UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. KING OF PRUSSIA, PA 19406-2713 Matt Norton Principal Decontamination Decommissioning and Environmental Services 345 North Avenue, 2nd Floor Wakefield, MA 01880 August 23, 2018
SUBJECT:
STATUS OF NRC'S REVIEW OF DECONTAMINATION DECOMMISSIONING AND ENVIRONMENTAL SERVICES' CLEANUP PLAN FOR THE FORMER NEW HAVEN CLOCK FACTORY SITE IN NEW HAVEN, CONNECTICUT
Dear Mr. Norton:
This letter is to inform you that we have completed our review of your Cleanup Plan dated March 23, 2017, [Agencywide Documents Access and Management System (ADAMS) Accession Number ML 17144A307]
for the former New Haven Clock Factory site in New Haven, Connecticut.
We used NUREG-1757, Volume 2, Revision 1, "Consolidated Decommissioning Guidance:
Characterization, Survey, and Determination of Radiological Criteria" dated September 2006, to evaluate dose modeling, focusing on the general conceptual model, screening methodology, and ALARA analysis.
The results of our review revealed that the proposed Derived Concentration Guideline Levels (DCGLs) are sufficiently conservative and will be protective of public health and safety provided that you provide an adequate technical basis confirming that residual radioactivity will be surficial and not volumetric.
We have informed the State of Connecticut Department of Energy and Environmental Protection (DEEP) of the results of our review. Based on our review and the assumption that residual radioactivity will be surficial and not volumetric, the NRC has no further questions and expects that you will continue with your activities at the site. In addition, we noted that your Final Status Survey Plan (FSSP) is in Appendix B of your Cleanup Plan. You should review your FSSP to determine if any changes are required as a result of your remediation activities.
We request that you submit any changes made to your FSSP for NRC review prior to implementation.
We understand that, as of July 10, 2018, the property owner is Taom Heritage New Haven, LLC, rather than TSJ Inc. and Mr. Yagovane, as stated in Sections 1.2 and 2.1 of the Cleanup Plan and Section 2.0 of the Final Status Survey Plan.
M. Norton 2 If you need any additional information or assistance, please contact Laurie A. Kauffman at (610) 337-5323.
Thank you for your cooperation.
Docket No. 15000020 Sincerely, Raymond J. Powell, Chief Decommissioning, ISFSI, and Reactor HP Branch Division of Nuclear Materials Safety 03038975 (former New Haven) cc: State of Connecticut M. Norton 2 If you need any additional information or assistance, please contact Laurie A. Kauffman at (610) 337-5323.
Thank you for your cooperation.
Docket No. 15000020 Sincerely, I fZfr/ Raymond J. Powell, Chief Decommissioning, ISFSI, and Reactor HP Branch Division of Nuclear Materials Safety 03038975 (former New Haven) cc: State of Connecticut DOCUMENT NAME: G:\WordDocs\Current\Misc Letter\L03038975.NewHavenClock-DDES acceptance letter.docx ADAMS ACCESSION NUMBER: 0 SUNS! Review 0 Non-Sensitive 0 Publicly Available D Sensitive D Non-Publicly Available OFFICE RI/DNMS RI/DNMS /) NAME LKauffman/lak RPowell/ {::-I DATE 08/16/2018 08f,i2018
-OFFICIAL RECORD COPY