ML18227D807

From kanterella
Jump to navigation Jump to search
Letter Revisions to Environmental Technical Specifications
ML18227D807
Person / Time
Site: Turkey Point  
Issue date: 02/28/1978
From: Robert E. Uhrig
Florida Power & Light Co
To: Stello V
Office of Nuclear Reactor Regulation
References
L-78-72
Download: ML18227D807 (4)


Text

(>>

a' REGULATORY INFOhs ATION DISTRIBUTION SYSTEM IDS)

DISTRIBUTION FOR INCOMING MATERIAL 50-'7

/251 REC:

STELLO V NRC ORG:

UHRIG R E

FL PWR 5 LIGHT DOCDATE: 02/28/78 DATE RCVD: 03/06/78 DOCTYPE:

LETTER NOTARIZED:

YES COPIES RECEIVED

SUBJECT:

LTR 3 ENCL 40 AMEND LICENSES DPR-31 AND DPR-41)

CHANGE TO ENVIRON TECH SPECS CONSISTING OF REVISIONS RE MONITORING REQUIREMENTS SUPPLEMENTAL INFO NOTARIZED 2/28/78.

PLANT NAME: TURKEY PT 03 TURKEY PT 03 REVIEWER INITIAL:

XEF DISTRIBUTER INITIAL:

DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS 4++44<+<+++<++++++

CHANGE REQUESTS FOR ENVIRON TECH SPECS

<APPEND 8)

(DISTRIBUTION CODE C004>

FOR ACTION:

INTERNAL:

EXTERNAL:

BR CHIEF'SCHWENCER++W/ENCL LIC l5SST

'P= RRISH++W/ENCL REG FILE~~M/EN Cc E++W'2 EACL GOSSICK 8( STAFF4+W/ENCL EISENHUT+4LTR ONLY J

MCGOUGH+4W/ENCL BALLARD>+W/ENCL J COLLINS4+W/ENCL LPDR S MIAMI, FL~~W/ENCL NATL LAB ANL++W/3 ENCL.

NSIC++W/ENCL TIC++W/1 ENCL ACRS CAT B++W/16 ENCL PRO J MGR GROTENHUIS>+W/ENCL NRC PDR++L4/ENCL OELD++W/ENCL, HELTEMES44W/ENCL B GRIMES++W/ENCL DENTON 8c MULLER<<LTR ONLY VOLLMER++LTR ONLY KREGER++W/ENCL DISTRIBUTION:

LTR 41 ENCL 38 SIZE:

1P+21P CONTROL NBR:

780650148 THE END t

'KtllltmWIttIIFE'.

O. BOX 013100, MIAMI, FL 33101 yg t

FLORIOA POWER 8( LIGHT COMPANY February 28, 1978 L-78-72 Office of Nuclear Reactor Regulation Attention:

Mr. Victor Stello, Director Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Stel 1 o:

}1,~,,

Re:

Turkey Point Plant Unit Nos.

3 and 4

Docket Nos.',50-250 and"50-251 Revisions to Environmental Technical Specifications 0 eratin Licenses DPR-31 and DPR-41

'y letters dated September 7, 1976 (L-76-323) and October 5, 1976 (L-76-350)

Florida Powe~- 5 Light Company (FPL) proposed changes to the Turkey Point Plant Environmental Technical Specifications (ETS).

Your staff has requested additional information which is enclosed as Attachment 1 and is incorporated in a revised version of 'the ETS (Attachment 2).

The revised version of the ETS (Attachment 2) includes a rewritten Section 4.0 which clear ly delineates the objective, monitoring requirements, reporting requirements, and bases for each specification.

This rewritten section retains all of the requirements of Section 4.0 as, presented previously (except changes already discussed with your staff); only the format and wording are changed in order to'improve ease of implementation and verification.

Attachment 2 includes bars in the right hand margin to indicate changes from our submittal of October 5,.'1976 as modified by our letter of February 23, 1977.

These changes have been reviewed and approved by the Florida Power 8 Light Company Environmental Review Group and Company Nuclear Review Board.

They have determined that the changes do not impact the environmental assessment of the licensed facility, and do'not affect the health and safety of the public.

Yours ri truly, Robert E. Uhrig Vice President REU:NLR:sl Attachment cc:

- J.

P. O'Reilly Robert Lowenstein, Esquire PEOPLE... SERVING PEOPLE

0 I