Structural reconciliation discussion points for public meeting on Oct 1, 2018 The staff would like SNC to address the following reconciliation topics during the Oct 1 public meeting:
- 1. How are the changes in loads & configuration to structures tracked and processed into the design reconciliation process as mentioned in the ITAAC acceptance criteria (preferably walk through a completed or in-process example).
- 2. Explain the content and provide a high level outline (what can we expect to see) of the design report that will be developed in support of the reconciliation report.
- 3. Discuss the actions that will be undertaken by SNC to meet license conditions 2D12(g)1; 2D12(g)2; and 2D(13) during the reconciliation process to close out ITAAC.
- 4. When, relative to the scheduled fuel load date, is the reconciliation report expected to be made available to the NRC staff for review?
Structural Reconciliation ITAAC: