ML18255A091
ML18255A091 | |
Person / Time | |
---|---|
Issue date: | 09/12/2018 |
From: | Jeffrey Mitchell Acquisition Management Division |
To: | Beckman Associates |
References | |
31310018D0011 | |
Download: ML18255A091 (18) | |
Text
PAGE OF PAGES ORDER FOR SUPPLIES OR SERVICES IMPORTANT: Mark all packages and papers with contract and/or order numbers. 1 18
- 1. DATE OF ORDER 2. CONTRACT NO. (If any) 6. SHIP TO:
31310018D0011
- a. NAME OF CONSIGNEE
- 3. ORDER NO. 4. REQUISITION/REFERENCE NO.
NUCLEAR REGULATORY COMMISSION 31310018F0135 NRR-18-0197
- 5. ISSUING OFFICE (Address correspondence to) b. STREET ADDRESS US NRC - HQ NUCLEAR REGULATORY COMMISSION ACQUISITION MANAGEMENT DIVISION MAIL STOP TWFN-07B20M JEFFREY R MITCHELL 301-415-5074 WASHINGTON DC 20555-0001 c. CITY d. STATE e. ZIP CODE WASHINGTON DC 20555-0001
- 7. TO: f. SH P VIA
- a. NAME OF CONTRACTOR BECKMAN ASSOCIATES INC 8. TYPE OF ORDER
- b. COMPANY NAME
- a. PURCHASE X b. DELIVERY
- c. STREET ADDRESS REFERENCE YOUR:
1071 STATE RTE 136 SUITE 20 Except for billing instructions on the reverse, this delivery order is subject to instructions contained on this side only of this form and is issued Please furnish the following on the terms subject to the terms and conditions and conditions specified on both sides of of the above-numbered contract.
- d. CITY e. STATE f. Z P CODE this order and on the attached sheet, if any, BELLE VERNON including delivery as indicated.
PA 150122926
- 9. ACCOUNTING AND APPROPRIATION DATA 10. REQUISITION NG OFFICE See Schedule OFF OF NUCLEAR REACTOR REGULATION
- 11. BUS NESS CLASS FICATION (Check appropriate box(es)) 12. F.O B. POINT X a. SMALL b. OTHER THAN SMALL c. DISADVANTAGED d. WOMEN-OWNED e. HUBZone
- f. SERVICE-DISABLED g. WOMEN-OWNED SMALL BUS NESS (WOSB)
- h. EDWOSB VETERAN-OWNED ELIGIBLE UNDER THE WOSB PROGRAM
- 13. PLACE OF 14. GOVERNMENT B/L NO. 15. DELIVER TO F.O B. POINT 16. DISCOUNT TERMS ON OR BEFORE (Date)
- a. INSPECTION b. ACCEPTANCE 12/31/2018 Destination Destination 30
- 17. SCHEDULE (See reverse for Rejections)
QUANTITY UNIT QUANTITY ITEM NO. SUPPLIES OR SERVICES ORDERED UNIT PRICE AMOUNT ACCEPTED (a) (b) (c) (d) (e) (f) (g)
The Contractor shall provide Design Bases Inspection Support Services in accordance with the Task Order Statement of Work.
Accounting Info:
2018-X0200-FEEBASED-20-20D003-1054-11-5-139-251A-11-5-139-1054 Continued ...
- 18. SHIPPING POINT 19. GROSS SHIPPING WEIGHT 20. INVOICE NO. 17(h)
TOTAL (Cont.
pages)
- 21. MAIL INVOICE TO:
- a. NAME $0.00 FISCAL ACCOUNTING PROGRAM SEE BILLING INSTRUCTIONS ON REVERSE
- b. STREET ADDRESS ADMIN TRAINING GROUP AVERY STREET A3-G (or P.O. Box)
BUREAU OF THE FISCAL SERVICE 17(i)
GRAND PO BOX 1328 TOTAL
- c. CITY d. STATE e. Z P CODE
$226,168.47 PARKERSBURG WV 26106-1328
- 22. UNITED STATES OF 23. NAME (Typed) 09/12/2018 AMERICA BY (Signature) JEFFREY R. MITCHELL TITLE: CONTRACTING/ORDER NG OFFICER AUTHORIZED FOR LOCAL REPRODUCTION OPTIONAL FORM 347 (Rev. 2/2012)
PREVIOUS EDITION NOT USABLE Prescribed by GSA/FAR 48 CFR 53.213(f)
ORDER FOR SUPPLIES OR SERVICES PAGE NO SCHEDULE - CONTINUATION 2 MPORTANT: Mark all packages and papers with contract and/or order numbers.
DATE OF ORDER CONTRACT NO. ORDER NO.
31310018D0011 31310018F0135 ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT AMOUNT QUANTITY ORDERED PRICE ACCEPTED (a) (b) (c) (d) (e) (f) (g)
Period of Performance: 09/10/2018 to 12/31/2018 TOTAL CARR ED FORWARD TO 1ST PAGE (ITEM 17(H)) $0.00 AUTHORIZED FOR LOCAL REPODUCTION OPTIONAL FORM 348 (Rev. 4/2006)
PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.213(f)
CONTRACTOR ACCEPTANCE OF TASK ORDER 31310018F0135 Acceptance of Task Order No: 31310018F0135 should be made by having an official, authorized to bind your organization.
Accepted Task Order No: 31310018F0135:
Name Title Date Page 3 of 26
SECTION C - STATEMENT OF WORK 1.0 TITLE Design Bases Assurance (DBA) inspections for Indian Point and North Anna.
2.0 BACKGROUND
In accordance with the baseline inspection portion of the Reactor Oversight Process (ROP), the U.S.
Nuclear Regulatory Commission (NRC) inspects various activities at nuclear power reactor plants.
3.0 PERIOD OF PERFORMANCE September 10, 2018 through December 31, 2018.
4.0 TASK ORDER OBJECTIVE The objective of this task order is to obtain contractor support to assist the NRC inspection teams in the performance of DBA inspections at 1) Indian Point; and 2) North Anna. The requirements are:
Each DBA inspection requires one mechanical and one electrical systems engineer.
See attached schedule, which contains the calendar year 2018 DBA inspection schedule for when the DBA support by contractors is needed. These inspection schedules may change during CY2018. Given that no date revisions will exceed this task orders overall period of performance, changes to individual inspection dates will be provided to the contractor by the Technical Contracting Officer Representative.
5.0 SCOPE OF WORK The contractor shall provide technical support to the assigned NRC Regional Team Leader (RTL) during the performance of the above DBAs in accordance with the enclosed schedule. The following Inspection Procedure (IP) and Inspection Manual Chapter (IMC) will be used:
IP 71111.21M, Design Bases Assurance (DBA) Inspection (Team)
IMC 0612, Power Reactor Inspection Reports The NRC RTL may issue technical direction during the duration of the task order. Technical direction must be within the general Statement of Work stated in the task order, and shall not constitute new assignments of work or changes of such nature as to justify an adjustment in cost or period of performance. The contractor shall refer to the basic contract for further information and guidance on any technical directions issued under this task order.
Any modifications to the scope of work, cost, or period of performance of the task order must be issued by the Contracting Officer and will be coordinated with the Project Officer.
Page 7 of 26
The proposal should also include a monthly estimate of expenditures (spending plan).
6.0 SPECIFIC TASKS The below four specific elements should be performed for each of the above DBA inspections, and shall be performed in accordance with the requirements, standards, deliverables, and completion timeframes specified in the base contracts Statement of Work.
Task 2 Element 1 - Inspection Preparation Task 3 Element 2 - Conduct Onsite Inspections Task 4 Element 3 - Conduct Home Office Inspection: Input Preparation Task 5 Element 4 - Documentation of Inspection Results 7.0 TECHNICAL REPORTING REQUIREMENTS FOR EACH INSPECTION The technical reporting requirements for each of the above DBAs shall be performed in accordance with the requirements specified in Task 6 of the base contract.
8.0 PERSONNEL REQUIREMENTS The engineering inspection specialists shall have a design background (such as from an architect-engineer firm) and experience/knowledge regarding:
- 1) Design, analysis, operations, installation, modification, maintenance and testing of nuclear plant safety systems.
- 2) Reviewing design basis and detailed design (calculations, drawings, etc.) of nuclear plant safety systems.
All of the specialists should have knowledge/experience with NRC regulations and risk informed inspection methodology.
It shall be the responsibility of the contractor to assign qualified technical staff, employees, and subcontractors, who have the required educational background, experience, or combination thereof, to meet both the technical and regulatory objectives of the work specified in this Statement of Work (SOW). The NRC will rely on representation made by the contractor concerning the qualifications of the personnel proposed for assignment to this task order including assurance that all information contained in the technical and cost proposals, including resumes and conflict of interest disclosures, is accurate and truthful.
Page 8 of 26
9.0 ESTIMATED LEVEL OF EFFORT (per individual)
For DBA inspections:
Week Activity Estimated Level of Effort 1 Inspection preparation at regional office 44 hours5.092593e-4 days <br />0.0122 hours <br />7.275132e-5 weeks <br />1.6742e-5 months <br /> 2 On-site inspection 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> 3 Home office inspection 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> 4 On-site inspection 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> 5 Documentation of inspection results 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> Assume additional 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of initial home office training requirements for new engineering inspection specialists that have not had previous licensee site access with the NRC. For engineering inspection specialist employed in past DBA inspections, assume 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> annually for training in their home office.
Hours may be revised, such as for additional hours to document significant inspection findings. The proposal should include an additional 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> priced at an average rate. These additional hours will be assigned to inspections as needed, by the Technical Contracting Officer Representative.
10.0 MEETINGS AND TRAVEL One 5-day trip to region Two 5-day trips to plant site for each DBA.
Above travel estimate is per individual and may be adjusted for holidays. The contractors shall coordinate all travel arrangements in advance with the RTL. Off-normal travel time may be required to ensure timely arrival at the site, as scheduled by RTL.
11.0 NRC FURNISHED MATERIAL Documents required to prepare for the inspection will be provided by RTLs.
12.0 OTHER APPLICABLE INFORMATION The inspection work specified in this SOW is 100% licensee fee recoverable. The contractor shall provide fee recovery information in the monthly progress reports in accordance with the requirements of the basic contract.
Training and any generic costs (e.g., drug testing) will be specified as non-fee billable costs.
Page 9 of 26
SECTION D - PACKING AND MARKING D.1 NRCD020 BRANDING The Contractor is required to use the statement below in any publications, presentations, articles, products, or materials funded under this contract task order, to the extent practical, in order to provide NRC with recognition for its involvement in and contribution to the project. If the work performed is funded entirely with NRC funds, then the contractor must acknowledge that information in its documentation/presentation. Work Supported by the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Reactor Regulation, under Contract task order number 31310018D0011 / 31310018F0129.
(End of Clause)
D.2 NRCD010 PACKAGING AND MARKING (a) The Contractor shall package material for shipment to the NRC in such a manner that will ensure acceptance by common carrier and safe delivery at destination. Containers and closures shall comply with the Surface Transportation Board, Uniform Freight Classification Rules, or regulations of other carriers as applicable to the mode of transportation.
(b) On the front of the package, the Contractor shall clearly identify the contract number under which the product is being provided.
(c) Additional packaging and/or marking requirements are as follows: None.
(End of Clause)
Page 10 of 26
SECTION E - INSPECTION AND ACCEPTANCE E.1 CONTRACTING OFFICERS REPRESENTATIVE (COR) AUTHORITY
- 1. The COR for this task order is:
Mr.
Office: Office of Nuclear Reactor Regulation Mailstop:
Rockville, MD 20852 Phone:
Email:
- 2. Performance of the work under this task order is subject to the technical direction of the NRC COR.
The term "technical direction" is defined to include the following:
- i. Technical direction to the contractor which shifts work emphasis between areas of work or tasks, authorizes travel which was unanticipated in the Schedule (i.e., travel not contemplated in the Performance Work Statement (PWS) or changes to specific travel identified in the PWS), fills in details, or otherwise serves to accomplish the contractual PWS.
ii. Provide advice and guidance to the contractor in the preparation of drawings, specifications, or technical portions of the work description.
iii. Review and, where required by the task order contract, approval of technical reports, drawings, specifications, and technical information to be delivered by the contractor to the Government under the contract.
- 3. Technical direction must be within the general statement of work stated in the task order. The COR does not have the authority to and may not issue any technical direction which:
- i. Constitutes an assignment of work outside the general scope of the contract.
ii. Constitutes a change as defined in the "Changes" clause of this contract.
iii. In any way causes an increase or decrease in the total estimated contract cost, the fixed fee, if any, or the time required for contract performance.
iv. Changes any of the expressed terms, conditions, or specifications of the contract.
Page 11 of 26
- v. Terminates the contract, settles any claim or dispute arising under the contract, or issues any unilateral directive whatever.
- 4. Technical directions must be issued in writing by the COR or must be confirmed by the COR in writing within ten (10) working days after verbal issuance. A copy of the written direction must be furnished to the Contracting Officer. A copy of NRC Form 445, Request for Approval of Official Foreign Travel, which has received final approval from the NRC must be furnished to the Contracting Officer.
- 5. The contractor shall proceed promptly with the performance of technical directions duly issued by the COR in the manner prescribed by this clause and within the COR's authority under the provisions of this clause.
- 6. If, in the opinion of the contractor, any instruction or direction issued by the COR is within one of the categories as defined in paragraph (c) of this section, the contractor may not proceed but shall notify the Contracting Officer in writing within five (5) working days after the receipt of any instruction or direction and shall request the Contracting Officer to modify the contract accordingly.
Upon receiving the notification from the contractor, the Contracting Officer shall issue an appropriate contract modification or advise the contractor in writing that, in the Contracting Officer's opinion, the technical direction is within the scope of this article and does not constitute a change under the "Changes" clause.
- 7. Any unauthorized commitment or direction issued by the COR may result in an unnecessary delay in the contractor's performance and may even result in the contractor expending funds for unallowable costs under the contract.
- 8. A failure of the parties to agree upon the nature of the instruction or direction or upon the contract action to be taken with respect thereto is subject to 52.233-1, Disputes.
- 9. In addition to providing technical direction as defined in paragraph (b) of the section, the COR shall:
- a. Monitor the contractor's technical progress, including surveillance and assessment of performance, and recommend to the Contracting Officer changes in requirements.
- b. Assist the contractor in the resolution of technical problems encountered during performance.
- c. Review all costs requested for reimbursement by the contractor and submit to the Contracting Officer recommendations for approval, disapproval, or suspension of payment for supplies and services required under this contract.
- d. Assist the contractor in obtaining the badges for the contractor personnel.
Page 12 of 26
- e. Immediately notify the Security Branch, Division of Facilities and Security (SB/DFS) (via e-mail) when a contractor employee no longer requires access authorization and return of any NRC issued badge to SB/DFS within three days after their termination.
- f. Ensure that all contractor employees that require access to classified Restricted Data or National Security Information or matter, access to sensitive unclassified information (Safeguards, Official Use Only, and Proprietary information) access to sensitive IT systems or data, unescorted access to NRC controlled buildings/space, or unescorted access to protected and vital areas of nuclear power plants receive approval of SB/DFS prior to access in accordance with Management Directive and Handbook 12.3.
- g. For contracts for the design, development, maintenance or operation of Privacy Act Systems of Records, obtain from the contractor as part of closeout procedures, written certification that the contractor has returned to NRC, transferred to the successor contractor, or destroyed at the end of the contract in accordance with instructions provided by the NRC Systems Manager for Privacy Act Systems of Records, all records (electronic or paper) which were created, compiled, obtained or maintained under the contract.
Page 13 of 26
SECTION F - DELIVERIES OR PERFORMANCE F.1 NRCF010 PLACE OF DELIVERY-REPORTS The items to be furnished hereunder shall be delivered, with all charges paid by the Contractor, to:
- a. Name:
- b. Name:
(End of Clause)
Page 14 of 26
SECTION G - CONTRACT ADMINISTRATION DATA G.1 NRCG030 ELECTRONIC PAYMENT (SEP 2014)
The Debt Collection Improvement Act of 1996 requires that all payments except IRS tax refunds be made by Electronic Funds Transfer. Payment shall be made in accordance with FAR 52.232-33, entitled "Payment by Electronic Funds- Central Contractor Registration".
To receive payment, the contractor shall prepare invoices in accordance with NRC's Billing Instructions.
Claims shall be submitted on the payee's letterhead, invoice, or on the Government's Standard Form 1034, "Public Voucher for Purchases and Services Other than Personal," and Standard Form 1035, "Public Voucher for Purchases Other than Personal - Continuation Sheet." The preferred method of submitting invoices is electronically to the Department of the Interior at NRCPayments@nrc.gov. If the contractor submits a hard copy of the invoice, it shall be submitted to the following address:
NRC Payments U.S. Nuclear Regulatory Commission One White Flint North Mailstop O3-E17A 11555 Rockville Pike Rockville, MD 20852-2738 (End of Clause)
G.2 USE OF AUTOMATED CLEARING HOUSE (ACH) ELECTRONIC PAYMENT/REMITTANCE ADDRESS (AUG 2011)
The Debt Collection Improvement Act of 1996 requires that all Federal payments except IRS tax refunds be made by Electronic Funds Transfer. lt is the policy of the Nuclear Regulatory Commission to pay government vendors by the Automated Clearing House (ACH) electronic funds transfer payment system.
Item 15C of the Standard Form 33 may be disregarded.
Page 15 of 26
depleting, recycled content, and non-toxic or less toxic alternatives, to the maximum extent practicable in meeting NRC contractual requirements.
(b) See NRCs Green Purchasing Plan (GPP) at:
http://pbadupws.nrc.gov/docs/ML1219//ML12191A130.pdf and the General Service Administrations (GSA) Green Procurement Compilation at:
http://www.gsa.gov/portal/content/198257.
(c) The contractor shall flow down this clause into all subcontracts and other agreements that relate to performance of this contract/order.
(End of Clause)
H.3 NRCH410 WHISTLEBLOWER PROTECTION FOR NRC CONTRACTOR AND SUBCONTRACTOR EMPLOYEES (a) The U.S. Nuclear Regulatory Commission (NRC) contractor and its subcontractor are subject to the Whistleblower Employee Protection public law provisions as codified at 42 U.S.C.
5851. NRC contractor(s) and subcontractor(s) shall comply with the requirements of this Whistleblower Employee Protection law, and the implementing regulations of the NRC and the Department of Labor (DOL). See, for example, DOL Procedures on Handling Complaints at 29 C.F.R. Part 24 concerning the employer obligations, prohibited acts, DOL procedures and the requirement for prominent posting of notice of Employee Rights at Appendix A to Part 24 entitled: Your rights Under the Energy Reorganization Act.
(b) Under this Whistleblower Employee Protection law, as implemented by regulations, NRC contractor and subcontractor employees are protected from discharge, reprisal, threats, intimidation, coercion, blacklisting or other employment discrimination practices with respect to compensation, terms, conditions or privileges of their employment because the contractor or subcontractor employee(s) has provided notice to the employer, refused to engage in unlawful practices, assisted in proceedings or testified on activities concerning alleged violations of the Atomic Energy Act of 1954 (as amended) and the Energy Reorganization Act of 1974 (as amended).
(c) The contractor shall insert this or the substance of this clause in any subcontracts involving work performed under this contract.
(End of Clause)
H.4 NRCH400 SECURITY REQUIREMENTS RELATING TO THE PRODUCTION OF REPORT(S)
OR THE PUBLICATION OF RESULTS UNDER CONTRACTS, AGREEMENTS, AND GRANTS Review and Approval of Reports (a) Reporting Requirements. The contractor/grantee shall comply with the terms and conditions of the contract/grant regarding the contents of the draft and final report, summaries, data, and related documents, to include correcting, deleting, editing, revising, modifying, formatting, and supplementing any of the information contained therein, at no additional cost to the NRC. Performance under the Page 17 of 26
contract/grant will not be deemed accepted or completed until it complies with the NRCs directions.
The reports, summaries, data, and related documents will be considered draft until approved by the NRC. The contractor/grantee agrees that the direction, determinations, and decisions on approval or disapproval of reports, summaries, data, and related documents created under this contract/grant remain solely within the discretion of the NRC.
(b) Publication of Results. Prior to any dissemination, display, publication, or release of articles, reports, summaries, data, or related documents developed under the contract/grant, the contractor/grantee shall submit them to the NRC for review and approval. The contractor/grantee shall not release, disseminate, display or publish articles, reports, summaries, data, and related documents, or the contents therein, that have not been reviewed and approved by the NRC for release, display, dissemination or publication. The contractor/grantee agrees to conspicuously place any disclaimers, markings or notices, directed by the NRC, on any articles, reports, summaries, data, and related documents that the contractor/grantee intends to release, display, disseminate or publish to other persons, the public, or any other entities. The contractor/grantee agrees, and grants, a royalty-free, nonexclusive, irrevocable worldwide license to the government, to use, reproduce, modify, distribute, prepare derivative works, release, display or disclose the articles, reports, summaries, data, and related documents developed under the contract/grant, for any governmental purpose and to have or authorize others to do so.
(c) Identification/Marking of Sensitive Unclassified Non-Safeguards Information (SUNSI) and Safeguards Information (SGI). The decision, determination, or direction by the NRC that information possessed, formulated or produced by the contractor/grantee constitutes SUNSI or SGI is solely within the authority and discretion of the NRC. In performing the contract/grant, the contractor/grantee shall clearly mark SUNSI and SGI, to include for example, OUO-Allegation Information or OUO-Security Related Information on any reports, documents, designs, data, materials, and written information, as directed by the NRC. In addition to marking the information as directed by the NRC, the contractor shall use the applicable NRC cover sheet (e.g., NRC Form 461 Safeguards Information) in maintaining these records and documents. The contractor/grantee shall ensure that SUNSI and SGI is handled, maintained and protected from unauthorized disclosure, consistent with NRC policies and directions. The contractor/grantee shall comply with the requirements to mark, maintain, and protect all information, including documents, summaries, reports, data, designs, and materials in accordance with the provisions of Section 147 of the Atomic Energy Act of 1954 as amended, its implementing regulations (10 CFR 73.21), Sensitive Unclassified Non-Safeguards and Safeguards Information policies, and NRC Management Directives and Handbooks 12.5, 12.6 and 12.7.
(d) Remedies. In addition to any civil, criminal, and contractual remedies available under the applicable laws and regulations, failure to comply with the above provisions, and/or NRC directions, may result in suspension, withholding, or offsetting of any payments invoiced or claimed by the contractor/grantee.
(e) Flowdown. If the contractor/grantee intends to enter into any subcontracts or other agreements to perform this contract/grant, the contractor/grantee shall include all of the above provisions in any subcontracts or agreements.
(End of Clause)
Page 18 of 26