|
---|
Category:Letter
MONTHYEARIR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval IR 05000250/20240112024-08-0606 August 2024 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000250/2024011 and 05000251/2024011 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-117, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-112, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 2024-09-09
[Table view] |
Text
LAW OFFICES S PI EGEL 85- MCD IARMID 2SOO VIRGINIA AVENUE, N. W.
WASHINGTON. O. C. 2003T TCLCICHONK (202l 333 4500 GEORGE SPIEGEL PETER ROBERT C.
K.'ATT'ANIEL MCDIARMID'ANDRA J. GIJTTMAN J. STREBEL. SONNIS S. SLPIR ROSBRT A: JABLON JAMES N. HORWOOD JRMSS CaRL POLLOCK ALAN.J. ROTH FRANCES E. FRANCIS L'eal<
DANIEL I. DAVIDSON THOMAS N. MCHIJGH. JR )L CO
~ CRT 6'9 October. 1976 Director, Nuclear Reactor Regulation.
U.S. Nuclear, Regulatory Commission Washington, D.C., 20555 Re: Florida Power s Li ht Co. (Turke Point
'eneratin Unx.ts No. 3 and'o. 4 NRC Docket Nos. 50-250A and 50-251A; Florida Power 6 -Zi ht Co. (St.. Lucie Units No. 1 and. No. 2 , NRC .Docket Nos.. 50-335A and 50-389A Dear'ir.
The Fort Piezce Utilities Authority of .the City of Fort. Pierce, the Gainesville-Alachua County Regional Electric Water and Sewer Utilities~ the L'ake Worth Utilities Authority, the Utilities Commission of the City of New Smyrna Beach, the Orlando Utilities Commissioni the Sebring Utilities Commission, and the Cities of Alachua, Bartow, Bushnell, Chattahoochee, Daytona Beach, Fort Meade, Key West, Leesburg, Mount. Dora, New-berry, Quincy, St. Cloud, Tallahassee- and Williston, Florida, and the Florida MunicipalUtilities Association (" Florida Cities" )
enclose copies of their "Point Petition. of Florida Cities for Leave to intervene; Petition to Xntervene; and Request: for Hear-ing" and affidavits of Robert A. Jablon 1/,. Harry-C. Luff, Jr.,
and Rohert E. Bathen in s)Isport thereof I filed with the 1/ Also enclosed are copies of the Affidavits of Robert E.. Bathen, Harzy C. Luff', Jr., Robert A. Jablon, Esq., Osee R; Pagan, Esq.,
and, John W. Wilson., Ph.D., submitted in support of Florida Cities Joint. Petition to Intervene in Florida Power & Li ht Co. (South Dade Plant), NRC Docket No. P-636-A (14 Apz. 1976); which are incorporated by reference in the Supplemental Affidavit of Robert A.. Zahlon, ~su ra.
Director, Nuclear. Reactor Regulation 2 29 t
October 1976 Secretary of the Nuclear Regulatory Commission on 6. August 1976 in the above-captioned matters, and. "Reply of Florida.
Cities to Responses of Florida- Power and Light Company and Nuclear Regulatory Commission Staff," filed with the Atomic Safety and. Licensing Board on 1S October. 1976.
Because Florida Cities'ubstantive claims involve antitrust matters, they filed these pleadings with the Sec-retary, as is appropriate for pleadings involving such claims. By order issued.13 August 1976, the Nuclear Regu-.
latory Commission, established an Atomic Safety and Licens-ing Board to Rule on Petitions.
Florida Cities believe that in thus filing their petition. for intervention and requests for relief, they have.
properly placed before this Commission issues relating to their. entitlement to the relief requested. However, Florida Power 6 Light Company, in its* "Response of Florida Power and Light Company in Opposition to: Joint Petition of Florida Cities for Leave to intervene .out. of Time; Petition to Inter-vene; and Request for Hearing," 'filed. with the Board on'1 September 1976, and the Nuclear Regulatory Commission Staff, in "Answer of the NRC, Staff to the Petition to Zntervene out of Time and Request for Hearing by Certain Plorida Cities,"
filed with the Board on 17 September, 1976, have stated that Florida Cities should have sought relief through Section 2.206. of the Commission.'s Rules of Practice, 10 CFR 52.206.
Therefore, as stated in their "Reply of Plorida Cities to Responses of Florida Power a Light Company and Nuclear Re-gulatory Commission Staff" at page 23, Florida Cities hereby lodge their,Joint Petition, ~su ra, and their Reply, ~su ra, with the Office of Nuclear Reactor. Regulation..
Since Florida Cities believe they have already properly invoked this Commission s jurisdiction,. they do not request that you now initiate a proceeding separate and apart from considerations presently before the Atomic Safety and.
Licensing Board established to rule. on petitions, pending action by that Board.
Florida. Cities are, of course, prepared to cooperate
Director, t Nuclear Reactor Regulation 29 October 1976 procedurally in any way necessary to facilitate considera-tion of. this. matter.
Very truly yours, Robert A. J ion Daniel J'uttman Attorneys for the Port. Pierce Utilities Autho--
rity of the City'of Fort Pierce, the Gainesville-.
Alachua County Regional Electric Water and Sewer Utilities, the Lake Worth Utilities Authority, the Utilities Commission of the City of New Smyrna Beach, the Orlando Utilities Commission, the Sebring Utilities Commission, and the Cities of Alachua, Bartow, Bushnell, Chattahoochee, Daytona Beach, Fort Meade, Key West, Leesburg,. Mount Dora,. Newberry, Quincy, St., Cloud, Tallahassee and Williston, Florida, and'he Florida Municipal Utilities Association Enclosures cc-. '(w/out encl.). Atomic Safety and Licensing Board.
All parties