Copies W/ Cooies ACKNP V/1<~/), I I A (i )
)>>fair:u'vrs;,<<L.,
r-'Kn W/ Copies W/ Copies W/ Copies PURPLE (L)
YOUNGBLOOD (E)
LICE>iSING PROJECT MANAGER W/IsCopies W/ Copies W/ Copies INTERNALDISTRIBUTION
~~~GAL
'OSSICK/STAFF CASE G IAM80SSO BOYD MOORE"',(L)
DEYOUIIG (L)
SKQVHOLT (L)
GOLLE R
{L) (Ltr)
P. COLLINS D EN ISEII REG OPGR
~1=
~@REGION t,8)
STEE LE:
TECH R EV I EW SCHROEDER MACCARY KNIGHT
~- nAWLICKI SHAO
~ STELLO HOUSTON NOVAK ROSS
~ IPPOLITO Cz)
TEDESCO J.
COLLINS LAINAS
~BENAROYA VOLLPlER
/ one DENTON G R IMES GAMMILL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KNIGHTON YOUNGBLOOD BEGAN PROJECT LDR HAR LESS LIC ASST R. DIGGS (L)
H. GEARIN (L)
E. GQULBOURiNE (L)
P. KREUTZER (E)
J. LEE (L)
M. MAIGRET (L)
S. REED (F)
M. SERVICE (L)
~S. SHEPPARD (L)
M. SLATER (E)
H. Si>IITH (L)
S. TEETS (L)
G. WILLIAMS(E)
V. WILSON (L)
R. INGRAM (L)
A/T IND.
8 RAITi')/IAi~i SA LTZI)/lAi" ME LTZ PLANS MCDONALD CHAPMAN DUBE (Ltr)
E. COUPE PETERSON I.IARTFIELO (2)
KLECKER EISENHUT
'lg(iliUTOP~ ~ )
y g -,~g>~aS EXTERNALDISTRIBUTION
~1 LOCAL PDR A~~>
I ~1 TIC (ABER NATHY)
(1)(2)(10) NATIOi~IALLABS
'1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rrn E.201 GT 1 ASLB 1
CONSULTANlS
. '. I...1 Newton Anderson NEWiMARK/8 LUi41E/AG8ABI AN ACRS HOLDING),i&AH s
s
~
1 P D R-SAl(l/LA/NY CK~/
1 BROOKHAVEN 1'IAT LAB 1 G. ULRIKSON, OR)NL 1 AGME D (RUTH 6USS; 1AN}
R m 8-127 GT 1 J. D. RUNKLES, Rrn E.201 G'r
CI
> ~
ROTI Qy
(~~,
m 5.
>>(.
'~~s-~e<~
TENNESSEE VALLEYAUTH')HlTY "I
CHATTANOOGA. TENNESSEE 37401 831 Power Building REGULATORYDOCKET FILE~COPY Mr. Benard C. Rusche, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 IIttA'(g,g)gyp.
'+ 8'~Feei.",e"
~r.
~ r
//'>>>>
Dear Hr. Rusche:
In the Matter of Tennessee Valley Authority
)
Docket Nos. 50-259
)
50-260 Enclosed are 40 copies of the third revision to a document previously submitted on April 13, 1975, entitled "Plan for Evaluation, Repair, and Return to Service of Browns Perry Units 1 and 2 (March 22, 1975, Pire)."
The revision consists of the following:
Material Revised Evaluation Plan Section P'rOgratit For Sampling, An"'ysi",
and Cleanup of Residue on Affected Structures,
- Systems, and Components Q'~
(}
2.
Program for Primary Containment Evaluation of Units 1 and 2
IX.A 3.
Critical Path Schedule for Accomplishing the Overall Plan XIV.A We are in the process of reevaluating our overall restoration and submittal schedule.
The following changes to dates indicated previously appear to be necessary at this time.
Change the respective schedule dates listed in the enclosure to my letter to you dated April 22, 1975, to:
I Item New Scheduled Submittal Date 1.
Program for Sampling, Analysis, and Cleanup of Residue on Affected Structures,
- Systems, and Components (Preliminary Report)
Hay 22, 1975 An Equal Opportunity Empioyer
ty.
"i
'e
Hr. Benard C. Rusche 2.
Program for'rimary Containment Evaluation of~Units 1 and 2.
(Final Report)
June 2, 1975 3.
Studies of Modifications and/or Design Changes Resulting from Evaluation of Fire (Design Criteria) 4.
Evaluation of Fire Fighting Practices (Final Report)
May 22, 1975 May 22, 1975 5.
Program for identification of June 2, 1975 Affected Electrical Equipment other than Cables (Preliminary Report)
Item Change the respective schedule dates listed in Part XIV, 'Section C, to the "Plan for Evaluation, Repair, and Return to Service of Browns Ferry Units 1 and 2 (March 22, 1975, Fire)," to read as follows:
New Schedule Date Unit Lo 5I 23/ I3 i~aC approval of SAR Zuc."
cable removal.
A Cc C
2.
5/23/75 Commence cable, cable tray, 1
& 2 and conduit removal 3.
Undetermined Submit design changes for NRC approval 1
& 2 Add a new item:
4.
5/22/75 Submit design criteria for NRC approval 1 &2 Very truly yours, J.
E. Gilleland Assistant Manager of Power Enclosures
0 v