ML18227D479

From kanterella
Jump to navigation Jump to search
Letter Schedule for Response to Request for Information on Reactor Vessel Material Surveillance Program
ML18227D479
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/06/1977
From: Robert E. Uhrig
Florida Power & Light Co
To: Lear G
Office of Nuclear Reactor Regulation
References
Download: ML18227D479 (4)


Text

NRC,~M'%55 I2.7iI )

U.S. NUCLEAR REGULATORY COMMISSION OOCKET NUMBER

i 2

NRC DISTRISUTION FoR PART 50 DOCKET MATERIAL FILE NUMBER i TO::, "

G.

LEAR FRO>: FLORDIA POWER &LIGHT CP, HIAMI, FLORDIA R. E.

UHRIG OATE OF OOCUhIENT 7/6/77 OATE RECEIVPO 7/12/77 ETTE R RIG IN*L QCOPY C3 NOTOR IZ E 0 NCLASSIFIEO PROP INPUT FORM NUMBER OF COPIES RECEIVEO 3/GeE I oESCRIPTI e ~ P /~C PF 10/22/77 LTR. ADVI RE ISED DUE DATE@FOR FORWARDIN REQUESTED INFO REGARDING THE RECTOR V/SSEL MATERIAL SURVEILLANCE PROGRAM

~7

~

.O-ROT ggMOV@

ENCLOSURE r;

Ip g 4tl I I t

I T

TURKEY SAB FOR ACTION/INFORMATION ENVIRHNMENTAL CT iBulAGER:

CENSIiNG ASSISTANT:

ASSIGNED AD:

Vo HOORE LTR BRANCH CHIEF:

PROJECT K%AGER:

LICENSING ASSISTANT:

B, HARLESS INTERNALO ISTRI8UTION STEHi.S SAFETY HEINEKi4f EDER PLANT SYS~iS TEDESCO BENAROYA SITE SAFETY &

EiiIRON ANALYSIS DENTON & HULLER

~ ygm ENG INEERING IPPOLITO OPERATING REACTORS EliIRO TECH ERNST v

G BLOOD TIC

~

IP. + I CHECK AT&I ALTER<

8 TBERG EXTERNAL OISTR I8UTION NSIC B

ER GRIME GAHHILL 2

SITS ANALYSIS VOLLMER BUNCH J ~ COLLINS KREGER CONTROL NUiVI8ER

)g4 7'71 REG IV J

HANCHETT 16 CYS ACRS SEiIT CATEGO Y

4 ""r>

Lv.+r" ~i l-~

~ S.

~A

~'~

w WA FLORIOA POWER 8 LIGHT COMPANY July 6, 1977 L-77-211 Office of Nuclear Reactor Regulation Attention:

Mr. George Lear, Chief Operating Reactors Branch e3 Division of Operating Reactors U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555 I

Dear Mr. Lear:

l~l, ov r~

"<<-I<< ~~gg~~

p

<>ii ':~")Q-Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Reactor Vessel Material Information Your letter of May 20, 1977 contained a Request. for Information regarding the Reactor Vessel Material Surveillance Program at Turkey Point Units 3 and 4.

The due date was 60 days after our receipt of your letter (July 22, 1977),.;

Our NSSS vendor will be supplying us with the information and has informed us that, it will not be available by July 22.

As a result, we have established October 22, 1977 as a revised due date for forwarding the information to your office.

Please let us know if you desire further discussion of the revised due date.

Very truly yours,

~iF-gW Robert E. Uhrig Vice President REU/MAS/bb cc:

Mr. Norman C. Moseley,-Region"II Robert Lowenstein, Esquire 771930466 P EOP LE... SERVING P EOP LE