NRR E-mail Capture - Quad Cities LAR to Adopt TSTF-542
ML18254A430
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 09/11/2018
From: Kimberly Green
Plant Licensing Branch III
To: Mathews M, Steinman R
Exelon Generation Co
Green K
References
L-2018-LLA-0049
Download: ML18254A430 (2)


Text

NRR-DMPSPEm Resource From: Green, Kimberly Sent: Tuesday, September 11, 2018 7:04 AM To: Steinman, Rebecca L:(GenCo-Nuc); Mathews, Mitchel A:(GenCo-Nuc)

Subject:

Quad Cities LAR to Adopt TSTF-542 (EPID L-2018-LLA-0049)

Rebecca and Mitch, The NRC staff has completed its initial review of the Quad Cities license amendment request (LAR) to adopt TSTF-542 (ADAMS Accession No. ML18057B125) and has determined that a request for additional information is not needed at this time. However, during the review, the staff identified two typo/editorial errors that it believes should be corrected. The two errors are listed below:

1. Quad Cities Nuclear Power Station, Units 1 and 2 (QCNPS), Technical Specification (TS) Limiting Condition for Operation (LCO) 3.5.2, Action C, currently states: Two required ECCS injection/spray subsystems inoperable. and has two required action statements, C.1 and C.2, with associated completion times. Attachment 2 to the LAR contains the redline/strikeout version of the proposed changes to the QCNPS TSs. However, for LCO 3.5.2, Action C, Exelon does not show the current Action C with a strikeout. Only a redline of the proposed new Action C is provided. The current Action C should be shown with a strikeout so that its clear that it is being deleted and replaced with the proposed new Action C.
2. In Attachment 2 to the LAR, proposed Surveillance Requirement (SR) 3.5.2.4 states: Verify for the required ECCS injection/spray subsystem each manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

However, TSTF-542 proposes that the SR include commas after Verify and between subsystem and each as follows:

Verify, for the required ECCS injection/spray subsystem, each manual, power operated, and automatic valve in the flow path Please consider the above corrections and supplement the LAR, as appropriate.

Please let me know if you have any questions.

Kimberly Green (301) 415-1627 kimberly.green@nrc.gov 1

Hearing Identifier: NRR_DMPS Email Number: 557 Mail Envelope Properties (Kimberly.Green@nrc.gov20180911070400)

Subject:

Quad Cities LAR to Adopt TSTF-542 (EPID L-2018-LLA-0049)

Sent Date: 9/11/2018 7:04:10 AM Received Date: 9/11/2018 7:04:00 AM From: Green, Kimberly Created By: Kimberly.Green@nrc.gov Recipients:

"Steinman, Rebecca L:(GenCo-Nuc)" <Rebecca.Steinman@exeloncorp.com>

Tracking Status: None "Mathews, Mitchel A:(GenCo-Nuc)" <Mitchel.Mathews@exeloncorp.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1894 9/11/2018 7:04:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: