Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, Texas 77483 September 26, 2018 NOC-AE-18003595 10CFR72.4 10CFR 2.202 ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 South Texas Project Units 1 and 2 Docket No. STN 50-498; STN 50-499; 72-1041 Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for South Texas Project Electric Generating Station Independent Spent Fuel Storage Installation (ISFSI)
References:
- 1. Letter from the Scott W. Moore, NRC to Dennis Koehl, STP, "Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for South Texas Project Electric Generating Station Independent Spent Fuel Storage Installation", December 30, 2014, AE-NOC-15002608, ML14358A288.
- 2. Letter from G.T. Powell, STP to NRC, "Twenty-Day Response to NRC Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for South Texas Project Electric Generating Station Independent Spent Fuel Storage Installation (ISFSI)(EA-14-190)", January 15, 2015, NOC-AE-15003208, ML15029A422.
- 3. Letter from G.T. Powell, STP to the NRC, "Request for Extension of Full Compliance with the Provisions of the NRC Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for South Texas Project Electric Generating Station Independent Spent Fuel Storage Installation (ISFSI) (EA-14-190)",
Decembers, 2015, NOC-AE-15003317, ML16015A017.
- 4. Letter from Scott W. Moore, NRC to Dennis L. Koehl, STP, "Relaxation of Schedule for Requirements of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access at the South Texas Project Electric Generating Station Independent Fuel Storage Installation", April 29, 2016, AE-NOC-16002850, ML16102A349.
- 5. Letter from James Connolly, STP to the NRC, "Request for Extension of Full Compliance with the Provisions of the NRC Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for South Texas Project Electric Generating Station Independent Spent Fuel Storage Installation (ISFSI) (EA-14-190)",
December 14, 2016, NOC-AE-16003420, ML16365A021.
- 6. Letter from Marc L. Dapas, NRC to James W. Connolly, STP, "Second Schedule Relaxation From Requirements in the Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access at the South Texas Project Electric Generating Station Independent Spent Fuel Storage Installation", May 26, 2017, AE-NOC-17003001, ML17096A706.
STI:34719481
NOC-AE-18003595 Page 2 of 3 This letter is to inform the NRC that the STP ISFSI is in compliance with the additional security measures required by the Order in Reference 1, EA-14-190. STPNOC currently plans to begin storing spent fuel in HI-STORM FW Dry Cask Storage System on or approximately January 14, 2019. This notification is required at least 90-days prior to the first storage of spent fuel in dry casks under the STPNOC ISFSI general license.
As directed by Order EA-14-190, Reference 1, STP Nuclear Operating Company (STPNOC) submitted a twenty-day response consenting to the Order, in Reference 2. By References 3 and 5, STPNOC submitted to the NRC requests for date extensions to be in compliance with Reference 1, and in References 4 and 6, the NRC granted the requested extensions.
STP submitted Revision 23 of the STP physical security plan to the NRC on July 18, 2018, which contains the ISFSI security enhancements.
There are no commitments in this letter.
If there are any questions regarding this matter, please contact Rafael Gonzales at (361)972-4779.
^
Michael P. Murray Manager, Regulatory Affairs
NOC-AE-18003595 Page 3 of 3 ec:
Lisa M. Regner Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (09E01) 11555RockvillePike Rockville, MD 20852 NRC Resident Inspector U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN116 Wadsworth,TX 77483 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 E. Lamar Boulevard Arlington, TX 76011-4511