ML18228A446
| ML18228A446 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/03/1978 |
| From: | Robert E. Uhrig Florida Power & Light Co |
| To: | O'Reilly J NRC/IE, NRC/RGN-II |
| References | |
| Download: ML18228A446 (6) | |
Text
r&>>i<</~
REGULATORY IN 4ATION DISTRIBUTION SYSTEt RIDS)
- DISTRIBUTION FOR INCONING NATERIAL 0-25 25i REC:
OREILLY J P
ORG:
UHRIG R E DOCDATE: 03/03/78 NRC FL PWR 8c LIGHT DATE RCVD: 03/14/78 DOCTYPE:
LETTER NOTARIZED:
NO
SUBJECT:
ANNUAL OPERATING REPT FOR UNITS 3 5 4.
COPIES RECEIVED LTR i ENCL PLANT MANE: TURKEY PT 03 TURKEY PT 03 REVIEWER INITIAL:
X I
DISTRIBUTER INITIAL:
++wo+++++++++++++ DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ANNUAL 8. SENI-ANNUAL OPERATING REPORTS (OL STAGE).
(DISTRIBUTION CODE A008)
FOR ACTION:
INTERNAL:
EXTERNAL:
P
%k GRO HUIS+4W/ENCL F ILES +W/EN I
8.
HANAUER44W/ENCL EISENHUT++W/ENCL BAER4+W/ENCL GRINES++W/ENCL J.
COLLINS~4W/ENCL LPDR S
NIANIi FL++W/ENCI NATL LAB ORNL4~+W/ENCL TIC++W/ENCL NSIC+4 W/ENCL ACRS CAT B++W/i5 ENCL LIC ASST PARRISH+<W/5 ENCL NRC PDR++W/ENCL NIPC+>W/2 ENCL STELLO<+W/ENCL SHAO>+W/ENCL BUTLER++W/ENCL P.
CHECK++A/ENCL DISTRIBUTION:
LTR 4i ENCL 4i SIZE:
iP+iP CONTROL NBR:
780750044 THE END
1o I>
e I
0 I;
'll
FLORIDAPOWER 8c LIGHT COMPANY March 3, 1978 j-78-86 Mr. James P. O'Reilly, Direct:or, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 230 Peachtree
- Street, N. W., Suite 1217 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
Re:
Turkey Point Units 3 and 4
Docket: Nos.
50-250 and SO-Z51
~
1977 Annual 0 eratin Re ort Two copies of the 1977 Turkey Point Annual Operating Report are attached.
Thi's report is submitted in compliance.with Technical Specification 6.9.l.b.
Very truly yours,
~
Robert E. Uhrig Vice President REU/MAS/ms Attachment cc:
Director, Office of Inspection and Enforcement (40)
.Director, Office of Management, Information and Program Control (2)
Robert Lowenstein, Esquire 7eorSOOee
,0<
PEOPLE... SERVING PEOPLE
FLORIDA POWER 6 LIGHT COMPANY PLANT LOCATION: TURKEY POINT PLANT WORK 6 JOB FUNCTIO REACTOR OPERATIONS 6 SURVEILLANCE MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PllYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL ROUTINE MAINTENANCE MAINTENANCE PFRSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL EhtGINEERING PERSONNEL 22.44 0.00 0.00 0.00 0.00 4.26 0.00 25.48 4.78 0.00 3.58 55.96 2.73 0.00 3
0 26 4
0 28 0
0 0
0 9
54 9
0 4
12.38 156.64 0.00 0.00 0.00 0.00 398.14 8.56 2.44 5.42 3.32 72 0
0 4
0 55.30 0.00 0.00 4;86
'.00 86 0
0 0
0 175 7
5 3
4 STANDARD FORMAT FOR REPORTING NUMBER OF PERSONNEL AND MAN-REM FOR WORK AND JOB FUNCTION NUMBER OF PERSONNEL
(> 100 MREM)
TOTAL MAN"REM
- CONTRACT WORKERS CONTRACT WORKERS N
STATXON UTILITY AND OTHERS STATXON UTILITY AND OTHERS INSERVICE INSPECTION MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL EiNGINEERING PERSONNEL SPECIAL MAINTENANCE MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL 0,
0 0
0 13 2
0 0
0 6
0 0
0 0
0 0
0.
0 0
0 254 0
0 3
0 48 0
0 0
0.00 24.48 0.00 0.00 0.24 0.00 0.00 0.00 3.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 601.78 0.00 0.00, 8.32 0.00 29.02 0.00 0.00 0.00 0.00 WASTE PROCESSING MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL REFUELING 1'!AINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL TOTAL MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGXNEERING PERSONNEL GRAND TOTAL 12 0
0 0
9 198 63 17 3
36 317 0'0 0
0 0
0 0
'"0 0
0 114
~ 0 0
0 114 0
0 0
0 0
377 0
26 11 0
- 0. 00 0.42 1.64 0.00 0.00 11.76 0.00 0.00 0.00 8.72 413.72 64.94 9.54 5.42 52.02 545.64 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 179.08 0.00 0.00 0.00
'0.00 179.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 690.36 0.00 25.48 17,96 0.00 733.80