ML18228A466

From kanterella
Jump to navigation Jump to search
Letter Schedule for Response to NRC Staffs Positions on Fire Protection Administrative Controls
ML18228A466
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/03/1978
From: Robert E. Uhrig
Florida Power & Light Co
To: Schwencer A
Office of Nuclear Reactor Regulation
References
Download: ML18228A466 (4)


Text

g rofyg 0 REGULATORY INFORMATION DISTRIBUTION SYSTFM (RIDS >

DISTRIBUTION FOR INCOMING MATERIAL

-250 51 REC:

SCHWENCER A ORG:

UHRIG R E DOCDATE: 08/03/78 NRC FL PWR 4 LIGHT DATE RCVD: 08/09/78 DOCTYPE:

LETTER NOTARIZED:

NO COPIES RECEIVED

SUBJECT:

LTR 3 ENCL 0 ADVISING RESPONSE TO NRC REQUEST OF 06/30/78 TO TAFF'+ POSITIONS ON FIRE PROTECTION ADMINISTRATIVECONTROLS WILL/PROVIDED BY THE END OF AUGUSTA 1978.

PLANT NAMF: TURKEY PT N3 REVIEWER INITIAL:

XJM TURKEY PT 04 DISTRIBUTER INITIAL:

44+444+<<44+444+44~

DISTRIBUTION OF THIS MATERIAL'S AS FOLLOWS FIRE PROTECTION INFORMATION <AFTER ISSUANCE OF OL).

(DISTRIBUTION CODE A006)

FOR ACTION:

INTERNAL:

EXTERNAL:

BR CHIEF ORBel BC~~LTR ONLY(4)

EG FILE+

TR ONLY(i) 1 h

~ TR ONLY(2)

AUXILIARYSYS BR~+LTR ONLY(2 >

PLANT YSTFMS BR4H~LTR ONLY(5)

R.

MURANKA+4ILTR ONLY(1 LPDR S MIAMI FL44LTR ONLY(i)

TERA4I4LTR ONLY(l>

'SIC+4~I TR ONLY< 1)

ACRS CAT B4~~~LTR ONLY(16)

NRC PDR~4.LTR ONLY(1 >

OELD~~~LTR ONLY< 1)

AD FOR SYS 8.

PRO J>%LTR ONLY,( 1 >

WAMBACH+4LTR ONLY< 1)

HANAUER+~LTR ONLY(l)

DlSTRIBUTION:

SIZE:

iP LTR 39 ENCL 0 CONTROL NBR:

782220113 THE END eel

0 lU 1f' i

I'

FLORIDAPOWER 8 LIGHTCOMPANY August 3, 1978 L-78-256 WW Office of Nuclear Reactor Regulation Attention:

Mr. A. Schwencer, Chief Operating Reactors Branch 41 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Schwencer:

fW W

(W W

W Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Fire Protection Administrative Controls Your letter dated June 30, 1978 requested our response to the staff's positions on fire protection administrative controls within 30 days.

We have found that we will require a longer time in order to develop coordinated fire protection admin-istrative controls at our Turkey Point and St.

Lucie nuclear plants.

A similar letter from the staff on fire protection administrative controls concerning our St. Lucie plant does not require response until the end of August, 1978.

We plan to respond to your letter on Turkey Point at that time also.

Please feel free to call me should you have any question in this regard.

Very trul

yours, Robert E. Uhrig Vice President REU:GDW:pit cc:

Mr. James P. O'Reilly, Region II Robert Lowenstein, Esquire

, gj(j'w gIg'ijou g 4~(J J

>82220Zi3 PEOPLE... SERVING PEOPLE

~ g I T