1 HQ-OWFN-04B06 May 18,2018 NRC Digital I&C IAP MP3 Industry Oversight of SIL Process Warren Odess-Gillett Nuclear Energy Institute Washington, DC
2
- Topics to be covered
- Industry Oversight of Consistent Application of the SIL Certification Process
EPRI Research on SIL Certification Process 3
- Will describe the SIL certification process
- Will quantify the efficacy of the SIL certification process
- Will provide sufficient information for the NRC to evaluate the equivalence of this process with a commercial grade survey for EPRI TR 106439 dependability critical characteristics
Industry Oversight of SIL Certification Process 4
- NEI 17-06, Section 5 provides a plan for industry to oversee the SIL certification process for effectiveness and consistency in application
- NEI will monitor any proposed changes to IEC 61508 against the EPRI TR 106439 dependability critical characteristics
- NEI will communicate any adverse changes to be fixed in IEC 61508 to the IEC before the revision is published
- If unsuccessful then NEI will inform the NRC and communicate a set of compensating measures to resolve the condition
Industry Oversight of SIL Certification Process 5
- NEI 17-06, Section 5 plan (continued)
- Initially on a 3 year interval
- Consistent with the guidance in NRC Regulatory Guides 1.28 and 1.144 for auditing 10 CFR 50 Appendix B suppliers
- Possibly reduce the frequency if it is observed that the process is demonstrably consistent
- NRC may request to participate in observations
Summary 6
- From the EPRI research NRC evaluates the equivalence of the SIL certification process to a commercial grade survey per EPRI TR 106439
- NEI monitors IEC 61508 for any adverse changes