ML18271A186

From kanterella
Jump to navigation Jump to search
Request for Additional Information, Request for Revised Rv Materials Surveillance Capsule Withdrawal Schedules, Surry Power Station, Units 1 and 2
ML18271A186
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/27/2018
From: Alina Schiller
Plant Licensing Branch II
To: Lovett C, Geoffrey Miller
Dominion Energy Co
Schiller A
References
Download: ML18271A186 (2)


Text

From:

Schiller, Alina To:

gary.d.miller@dominionenergy.com; candee.lovett@dominionenergy.com

Subject:

Request for Additional Information, Request for Revised RV Materials Surveillance Capsule Withdrawal Schedules, Surry Power Station, Units 1 and 2 Date:

Thursday, September 27, 2018 4:13:00 PM Attachments:

Surry Final RAI 2018-09-27.docx Gary/Candee, By letter dated July 28, 2017 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML17213A080), as supplemented by letters dated March 19, 2018 (ADAMS Accession No. ML18085A159), and June 5, 2018 (ADAMS Accession No. ML18162A099), the Virginia Electric and Power Company (Dominion Energy Virginia) requested revision of the reactor vessel materials surveillance capsule withdrawal schedules for Surry Power Station (Surry), Units 1 and 2 in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix H, Reactor Vessel Material Surveillance Program Requirements,Section III.B.3.

The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided in your aplication and determined that additional information is required in order to complete the review. The enclosed request for additional information (RAI) was emailed to the licensee in draft form on September 26, 2018. As discussed with the licensees staff on call on September 27, 2018, the NRC staff requests your response to the RAI by October 27, 2018.

If you have any questions, please feel free to contact me at Alina.Schiller@nrc.gov or 301-415-8177.

Sincerely, Alina Schiller Project Manager Rotation in NRR/DORL/Plant Licensing Branch 2-1 O-7 E05 301-415-8177

REQUEST FOR ADDITIONAL INFORMATION FROM THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR REVISED REACTOR VESSEL MATERIAL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULES SURRY POWER STATION, UNITS 1 AND 2 DOCKET NUMBERS 50-280 AND 50-281

1.0 INTRODUCTION

By letter dated July 28, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17213A080), as supplemented by letters dated March 19, 2018 (ADAMS Accession No. ML18085A159), and June 5, 2018 (ADAMS Accession No. ML18162A099), the Virginia Electric and Power Company (Dominion Energy Virginia) requested revision of the reactor vessel material surveillance capsule withdrawal schedules for Surry Power Station (Surry), Units 1 and 2 in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix H, Reactor Vessel Material Surveillance Program Requirements,Section III.B.3.

Specifically, the licensee proposed to delay the withdrawal of capsule Z of Unit 1 from 2025 to 2027, and to delay the withdrawal of capsule U of Unit 2 from 2027 to 2032. In order to complete its review, the NRC staff requests the following additional information. Please provide your response to the following requests for additional information (RAIs) within 30 days of the date of this correspondence.

2.0 ISSUE In its request, the licensee stated that the proposed withdrawal schedule conforms to ASTM Standard E-185-82, Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels, as required by 10 CFR Part 50, Appendix H.

Changes that do not conform to the ASTM standard referenced in Appendix H (ASTM E-185-

82) will require approval by the license amendment process.

3.0 RAI

1.

Please describe in detail how the proposed capsule withdrawal schedule is in conformance with ASTM E-185-82 requirements for both Unit 1and Unit 2.

2.

Based on the submittal for Unit 2, it appears that capsule W has been withdrawn but has not been tested. If the capsule has been tested, please provide the capsule test report, and describe in detail how the status of capsule W affects the conformance of the proposed withdrawal schedule with ASTM E-185-82.

For each request above, please explain the original design and licensing basis requirements and how 10 CFR 50, Appendix H is met for each unit including any voluntary changes that have been incorporated up to ASTM E 185-82.