|
---|
Category:Letter
MONTHYEARIR 05000259/20240032024-11-0404 November 2024 Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 CNL-24-043, Application for Subsequent Renewed Operating Licenses, Second Safety Supplement2024-11-0101 November 2024 Application for Subsequent Renewed Operating Licenses, Second Safety Supplement ML24305A1692024-10-31031 October 2024 Site Emergency Plan Implementing Procedure Revision 05000259/LER-2024-003, Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators2024-10-29029 October 2024 Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators 05000259/LER-2024-001-02, Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure2024-10-28028 October 2024 Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure ML24299A2632024-10-25025 October 2024 Response to Apparent Violation in NRC Inspection Report 05000260/2024090, EA-24-075 ML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24308A0042024-10-16016 October 2024 Ahc 24-1578 Environmental Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 Subsequent License Renewal Application Limestone County CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) 05000296/LER-2024-003, Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints2024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints 05000259/LER-2024-001-01, Inoperability of Unit 3 Diesel Generator Due to Relay Failure2024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) 05000259/LER-2024-002, Reactor Scram Due to Generator Step-Up Transformer Failure2024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 05000260/LER-2024-002, High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation2024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information ML24122A6852024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual 2024-09-03
[Table view] Category:Report
MONTHYEARML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information ML23025A0752023-01-25025 January 2023 American Society of Mechanical Engineers, Section XI, Third 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle . ML22363A3922022-12-28028 December 2022 Cycle 14 Mellla+ Eigenvalue Tracking Data CNL-22-090, Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval2022-12-12012 December 2022 Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval CNL-22-100, To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)2022-12-0909 December 2022 To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535) CNL-22-066, Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information2022-07-18018 July 2022 Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information ML22154A4042022-06-0303 June 2022 Unit 3 Cycle 20 Mellla+ Eigenvalue Tracking Data CNL-22-057, To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use2022-05-27027 May 2022 To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use ML21277A1232021-10-0404 October 2021 Submittal of Browns Ferry Unit 2 Reactor Pressure Vessel Vertical Weld Flaw Evaluation ML21246A2952021-09-29029 September 2021 Memo to File ML21246A2942021-09-29029 September 2021 Enclosufinal Ea/Fonsi for TVAs Initial and Updated Triennial Decommissioning Funding Plans for Browns Ferry Nuclear Plant ISFSIs CNL-20-102, 10 CFR 71.95 Report for 3-60B Casks User2020-12-16016 December 2020 10 CFR 71.95 Report for 3-60B Casks User ML20255A0002020-09-24024 September 2020 Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic ML20112F4852020-05-0606 May 2020 Staff Assessment of Flooding Focused Evaluation CNL-19-074, Extended Power Uprate - Flow Induced Vibration Summary Report2019-09-0404 September 2019 Extended Power Uprate - Flow Induced Vibration Summary Report CNL-19-004, Tennessee Valley Authority, Browns Ferry Nuclear Plant, Unit 2, Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2019-06-0707 June 2019 Tennessee Valley Authority, Browns Ferry Nuclear Plant, Unit 2, Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions CNL-19-041, Extended Power Uprate - Unit 1 Flow Induced Vibration Summary Report2019-04-16016 April 2019 Extended Power Uprate - Unit 1 Flow Induced Vibration Summary Report CNL-19-032, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 8, Additional Operator Training Information2019-03-13013 March 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 8, Additional Operator Training Information CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report2018-11-29029 November 2018 Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report ML18283B5472018-10-10010 October 2018 Responding to Letter of 11/18/1977 from E. G. Case to G. Williams, Providing Environmental Qualification Information for Electrical Connectors in Reference of IE Bulletins 77-05 & 77-05A CNL-18-112, Extended Power Uprate - Flow Induced Vibration Summary Report2018-09-13013 September 2018 Extended Power Uprate - Flow Induced Vibration Summary Report CNL-18-060, Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2018-05-31031 May 2018 Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML18079B1402018-02-23023 February 2018 Browns Ferry Nuclear Plant, Units 1, 2, and 3: Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus ML17222A3282017-09-0505 September 2017 Flood Hazard Mitigation Strategies Assessment ML17170A0732017-06-15015 June 2017 Report Pursuant to 10 CFR 71.95 (a)(3) and (B) - Failure to Follow Conditions of TN-RAM Packaging Certificate of Compliance No. 9233 ML17114A3712017-04-20020 April 2017 Errata for BWRVIP-271NP: BWR Vessel and Internals Project, Testing and Evaluation of the Browns Ferry, Unit 2, 120 Degree Capsule ML17033B1642017-02-0202 February 2017 American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement - Cycle 11 Operation Programs ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 CNL-16-169, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision2016-10-28028 October 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision ML16196A0882016-08-0505 August 2016 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism Reevaluation ML16146A0182016-05-25025 May 2016 Special Report 296/2016-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML16028A2952016-01-29029 January 2016 10 CFR 71.95 Notification Associated with the Failure to Observe Certificate of Compliance Condition of the 8-120B Secondary Lid Test Port Configuration ML16027A0592016-01-27027 January 2016 Snubbers Added to Lnservice Testing Program ML15356A6542015-12-22022 December 2015 Submittal of 10 CFR 50.46 30-Day Report CNL-15-056, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506)2015-09-25025 September 2015 Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506) NL-15-169, Browns Ferry, Units 1, 2, and 3, Startup Test Plan2015-09-21021 September 2015 Browns Ferry, Units 1, 2, and 3, Startup Test Plan NL-15-169, Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 72015-09-21021 September 2015 Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7 NL-15-169, Browns Ferry Units 1, 2 and 3, Flow Induced Vibration Analysis and Monitoring Program2015-09-21021 September 2015 Browns Ferry Units 1, 2 and 3, Flow Induced Vibration Analysis and Monitoring Program ML15282A1812015-09-21021 September 2015 Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7 ML15282A2402015-09-21021 September 2015 Startup Test Plan ML15282A2392015-09-21021 September 2015 Flow Induced Vibration Analysis and Monitoring Program ML15254A5432015-09-11011 September 2015 Submittal of 10 CFR 72.48 Changes, Tests, and Experiments, Biennial Summary Report Associated with the Independent Spent Fuel Storage Installation NL-15-169, ANP-3378NP, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for Atrium 10XM Fuel (Epu).2015-08-31031 August 2015 ANP-3378NP, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for Atrium 10XM Fuel (Epu). ML15282A2362015-08-31031 August 2015 NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis. ML15282A1822015-08-31031 August 2015 ANP-3403NP, Revision 2, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3, Attachment 9 NL-15-169, ANP-3377NP, Browns Ferry Units 1, 2 and 3 LOCA Break Spectrum Analysis Atrium 10XM Fuel (Epu).2015-08-31031 August 2015 ANP-3377NP, Browns Ferry Units 1, 2 and 3 LOCA Break Spectrum Analysis Atrium 10XM Fuel (Epu). NL-15-169, NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis.2015-08-31031 August 2015 NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis. ML15282A1842015-08-31031 August 2015 ANP-3377NP, Browns Ferry Units 1, 2 and 3 LOCA Break Spectrum Analysis Atrium 10XM Fuel (Epu). 2024-06-26
[Table view] Category:Technical
MONTHYEARML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information ML22363A3922022-12-28028 December 2022 Cycle 14 Mellla+ Eigenvalue Tracking Data CNL-22-100, To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)2022-12-0909 December 2022 To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535) CNL-22-066, Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information2022-07-18018 July 2022 Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information ML22154A4042022-06-0303 June 2022 Unit 3 Cycle 20 Mellla+ Eigenvalue Tracking Data CNL-22-057, To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use2022-05-27027 May 2022 To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use ML21277A1232021-10-0404 October 2021 Submittal of Browns Ferry Unit 2 Reactor Pressure Vessel Vertical Weld Flaw Evaluation CNL-20-102, 10 CFR 71.95 Report for 3-60B Casks User2020-12-16016 December 2020 10 CFR 71.95 Report for 3-60B Casks User ML20255A0002020-09-24024 September 2020 Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic ML20112F4852020-05-0606 May 2020 Staff Assessment of Flooding Focused Evaluation CNL-19-074, Extended Power Uprate - Flow Induced Vibration Summary Report2019-09-0404 September 2019 Extended Power Uprate - Flow Induced Vibration Summary Report CNL-19-004, Tennessee Valley Authority, Browns Ferry Nuclear Plant, Unit 2, Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2019-06-0707 June 2019 Tennessee Valley Authority, Browns Ferry Nuclear Plant, Unit 2, Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions CNL-19-041, Extended Power Uprate - Unit 1 Flow Induced Vibration Summary Report2019-04-16016 April 2019 Extended Power Uprate - Unit 1 Flow Induced Vibration Summary Report CNL-19-032, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 8, Additional Operator Training Information2019-03-13013 March 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 8, Additional Operator Training Information CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report2018-11-29029 November 2018 Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report ML18283B5472018-10-10010 October 2018 Responding to Letter of 11/18/1977 from E. G. Case to G. Williams, Providing Environmental Qualification Information for Electrical Connectors in Reference of IE Bulletins 77-05 & 77-05A CNL-18-112, Extended Power Uprate - Flow Induced Vibration Summary Report2018-09-13013 September 2018 Extended Power Uprate - Flow Induced Vibration Summary Report ML18079B1402018-02-23023 February 2018 Browns Ferry Nuclear Plant, Units 1, 2, and 3: Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus ML17222A3282017-09-0505 September 2017 Flood Hazard Mitigation Strategies Assessment ML17114A3712017-04-20020 April 2017 Errata for BWRVIP-271NP: BWR Vessel and Internals Project, Testing and Evaluation of the Browns Ferry, Unit 2, 120 Degree Capsule CNL-16-169, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision2016-10-28028 October 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision ML16196A0882016-08-0505 August 2016 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism Reevaluation ML16027A0592016-01-27027 January 2016 Snubbers Added to Lnservice Testing Program CNL-15-056, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506)2015-09-25025 September 2015 Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506) NL-15-169, Browns Ferry Units 1, 2 and 3, Flow Induced Vibration Analysis and Monitoring Program2015-09-21021 September 2015 Browns Ferry Units 1, 2 and 3, Flow Induced Vibration Analysis and Monitoring Program ML15282A1812015-09-21021 September 2015 Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7 NL-15-169, Browns Ferry, Units 1, 2, and 3, Startup Test Plan2015-09-21021 September 2015 Browns Ferry, Units 1, 2, and 3, Startup Test Plan ML15282A2402015-09-21021 September 2015 Startup Test Plan NL-15-169, Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 72015-09-21021 September 2015 Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7 ML15282A2392015-09-21021 September 2015 Flow Induced Vibration Analysis and Monitoring Program NL-15-169, ANP-3377NP, Browns Ferry Units 1, 2 and 3 LOCA Break Spectrum Analysis Atrium 10XM Fuel (Epu).2015-08-31031 August 2015 ANP-3377NP, Browns Ferry Units 1, 2 and 3 LOCA Break Spectrum Analysis Atrium 10XM Fuel (Epu). NL-15-169, ANP-3378NP, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for Atrium 10XM Fuel (Epu).2015-08-31031 August 2015 ANP-3378NP, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for Atrium 10XM Fuel (Epu). NL-15-169, ANP-3403NP, Revision 2, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3, Attachment 92015-08-31031 August 2015 ANP-3403NP, Revision 2, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3, Attachment 9 ML15282A1822015-08-31031 August 2015 ANP-3403NP, Revision 2, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3, Attachment 9 ML15282A2362015-08-31031 August 2015 NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis. ML15282A1842015-08-31031 August 2015 ANP-3377NP, Browns Ferry Units 1, 2 and 3 LOCA Break Spectrum Analysis Atrium 10XM Fuel (Epu). ML15282A1852015-08-31031 August 2015 ANP-3378NP, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for Atrium 10XM Fuel (Epu). NL-15-169, NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis.2015-08-31031 August 2015 NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis. CNL-15-143, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report2015-07-31031 July 2015 the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report CNL-15-085, Response to NRC Request for Additional Information Regarding Proposed Technical Specification Change to Modify Technical Proposed Technical Specification Change to Modify Technical2015-06-0303 June 2015 Response to NRC Request for Additional Information Regarding Proposed Technical Specification Change to Modify Technical Proposed Technical Specification Change to Modify Technical CNL-14-208, Response to NRC Request for Additional Information Regarding the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Pl2014-12-17017 December 2014 Response to NRC Request for Additional Information Regarding the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plan CNL-14-089, (Bfn), Units 1, 2, and 3 - Application to Modify Technical Specification 2.1.1, Reactor Core Safety Limits (BFN-TS-492)2014-12-11011 December 2014 (Bfn), Units 1, 2, and 3 - Application to Modify Technical Specification 2.1.1, Reactor Core Safety Limits (BFN-TS-492) ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 CNL-14-038, Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acc2014-03-31031 March 2014 Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid ML14077A0952014-01-30030 January 2014 BWROG-TP-14-001, Rev. 0, Containment Accident Pressure Committee (344) Task 1 - Cfd Report and Combined Npshr Uncertainty for Browns Ferry/ Peach Bottom Cvic RHR Pumps, Attachment 8 ML14077A0902013-12-31031 December 2013 BWROG-TP-13-021, Rev. 0, Containment Accident Pressure Committee (344) Task 4 - Operation in Maximum Erosion Rate Zone (Cvic Pump), Attachment 11 ML13225A5412013-12-19019 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML13338A6342013-12-18018 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Browns Ferry Nuclear Plant, Units 1, 2, and 3, TAC Nos.: MF0902, MF0903, and MF0904 ML13276A0642013-09-30030 September 2013 ANP-3248NP, Revision 1, Areva RAI Responses for Browns Ferry Atrium 10XM Fuel Transition, Enclosure 3 2024-06-26
[Table view] |
Text
N )ISTRIBUTION FOR PART 50 DOC~T I'MATERIAL (TEI'/if'OVARY FORiM)
CONTROL NO: 4184 FILE. Enviro FROM. Tennessee Valley Authorit DATE OF DOC DATE B EC'D LTR TWX OTHER Chatitanooga, Tenn J.E. Gi llcland 4-15-75 4-17-75 XXX TO:
Mr. Daniel R. Huller'RIG 1-signed CC OTHER SENT AEC PDR SENT LOCAL PDR xxx CLASS UNCLASS PROPINFO INPUT " MO CYS REC'D DOCKET NO:
XXXXX 5 50-259 an 260 DESCRIPTION: ENCLOSURES:
Ltr t:rans the following: Monthly fish impingement report for March 1975 for the. Browns Ferry Nuclear Plant units 1 and 2 .. ..
~
~u >.aux ~>,~z>iglig Browns F Ferry 1 andd 2 FOR ACTION/INFORillA1IOM 5 JG8 BUTLER (I ) SCHWENCER (L) ZIEii'!ANM(L) BEGAN (E) hV/ Copies W/ Copies lV/ Copies Wl Copies CLARK (I.) STOLZ (I.) WICKER (E) LEAR (L)
W/ Copies W/ Copies '.V!copies W/ Copies,
'>>'>'>~S>ii
>V > I
>'>'>>'iM \
~ ~
'>>>>>" Le >'>g>.> la >
~ ~ c>l>i>
V t0
~ V W/ Copies V/ Copies lV/ Copies W/ Copies KMIEL (L) PUBf'LE (L) YOUNGBLOOD (E) LPH W/ Copies . W/ Copies W/ Copies W/ Copies INTERNAL DISTR I BUTIO>'J lECH BEVIE'VJ HEI'!TON LIC ASST A/T IMD ~
PiC PDB SCIifIOEDEB GfifiYiES R. DIGGS (L) B B A I 7 is'1 A>'!
OGC, BOO>Vi P 506A iViACCABY GA!vl"y'I I L L I-I. GEAR IN (L) SA LTZKiAih GOSS I CK/STAF F KNIG HT ~AS1 NER F GOULBOUfhME (L) ViE LTZ CASE PAWL I CKI aFAI.LARD ~KBEUTZLB (E) ~++
P LAL!S Gl AMBUSSO SHAG SPANGLER J..LEE (L)
BOYD STELLO M. V,A!GRET (L) bfiCDOihiALD ViOOfiE (L) HOUSTON E NVI BO S. REED (F-) CI-I AP foal AN DEYOUNG (I.) NOVAK ViULLEB DUBE (Ltr)
SKOVI<OI T (L)
GOLLEB (L) (Ltr)
BOSS IPPOL ITO DICKER KM I G HTOiM fvl SEBVICF (L)
MS. SHEPPARD (L) ~~ E. COUi'E PETE BSOi'I i'll. SLATER (E)
P. COLI IMS
~
T DFSCO YOUMGBLOOD H. SiVi!TI-I (L) HAreTI-!ELD (2)
DEMISF J . COLLINS i PGAM S. TEETS (L) KLECKFB if='G OPR LAINiAS 'ROJECT LDR G. WILLIAMS(E) EISEiNHUT AgP fi pi g II PygTEG lot'> (21 BEMAfiOYA VOI LA'iER HAB LESS cA V. WILSOiM (L)
R. INGHAM (L)
WI GG IMTON Sl EELE EXTERNAL DISTR I BU I'ION
~-
~-
LOCAL PDR Athens, ~1 TIC (ABEf'4'AT!IY) ~, i.-;,; 0) NATIONALLABS NSIC (BUCHANAN) W. PEMMI~:QTO>J, Bm E 201 GT PD B.SAI".!LA/NY BROOKI<AVEN .'AT l AB G. ULfklKSO>M, O'! L 1 1 1 ASLB 1 COliISU LTANTS 1 1 Ne'v ton Ant!erso>> NF WiViABK/B I UiViE/AG BA BI AN 1 AGfvlED (RUTH GUS-":;IAM)
ACflS HOI.DING/SLiJT ' Bm B- l27 GT 1 J. D. BUNKI ES, Bm E.201
.GT
V'EMMERKEE V'A,LLE&&uTl-tC3RITY C:i+A~A.MC3C3CxA,~ TEMMERREE t ]
~ t *
/ ~"
April 15,,1975~- ~
r
/ .~ 'a ANNIVERSARY OF PEOPLE IN PARTNERSHIP Mr. Daniel R. hfuller Assistant Director for Mvironmental Pro)ects U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear hh. Muller:
The purpose of this letter is to file the monthly fish impingement report for March 1975 for the Browns Ferry Nuclear Plant units 1 and 2 (Facility Operating Licenses DPR-33 and DPR-52) as reauired by the environmental technical specifications. The weekly counts were conducted and the appropriate weighting factors applied for March 1975.. The data sheets with calculated fish impingement estimates are. enclosed.
As stated in the February 1975 report, the impingement in screen well 1A" was checked "Oy actual coo>I(; i.he equi iIIaI'iIIg procedure outlined in the Browns Ferry Nuclear Plant environmental technical specifications is still applicable. In view of the above, we intend to resume estimating the 12 screens based on a test screen and applying the weighting factors as prescribed. By following this procedure, the fish pump test facility becomes more flexible in scheduling additional tests without disrupting counts required by the environmental technical specifications, and the plant operators will have more freedom to control screen activity during periods of high trash accumulations, The Browns Ferry fish pump test facility was started on March 9, 1975. Although considerable data has been collected and is now APiR f! f 1975
~'t rtr&iaa
~P ~
0 Mr. Daniel'R. Muller April 15, 1975 being analyzed, the pump test program has been modified to meet existing operational problems with the fish pump .and the plant.
As more data is accumulated, a progress report will be issued.
Very truly you J. Z. Gilleland Assistant Manager of Power Enclosures CC (Enclosures):
Mr. Gerald R. Hooper District Fisheries Section Alabama Game and Fish Commission Department of Conservation and Natural Resources P.O. Box '366 Decatur, Alabama 35601 Mr. Sam L. Spencer, Chief Fisheries Section Alabama Game and Fish Commission D'epartment of Conservation and Natural Resources 624 North Union Street-Montgomery, Alabama 36104
0 I L
i,
gTet Paris<1 Pron: .. Tine 9:30 a.m. Date 3/03/73 To Time 9:30'a.m. 'ata 3/04/73 Test Sarsen 2hh. '
'I A D ~
r Current Factor " Factor if One 'actor for Partial Estimate of Number Counted for Test or More Pumps Pump Operation Fish Impinged
~Sanies on Test Screen Screen ~ Out'for'24 Hrs.. :'Durin 24 Hr. Pd. Burin 24 Hr. Pd.
Shad and Herring 12,210 14. 60 0.176 146 891
~ 0 ~
~
'atfish 14.60 0.176 48
, Bass
<, .Largemouth 0 14.60 0.176 ~ r 0
~
Smallmouth 0 -'
14.
.'potted 14.60 . 0.176 r
~ ~
Crappie 14.60 ~ ~
0.176 2
~ 9 Sunfish e 0 14. 60 0.176 0 Drum 14. 60 0.176 156' Other .
14;60 0.176 -'48 Total 12,232 147 155 Factors Screen
~ ~
6.81 2AA 14.60 ~ Pump .Activity During Test Period lAB 7.63 2AB 17.14 1A lBA 8.79 2BA 20.-lS .
lBB 9.06 2BB 17,34 1CA 10-28 2CA 19.43 1CB ll.58 2CB 34.77. OFF 23.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> Factors out: for 24 Hours Pump Pumps
'.1A ~ 0.72 'A ns 0. 87 2A 1B ~ 0.78 2B ~ 0. 89 1C ~ 0.82 2C ~ 0. 92 D ~~p, Factors Pumps out for X 1A ts 0.28 1B ~ 0.22 Hours""
x x x 2A ~ 0.13
> 2B ~0]1 x~
x x 2C To compute: 1. All pumps for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ~ A x B ~ E
. 24.
OZ8x 24x 2C ~ 0.08' ~ .-
. 2. One pump out for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ~ A x B x C ~
~
~ ~
~
24 One pump out: for g hours Ax B - Z'3.
(D x A ~
~
~ ~
tn
~ ~
II il N
P' 4 ~ t+I 1tt
Test Per>od I'rom: Time 9:30 a.m. Date 3/04/75'o Time 9:30 a.m. Date 37705 75 Test Settee ~2 A C Current Factor Factor if One Factor for Partial Estimate oG Number Counted , for Test or More Pumps Pump Operation Fish Tmpinged
.~Seeiae on Test Screen Screen ..'Out'for'4 Hrs. :'Durin 24 Hr. Pd. Durin 24 Hr. Pd.
Shad and Herring 2; 704 14. 60 .82 32 372
~ ~
j' Catfish 14.60 .82 24 Bass
~
'Largemouth 0 14.60 .82 0 ~ ~
~ ~
~~
S=allmouth 0 14.60 .82
~
Spotted I 0 14.60 .82
~
e Crappie
~ ~ ~
14.60 .'82 0' OI 14.70 .82 ~ ~
Suncish ~
~
~
D"um 12 14.60 .82 144
~
Other 14.'60 .82 s
'96 Total 2,726 32,636 3 Factors Screen lAA, 6.81 'AA 14.60 .Pump'.Activity During Test Period lAB 7.63 2AB 17.14 1BA 8.79 2BA 20.15 1'BB 9. 06 233 17.34 3.3 1CA 10.28 2CA 19.43 1CB 11.58 2CB 34.77 OFF 24 hours C Factors >> Pumps out for 24 Hours Pump 1A~ 072 '2A~ O. 87 PA l 'A sm 0,78 23 sm 0. 89 s 1C 082 2C ~ 0. 92 r'
ractors <<Pumps out for X Hours""
P~p lA. ~ 0.28 x 2A - 0.13 2C 24> .'23 ~ 0.11.
13 ~ 022 x ~ J sI ~ '.-.'o compute: 1. All pumps for 24 hours ~AxB~E
. 24.
2C>>038 v 2C ~ 2e One pu p out for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> A x 3 x -",
~ ~
24 '3. One pump out for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> - A x 3 (~ =- ~ 3
~ ~
~ ~
~E.
e <<
\
I 7eq'e Pc.~iod l'rom: . Time 9:30 e.m. Data 03/07/75 'o Time 9:30 e.m.'ate 03/08/75 Test Sateen 1 SA
~ ~ ' ' '
A D E e
Current Factox'actor if One Factor for Paxtial Estimate of
- e'tatics Number Counted for Test . or More Pumps Pump Operation Fish Imp'inged on Test: Screen Screen 'Out'or'4 Hrs.. 'Durin 24 Hr. Pd. Qurin 24 Hr. Pd.
Shad and Herring 10.,072 8.79 88 533
~ ~
Catfish 8. 79 Bass
.Large outh. 0
~
8.79 0 Smllmouth ~
Spotted 0 8.79 '0
~
Crappie
~
0 8.79 ~
0 Sunfish 2 8.79 Drum 8.7 e
Other 8.79 Total 10,081 ~
~ 88,613
~ ~
B Factors Sere'en
~ ~
1AA 6.81 'AA 14.60 ~ ~ ,Pump'.Activity During Test Period lAB 7.63 2AB 17.14 1BA, 8.79 2BA 20.15 1BB 9.06 2BB 17.34 1B 1CA. 10.28 2CA 19.43 ~ ~
8 1CB lle58 2CB 34.77 .. 1C Factors << out for 24 Hours C
Pump Pumps lA sm 0-72 'A ' 0. 87 :!A 1B ~ 0.78 2B 0. 89 1C ~. 082 2C ~. 0. 92 '3B Factors - Pumps out for X Hours"':
D Pump lA ~ 028 x 24. x 2A X~X 2C me 0.22 x x
.24 2B X
~ "':.'o compute: 1.
2.
All pumps fo" 24 One, pump hours out for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> A x B E.
~ A x B x C ~ E 1C 0+8 x C X BAT:HCL 24 24 '3. One pump out for g hours A x B - (D x .> x ~
sm i 1
0 1 C KV Ofl 4 v= ~ I
~'i en
~
Period Pron: ., T5me 9 a.m. Date 03IO9/75 . Zo Kame 9 a.m.
~ I
'ata
~
09/1WY9 Test Sateen I. an C
Current Factor Factor if One " ".Pactox'or. Partial Estima.te of-Hu'ber Counted for Test . or Nore. Pumps Pump Operation Fish Xr".pinged
~Seeies on Test Scxeen Screen Out'for'24 Hrs. Dur'in 24 Hr. Pd. Durin 24 Hr. Pd.
's 1
Shad nd Herring 8.79 84 428
~ ~
~ h ~
~
Catfish 8.79 Sass
...Largeeouth', . 0 8.79 0 I
.. S=allrouth 0 8.79
.-. Spotted 8.79 ~ ~ ~ ~
Ciappie
~ ~
I . 879 ~ I
~ 9 ~
~ ~
Sunfish I 8.79 44
~ ~
~ ~ ~
- 8. 79 123 .
D UQ ~ ~ ~
Other Tota1 ~ ~ ~ ~ ~ 84,675
~ ~
1 Factors Screen
~ ~
6.81 2AA 14.60
,Pump"Activity During Test Period B
~ ~
~ ~
1AA 1AB 1BA 7.63 8.79 2AB 17.14 2BA 20.3.5
~
1A ~ ~
1BB 9.06 17.34
'BB 1B
'1CA 10.28 2CA 19.43 1CB 11-58 2CB 34.77 1C Factors - Pumps out for 24 Hours
'A ~ 0.
~
C ~
Pump 1A 0-72 87 2A
~
1 at, AaI 0.78 2B ~ 0. 89 1C ' 082 2C ~ 0. 92 2B 9 Factors - P~pq out for X Hours"" X 2C P~p 1A ' 0.28 x 2A X ~~
24 022 z x am
.24 2B coLRpute a 1a All pumps fox'4 houx's A v B ~ E 1C ~ 0g8 )-
- 2C X 2a One pump out for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ~ A v 3 x C ~
f 24 24, '3. out for $ hours ss A g B - (D z A z E'ne
' pump .'
, BAT:~tiCL'I ~ ~
Ql)09)7" I ~ ~
r ~ a 4
~-
~ ie5t Period Prom: Zg~~ 9 a.m. Date 3/11/75 To Time 9 a m.'ate ~
3/12/75 Test Screen 1M '.
~
A Current Factor Factor if One 'ump Factor fox Partial Estimate of Number Counted for Test 'ox Nore Pumps Operation Fish Xmpinged
~Saaies on Test Screen Screen ~ Out'for'24 Hrs. :'Dur'in 24 Hr. Pd. Durln 24 Hr. Pd.
Shad and Herring 5,049 8.79 .
44 '381
~ ~
Catfish 8.79 26
': Bass
=;.Largemouth 0 8.79 0
-:- Smallmouth. '0 8.79
.-..Spotted 0 8.79 ~ ~ ~
'2 Crappie 0 8.79 ~ ~
Sunfish 8.79 70
~
F ~ ~ ~
"Drum a
~ 8.79 105 I
'0
~ ~
~ -.
Other 8.79 ~ ~
Total 5,080 ~ ~
44 B Factors Scxeen
~ ~
.. 1AA 6.81 'AA 14.60 .Pmp'Activity During Test Period 1AB 7.63 2AB 17.14 C 1BA 8.79 2BA 20.15 1BB 9.06 2BB 17.34 .B
~ '1CA 10.28 2CA 19.43 1CB 11.58 'CB 34.77 ~
i .'~.C Factors - Pumps ' out for.24 Pours C
Pump . 1A ~ 0 72 'A ~~ 0. 87
~ ~
2A 1B-= 0.78 2B 0. 89 1C~ 082 2C~ 0. 92 )B Factors >> out for X Hours"-
~ ~ ~
D Pump Pumps 1A ~ 0.28 x 2h,. 2A 0+13 x ~~~ ?C 1B~022 x x.2B ~ O.ll, x '.".o compute. All pumps for-24 hours A x .B ~ E 1C ~ 0.18. x = 2C ~ 0.08' One pump out for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ~ A x B x C ~ E
~ ~
24 24 3t One pump out for g hours ~ A x B (D x A x
~ ~
~ as P
I f 8 'I 0 I' 'I
. case. Period 1'rom: Time 9 a.m. '10 Timn 9 n.m I
A B D E Current Factor Factor if One. Factor for Partial . Estima.te of-
~ ~
Number Counted for Test or Nore Pumps Pump Operation Fish impinged
~Secies on Test Screen Screen ~ 'Out'for'24 Hrs. Duiin 24 Hr. Pd. Durin 24 Hr. Pd..
Shad and Herring 144 8.79 ~ ~ 106,745 I ~ r ~
~
I Catfish 8. 79. 18
~ ~
3ass
~ =.Largemouth' 0. 8.79 0 Sza11mouth Spotted
~ ~ ' 0
~
Crappie
~~
, 8.79
~~
~
~ ~
~
38
~
8.79
~
r ~
'34 'unfish
~ ~
Drum 8.79
~ ~
8.79 .62 Other
-4 107,274 Tota3. 12 2 ~ ~
4 8 Factors Screen .. 1AA 6.81 'AA 14.60 .Pump'ctivity During Test Period
~ ~
1AB 7.63 2AB 17.14 1BA 8.79 lBB 9.06 2BA 2BB 20.15 17.34 3A ~ ~
~
~
. "1CA 10.28 2CA 19.43 .
1CB 11.S8 " 2CB 34.77 ~
~
- .C Factors - Pumps out for 24 Hours
'A
~
C ~
~ ~
Pump 1A ~ 0-72 ~ 0. 87 .'?A 1B = 0-78 2B ~ 0. 89 1C ~ 0-82 2C ~ 0. 92 2B Factors - Pumps out for X Hours-"
D Pu p lA 0.28 x 24. 2A ~ 0.13
~ z '2K '?C 1B ~ 0.22 x x .2B ~ 0.11, x .YQ I
~
1C ~ 0g8 x 24x
~ 2'.
2C ~ 0 08 x 24
~
'.t'o compute:
. . '.'nc
- 1. A11 pumps for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ~ A x B ~ E pump out for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ~ A x B z C ~
One pump out for ~ hours -
Ax B (D x A E'3.
~ ~ ~ ~
~ ~
E
O.
f< ~~ P
I~
~"
.'s."
i Period v...t,m ~
Prom'. Time 9 n.m., Date 3/16/75 To TXNG 9 a'~ ~s Dnte "'.<~~/~"'. Test Sntnen i sn e A C if One 'actor n
Current Factor Fa"'tor for Partial Estimate of Number Counted for Test o- More Pumps Pump 4peration Fish Tnpinged
'Ou" 'or '4 Hrs.
~
ms
- ~Senies on Test Screen Screen ~ 'Duiin 24 Hr. Pd. Burin 24 Hr. Pd.
tsar and Herring 1,514 8.79 13,308 catfish r ~ ~
I, ~
10 8.79 88 C cc
~ ~
Lss,
.Largemouth 0 8.79 0
'mallmouth ~ ~
Spotted c
~ c appie 0 , 8.79
~ ~
~ ~
fnfish 8. 9 4 ~ ~ ~
~
num S ~
37 8.79 325
- her 36 8.79 ~
316 e
-Total 1,641 14,424
~
Factors 'Screen, 1AA. 6.81 'AA 14.60 .Pump .Activity Duriag Test. Period 1AB 7.63 . 2AB 17.14 1A
'BA 20.3.5
~ ~
~ - 1BA 1BB 8.79 9.06 'BB 17.34 1B
'1CA 10.28 2CA. 19.43 1CB 11.58 " 2CB 34.77 Factors - Pu"-ps out for 24 Hours
'A ~ 0. 87 ~ ~
P ucmp 1A 0-72 2A 1B 0-78 2B ~ 0.89 1C ~ 082 2C ~ 0.92 2B Factors out for X Hours""
hu=p Pumpsr 1A 0.28 x 2A ~ O.l3 x ~ 2C r
~ 0.22 - 24x x x .2B ~ 0.1', x ~x s ~
1B To compute: 1. All pumps for 24 hours A x B E
~ Og8 x x 2C ~ 0.08'x -.2. Ore pump out for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ~ A x B x C ~
1C
~
~ ~
24 24 One pump ou" fo" g hours Ax p (D x g x 3)
Z'3.
~ ~
~ 'mn P
~ .
0 II
'Jj~~g 9 II,I~ J/ J.P/ I 4 To Time s ii "'
~
gqtc .rg ~
erg ~ os
~ ~
2o/~5 h D E Current Factor Factor if One Factor for Partial. Estizate of or More Pumps 'ump
~
Hu-ber Counted for Te t Operation Fish Tmpin'ged Soecies on Test Screen Screen ~ Out'for. 24 Hrs.:'Dur'in 24 Hr. Pd. Durin 24 H . Pd; 6,073 8. 79 53,382 Shad and Herring
~ ~
318 8. 79 2,795 Catfish ~ ~
P t ~ ~
Bass 0. 8.79 0
~ t
..Large-outh'=allmouth 0 8.79 Spotted 0 8.79
~ ~ 8.79 9.
Crappie ~ ~
J
~ 28 8.79 ~
'246 Sunfish ~
149 8.79 . 1,310.
Drum
~ Othe" 8.79 '60 6,610. 58,102 Total ~ ~
~ ~
'AA 14.60 .Pump .Activity During Test. Period 8 Factors Screen j.AA 6. 81 17.14
'"lAB 7.63 2AB 1A BA 8. 79'BB 2BA 20.15 9.06 2BB 17.34
'1CA 10.28 2CA 19.43 1CB 11.58 'CB 34.77 C Factors - Pu ps out for 24 Hours
'A ~
'D ump 1A 0.72 0. 87 ,2A Vn AlP 0.78 2B ~ 0. 89 1C ~ 0.82 2C ~ 0. 92 D ~c~ctors ~ Pump/ out for X Hours""
o Pb~p 1A ~ 0.28 x 2A "0.13 x ~~.
~ 0.11, x 2C IB ~ 0.22 x >- .2B To co pute: 1. All pumps for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> A x B
~ 24
. ~ 0.08': ~ One pump out for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ~ A x B z C ~ E
lC ~ 038 x 24 2C
~
~
24 '3. One pump out for ~ hours ~ A x p (D x A x
~ ~
~ ~
~ ~
4
0 I ~
g ~est Pe"Xod J
E'rom'. Time 9 a m. ~
Data 2/20/75 Ta Time 9 a.m. 'ata ~~~; Teat Scrccn ~ '!A' C D Current Factor Factor if One Factor for Partial Estimate ef Number Counted for Test or Nore Pumps Pump Operation Fish Impinged
~Saaiea on Test Screen Screen Out'for'24 Hrs. 'Durin 24 Hr. Pd. Durin 24 Hr. Pd.
Shad nd Herring 3,076 8.79 27 038 Catfish 8.79
. Bass 0 8.79 0
.Largemouth Smallmouth 0 8.79 8.79 0' Spotted 0
~
. Crappie
~
.8. 79
\
Sunfish 34 8.79 ~
299 Drum a a 140 8.79 1,231 Other 20 8.79. 176 Total 3,287 28 894 Factors Screen 1AA 6.81 'AA 14.60
.Pump .Activity During Test Period B
1AB 7.63 2AB 17.i4 ,1A 1BA 8.79 2BA 20.15 lBB 9.06 2BB 17.34 13
'1CA 10.28 2CA 19.43'CB lCB 11.58 34.77 C 'Fac"ors - Pumps ' out for 24 Hours Pump ~ 1A~ 0.72 '2A~ 0. 87 2A 3.B-= 0.78 2B ~ 0. 89 1C ~ 0.82 2C ~ 0. 92 Factors - Pumps out for X Hours""
~~ ~
D P ~~p lA ~ 028 x
-2k 2A X~X -2C lB ~ 0.22 x > .2B x ~x To compute'a All pumps for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> = A x B ~ E
- 24. E
Og8, x out fo" 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ~ A x B x C ~
~ ~
2C X x ~ ~
One
'u-p 24 24 3e One pump out for g hours ' A x B (D y. g. x 1
~ ~ am F
~ ~
I WO R6 A'>>
iesL.Period From: ~ Time 9~m Date 3/23/75 To Time 9 a m. Date 3/2/I/75 Test Scrccn 1 BA
~
C E Curxent Factor 'actor if One Factor fox'artial '. Estima'te of Fish Impinged Number Counted for Test or More Pumps Pump Operation Sr>ecias on Test Screen Screen . Out for'24 Hrs. :'Durin'4 Hr. Pd. Dux'in 24 Hr. Pd.
Shad and Herring 5,282 8.79 0.0146 45,752
.Catfish 8.79 0.0146. 364 Bass
- .Largemouth 0 8.79 0.0146 0
~
S"allmouth 0 ~ ~
8.79 O.OA6 Spotted. 0 8.79 6 '.01/
~
0.0146 69 '.
~ ~
Crappie .8. 79
~ ~
Sunfish 63 8.79 0.0146 546 Drum ~ 406 8.79 '3,517 Other 41 8.79 0.0146 '355 5,842
'.79 Total "'
~ ~ ~
~ 0.0146 50 603
~ ~
6.81 .Pump'.Activity During Test Period 3 Factors Screen 1AA 2AA 14.60 lAB 7,63 2AB 17.14 :LA
'lBA .8.79 2BA, 20.15 1BB 9.06 2BB 17.34 'I B
"1CA 10.28 2CA 19.43 1CB 11.58 2CB 34.77 ."iC OFF .5 hour5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> C Factors - Pumps out for 24 Hours N ~Ip 3A ~ 0.72 'A. ~ 0. 87 -2A OFF 2.hours 0.78 2B 0. 89 1C ~ 082 . 2C~ 0. 92 2B D Factors - Pumps out for X Hours""
Pump lA ~ 0.28 x " 2A O.a3 X~XX ?C 1B 022 x ~k
.24
. 2B 0.11, X ~
,JA compute: .1. All pumps for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> A v B E .
X X 2,. One pu=p out for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Ax B z C OZ8,
~ ~
24 24 '3. One pump out for g hours ~ A x B -g
~
~ cs F 0
Il S '\
l ."..
icst- Period Pron. ~ . Time <~~>. Date ~i~ To Time ~(~,'ate ~~l~ Tcs't Jcroon ~r .
r r.
I A E V A
Current Factor Factor if One . Factor for Partial Estimate. of
~ ~
for Test Pump Operation Fish impinged
~secures Number Counted on Test Screen Screen . 'ut for o Nore Pumps 24 Hrs.
Duiin 24 Hr. Pd. Durin 24 Hr. Pd.
Shad and Herring 168 19.43 .36 Catfish 19.43 .36 42 pC-=-f Bass 0 19.43 .36 0
.L~rgemouth'mallmouth 0
I 19.43 .36 '0 Spotted 19.43 .36 0
~
Crappie
~
.19.43 .36 ~ ~
V Sunfish 18 . .36 ~
'126
~ ~
19.43'9.43 Drum 99 .36 692 '
'ther 13 19.43 .36 .91
~ ~
To" a3. 306 2,140 V
B Factors Screen 6.81 'AA 14.60 .Pump'.Activity During Test Period
~ ~ 1AB 7.63 2AB 17.14 \
Z aBA 8.79 2BA 20.15 1BB 9.06 2BB 17.34
'1CA 10.28 2CA 19.43 1B Off 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 1CB 11.58 2CB 34.77 ~
. 1C Off 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
'Factors - Pumps out for 24 Hours C
, Pump ~
aA- 0.72 'A ~ 0. 87 , 2A Of f 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AV 0.78 2B ~ 0. 89 1C ~ 042 2C ~ 0. 92 Off 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Factors << Pumps out for X Hours""
P ~~p 1A ~ 0.28
.-2k X~XX 2C.
1B 0.22 x
.24
. 2B X~ Tc computes 1~ All pumps for 24 hours ~AX B~=-
$C 03.8, x . 2C X ~ 2~ One pu p out for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ~ A x B x C ~ Z' One pan ou t for as
~ ~
24 24 "3. hours A:. B-- (D x A X B3 srr E
~ ~ ~
t 'g
~
f=. e
~ c'est Period X'ro-: 9:00 a.m Date 03/27/75 To Time >:0<<.m Date 03/28/75 Test Screen 2CA Current Factor Pactor if One 'ump Pactor for Partial Estimate oK Number Counted- for Test or More Pumps Operation Pish Tr ping d Soecies on Test Screen Screen Out'for'24 Hrs. :'Durin 24 Hr. Pd. Durin 24 Hr. Pd.
Shad and Herring 802 19.43 .475 7,402
= C1- ~ ~
19.43 .475 212 Catfish 23
. Bass
~ : .Largemouth 0 19.43 .475 0
-.-. Small outh 0 ~
19.43 .475
':; Spotted 0 19.43 .475
~ ~
6 ,19.43 .475 55.
Crappie
~ 4 Sunfish e39 ~
19.43 .475 360 tl 39138.
Drum o c 340 19.43 .475 44 19.43 .475 '406 Other Total 1 254 ll 573 C
1 ga lAA 6.81 'AA 14.60 .Pump .Activity During Test. Period B Factors Screen lAB 7.63 2AB 17.14 1BA 8.79 2BA 20.15 1BB 9.06
'1CA 10.28 2BB 17.34 2CA 19.43
'B Of f 11. 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1CB 11.58 'CB 34.77 lC Of f 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> C 'Factors Pumps out for 24 Hours Pu p lA, ~ 0.72 0. 87 2A Off 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0-78 2B O. 89 1C ~ 042 2C ~ 0. 92 2B Off 24 hours Factors << P~pq out for Hours""
D P~p 1A ~ 0.28 X
x
'k 2A x~x 2C ca 022 x .2B Tc compute+ "~ All pumps for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> A x B ~ E
. 24.
out for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> A x B x C ~ Z
lC ~ 038 z 24-.2C x 24 20 30 One pu'p One pu"p out for 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> A x B (D x A x B)
~ ~ ce P
0 ~ ti J
I ll 4-. V
T st Period Prom.'gne 'J s Date ~I~UI I ~ Xo Xicle J
~
n,lll.
~
Uctc ~JI 11 I'lc-l.
e A D
~ ~ )
Cuxrent Factor Factor o" Yore if One'. Pactor for Partia3. + r.ski=,ace o
'umber Counted for Test Pumps . Pump Operation Fish '&ping
~Senses on Test Screen Scx'een ~ 'ut'for'24 Hrs. Du"'inc 24 Hr. Pd. Durin< 24 H ;
~,
' 515 8.79 ,58 Shad and Herring . 17,920 eI
~ e Cat ish
~
8.79 .58 76 Bass ~ ~
.Largemouth 0 8.79 .SR 0 S-a11=outh 0 8. 79 .58 Spotted .
I 58'58 Crappie 0 8.79 0
~
I Sunf.'sh ~
42 8.79 214 Drum ~ ~
188 8. 79 .58 958
~ r
'I, 30 Other 8.79 ,58 153 i ~
Total 3,790 ~ ~
~ ~ 19,321 r
~
e
'AA 14.60 ,Pump'.Activity During Test Period B Factors Screen . 1AA .6.81 1AB 7.63 2AB 17.i4 1BA 8. 79 2BA .20.15 lBB 9.06 2BB 17.34 3.B
~ "1CA 10.28 2CA 19.43 .
1CB 11.58 2CB 34.77 ~
. 1C OFF 24 nours tfactors >> out for 24 Hours Pump Pu=ps 3A 0.72 'A ~ 0. 87 I OFF .24.hours 1B.= 0.78 2B ~ 0. 89 1C 0.82, 2C p. 92 OFF 24 .hours Factors - X'umph out for X Houxs""
D 1A ~ =
0.28 .y. 24.
.2A ~ 0.13 x X
~~
2C
'tB ~ 022 v. 2B ~ p.13., ~ To compute:.. 1.. A11 pumps fo- 24 hous~AxB~Z,
.24 One pu=p out for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. ~ A x 3
- 038 ~= < z ~
,~4'08 C
-s C."
1C 24 2C
~ ~ ~
"3. One pump out fo>>
ax P I ho'mrs
~
~
Ax B - (D x