ML18233A408

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedudocket No. 50-298, License No. DPR-46
ML18233A408
Person / Time
Site: Cooper 
(DPR-046)
Issue date: 08/13/2018
From: Shaw J
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2018042
Download: ML18233A408 (1)


Text

,/

H Nebraska Public Power District NLS2018042 August 13, 2018 Always there when you need us U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, License No. DPR-46

Dear Sir or Madam:

50.54(q)

The purpose of this letter is to report a change to Emergency Plan Implementing Procedure (EPIP) 5.7.6, Notification (Revision 74), and provide a summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP.

This letter contains no commitments. If you have any questions regarding this submittal, please contact me at (402) 825-2788.

Sincerelya

,,,,-'#( '~

im Shaw Licensing Manager

/bk

Attachment:

Report of Change and Summary of 50.54( q) Analysis Emergency Plan Implementing Procedure 5.7.6, Revision 74

Enclosure:

Emergency Plan Implementing Procedure 5.7.6, Revision 74 cc:

Regional Administrator, w/ attachment and enclosure (2)

USNRC - Region IV Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/ attachment ( enclosure per controlled document distribution)

USNRC-CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, w/ attachment and w/o enclosure COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com