ML18282A077

From kanterella
Jump to navigation Jump to search
Request for Withholding Proprietary Information from Public Disclosure for the Vogtle Electric Generating Plant, Units 3 and 4 (LAR 17-043S1)
ML18282A077
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/11/2018
From: Bill Gleaves
NRC/NRO/DLSE/LB4
To: Gresham B, Whitley B
Southern Nuclear Operating Co, Westinghouse
GLEAVES B/415-5848
References
LAR 17-043S1
Download: ML18282A077 (7)


Text

October 11, 2018 Mr. Brian H. Whitley, Director Mr. James A. Gresham, Manager Regulatory Affairs Regulatory Compliance Southern Nuclear Operating Company Westinghouse Electric Company 3535 Colonnade Parkway, Bin N-226-EC 1000 Westinghouse Drive Birmingham, AL 35242 Bldg. 3, Suite 310 Cranberry Township, PA 16066

SUBJECT:

REQUEST FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE FOR THE VOGTLE ELECTRIC GENERATING PLANT, UNITS 3 AND 4 - SEPTEMBER 28, 2018 LETTER, ENCLOSURE 12, SUPPLEMENT TO REQUEST FOR LICENSE AMENDMENT AND EXEMPTION: CONTAINMENT PRESSURE ANALYSIS (LAR-17-043S1)

Dear Messrs. Whitley and Gresham:

By letter dated September 28, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18271A188), Southern Nuclear Operating Company (SNC) submitted affidavits in Enclosures 14 and 15, dated September 28, 2018 and August 22, 2018, signed by Mr. Brian H. Whitley and Ms. Jill S. Monahan, respectively, requesting the information contained in Enclosure 12 be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390. Enclosure 11 of the September 28, 2018, letter provides the non-proprietary version of Enclosure 12.

The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

1. The information sought to be withheld from public disclosure is owned and held in confidence by SNC and Westinghouse Electric Company (WEC).
2. The information is of a type customarily held in confidence by SNC and WEC and not customarily disclosed to the public
3. The release of the information might result in the loss of an existing or potential competitive advantage to SNC and/or WEC.
4. The information is of a type customarily held in confidence by WEC and not customarily disclosed to the public. WEC has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence.
5. There are sound policy reasons behind the WEC system.
6. The information was transmitted to the Commission in confidence, under the provisions of 10 CFR 2.390.
7. Public disclosure of the information is likely to cause substantial harm to the competitive position of WEC and would enhance the ability of competitors to provide

B. Whitley J. Gresham similar technical evaluation justifications and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRCs requirements for licensing documentation without purchasing the right to use the information.

8. The release of information may harm SNC because SNC has a contractual relationship with WEC regarding proprietary information. SNC is contractually obligated to seek confidential and proprietary treatment of the information.
9. The information sought to by SNC is not available in public sources or available information has not been previously employed in the same manner or method, to the best of SNC and WECs knowledge and belief.
10. The information should be held in confidence for the following reasons (itemized as items (a) and (c) in Enclosure 11):

(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of WEC's competitors without license from WEC constitutes a competitive economic advantage over other companies.

(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390, and on the basis of the statements in the affidavits, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version(s) of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

B. Whitley J. Gresham If you have any questions regarding this matter, I may be reached at 301-415-5848.

Sincerely,

/RA/

William (Billy) Gleaves, Sr. Project Manager Licensing Branch 4 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors Docket Nos.: 52-025 52-026 cc: see next page

ML29393A077 NRO-008 OFFICE DLSE/LB4:PM DLSE/LB4:LA DLSE/LB4:BC DLSE/LB4:PM JDixon-Herrity (CPatel WGleaves (s)

NAME WGleaves (c) RButler for)

DATE 10/11/18 10/9/18 10/11/18 10/11/18 Vogtle Units 3 & 4 Mailing List (Revised 08/16/2018) cc:

Office of the Attorney General Resident Inspector 40 Capitol Square, SW Vogtle Plant Units 3 & 4 Atlanta, GA 30334 8805 River Road Waynesboro, GA 30830 Resident Manager Oglethorpe Power Corporation Mr. Barty Simonton Alvin W. Vogtle Nuclear Plant Team Leader 7821 River Road Environmental Radiation Program Waynesboro, GA 30830 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company, Inc. 4244 International Parkway, Suite 120 Document Control Coordinator Bin N-226-EC Atlanta, GA 30354-3906 3535 Colonnade Parkway Birmingham, AL 35243 George B. Taylor, Jr.

2100 East Exchange Pl Anne F. Appleby Atlanta, GA 30084-5336 Olgethorpe Power Corporation 2100 East Exchange Place Brian H. Whitley Tucker, GA 30084 3535 Colonnade Parkway, Bin N-226-EC 42 Inverness Center Parkway, BIN B237 County Commissioner Birmingham, AL 35243 Office of the County Commissioner Burke County Commission Mr. Michael Yox Waynesboro, GA 30830 Site Regulatory Affairs Director Vogtle Units 3 & 4 Mr. Wayne Guilfoyle 7825 River Road, Bin 63031 Commissioner District 8 Waynesboro, GA 30830 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3

Vogtle Units 3 & 4 Mailing List Email acchambe@southernco.com (Amy Chamberlian) agaughtm@southernco.com (Amy Aughtman)

ALPUGH@southernco.com (Amanda Pugh) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)

Bill.Jacobs@gdsassociates.com (Bill Jacobs) bjadams@southernco.com (Brad Adams) bwwaites@southernco.com (Brandon Waites) castelca@westinghouse.com (Curtis Castell) comerj@westinghouse.com (James Comer) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dgbost@southernco.com (Danny Bost) dlfulton@southernco.com (Dale Fulton) drculver@southernco.com (Randy Culver) durhamdc@westinghouse.com (David Durham) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David) erg-xl@cox.net (Eddie R. Grant) fdhundle@southernco.com (Forrest Hundley) fhwillis@southernco.com (Fred Willis)

G2NDRMDC@southernco.com (SNC Document Control) graysw@westinghouse.com (Scott W. Gray) jadwilli@southernco.com (J.D. Williams) james1.beard@ge.com (James Beard) jannina.blanco@pillsburylaw.com (Jannina Blanco) jantol1dj@westinghouse.com (David Jantosik) jenmorri@southernco.com (Jennifer Buettner)

JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)

John.Bozga@nrc.gov (John Bozga)

Joseph_Hegner@dom.com (Joseph Hegner) jpredd@southernco.com (Jason R. Redd) jranalli@meagpower.org (Jerry Ranalli) karen.patterson@ttnus.com (Karen Patterson) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy)

KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa)

Page 2 of 3

Vogtle Units 3 & 4 Mailing List Matthew.Williams@hq.doe.gov (Matthew Williams) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)

Melissa.Smith@Hq.Doe.Gov (Melissa Smith)

Michael.Kuca@hq.doe.gov (Michael Kuca) mike.price@opc.com (M.W. Price)

MKWASHIN@southernco.com (MKWashington) mlgraves@southernco.com (Michelle Graves)

MSF@nei.org (Marvin Fertel) myox@southernco.com (Mike Yox) nirsnet@nirs.org (Michael Mariotte)

Nuclaw@mindspring.com (Robert Temple) patriciaL.campbell@ge.com (Patricia L. Campbell)

Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) r.joshi15@comcast.net (Ravi Joshi)

RJB@NEI.org (Russell Bell)

Ronald.Jones@scana.com (Ronald Jones) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak) sblanton@balch.com (Stanford Blanton)

Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) skauffman@mpr.com (Storm Kauffman) sroetger@psc.state.ga.us (Steve Roetger) stephan.moen@ge.com (Stephan Moen) stephen.burdick@morganlewis.com (Stephen Burdick) tom.miller@hq.doe.gov (Tom Miller)

TomClements329@cs.com (Tom Clements)

Vanessa.quinn@dhs.gov (Vanessa Quinn) vcsummer2n3@gmail.com (Brian McIntyre) wasparkm@southernco.com (Wesley A. Sparkman) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver) x2gabeck@southernco.com (Gary Becker) x2kmseib@southernco.com (Kristin Seibert)

Page 3 of 3