Environmental Protection Industries, Inc., Response to the Apparent Violation in Report No. 15000012/2018002 (Dnms); EA-18-099
ML18235A265
Person / Time
Site: 15000012
Issue date: 08/21/2018
From: Mankowski R, Meilman S
Environmental Protection Industries
To: Christine Lipa
NRC/RGN-III
References
EA-18-099
Download: ML18235A265 (3)


See also: IR 05000012/2018002

Text

ENVIRONMENTAL

PROTECTION

INDUSTRIES

August 21, 2018 Ms. Christine

A. Lipa, Acting Director Division of Nuclear Materials

Safety US NRC -Region III 2443 Warrenville

Road, Suite 210 Lisle, Illinois 60532 RE: Response to the Apparent Violation

in Report No. 15999912/2018(DNMS)

NRC Special Inspection

Report EA-18-009 Dear Ms. Lipa: Environmental

Protection

Industries (EPI) respectfully

submits this letter to document Corre ctive Actions and steps taken for the above referenced

Violation

of Title 10 CFR 150.20(b)(l).

Correc ti ve Actions we re taken immediately

upon notification

on Thursday, July 5 , 2018 , and EPI suspended

work (utilizing

a nuclear density gauge) in Indiana. EPI has not resumed any operations

involving

the use of a nuclear density gauge in the State of Indiana , and will not unt i l this matter is fully resolved.

The NRC Special Inspection

Report was posted outside of t he secure storage area a nd on the Employee Notice Board in the EPI l unch room o n the da y the NRC Special Inspection

Report was received. The reason for the violation , corrective

actions and compliance

date are outlined below. 1 Reason for Appar ent Violation

At the time of the Violation, EPI was unaware that Indiana is a " Non-Agreement

State." EPI was under an erroneous

assumption

that due to the licensure

from the State of Illinois , our actions fall under an umbrella of IEMA. 2 Corrective

Actions Use of the Nuclear Density Gauge in Indiana was suspended

immediately

upon notification

of the Title 10 CFR 150.20(b)(l) regulations

and violation, as per NRC phone call on Thursday, July 5;2018. EPI immediately

filed NRC Form 241 (July 9, 2018) for cale ndar year 2018 , which was hand-delivered

to NRC's office on Monday, July 9, 2018, along with an appropriate

fee for the above. EPI provided the NRC with all date s and locations

of unauthorized

portable nuclear density gauge use in Indiana in 2018. This information

was e-mailed to NRC on Monday, July 9 , 2018. EPI has identified

all nearby Non-Agreement

Sta tes, and the EPI RSO has researched , reviewed and studied the applicable

Title 10 Regulations

and Reciprocity.

E PI realizes that the noted form and fee are only applicable

to calendar year 2018. A new form will be filed , as necessary, in 2019. 3 Corrective

Steps The Corrective

Actions taken will prevent future violations. EPI realizes its mistake in licensure

agreement

assumption

w i th different

States. EPI had four telephone

conversations

with NRC representative, at which time our corrective

actions were outlined. En v ironmenta l Engineering

  • A s sessment * Remediation
  • Brownfield

Redevelopment

  • Construction

Management

Corporate

Office 16650 South Cana l * South Holland , I L 60473 * tx 1.800.526.1788 * fax 1.708.225.1117 * office 1.708.225.1115 website: www.envlronmental-epi.com

E N V I RON ME NTA L PROTECTION

INDUSTRIES

4 Compliance

Date Monday, July 9, 2018. EPI apologizes

for any inconvenience

that our actions may have caused, and assures NRC that this will not happen aga in. Should you have any question, please do not hesitate to contact us. o eilman, PE, RSO irector of Operations

Vice President-Technical

Services Environmenta

l Engineering

  • Assessment
  • Remediation
  • Brownfield

Redevelopment

  • Construction

Management

Corporate

Office 16650 South Cana l * South Holland , IL 60473 * tx 1.800.526.1788 * fax 1.708.225.11 1 7 * office 1.708.225.1115 website: www.environmental-epi.com

R3 Reciprocity

From: Sent: Sergio Meilman <smeilman@environmental-ep

i.com> Wednesday, August 22 , 2018 1 :27 PM To: R3 Reciprocity

Cc: 'Robert Mankowski';

'Michael Musa' Subject: [External_Sender

] Environmental

Protection

Industries

-NRG Special Inspections

I nspection

report Attachments:

scanner@environmental-epi.com_20

1 80822_ 121250: pdf Dear Ms. Lipa and Mr. O'Dowd: As per our conversation, enclosed please find a letter of explanation

of an apparent violation. EPI deeply regrets this non-compliance.

Corrective

actions had been implemented

immediately

upon NRC's notification , and were discussed

in detail with NRC's representative.

EPI is l ooking forward to a full resolution

of this matter. Thank you again -please feel free to call me anytime if you have additional

questions

or comments. Thank you again Sergio Meilman, P.E., Ph.D., RSO Director of Operations

Environmental

Protection

Industries

16650 S Canal Street South Holland, IL 60473 Phone: 708-225-1115

Fax: 708-225-1117

Cell: 312-354-0627

smeilman@environmental-epi

.com www.environmental-epi.com

1