ML18227D425

From kanterella
Jump to navigation Jump to search
Transmitting Unit 4 Steam Generator Inspection Program & Request for Comments from NRC
ML18227D425
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/31/1978
From: Robert E. Uhrig
Florida Power & Light Co
To: Lear G
Office of Nuclear Reactor Regulation
References
L-78-34
Download: ML18227D425 (8)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM <RIDS)

I) ISTRIBUTION FOR I NCQMING MATERIAL 50-25i REC: LEAR G ORG: UHRIG R E DOCDATE: Oi/3i/78 NRC FL PWR 8c LIGHT DATE RCVD: 02/06/78 DQCTYPE: I FTTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 3 ENCL 3 ENCL COPY OF SUBJECT FACILITY STEAM GENERATQR INSPEC PROGRAM.

ANTICIPATED STARTING DATF IS 02/06/78.

PLANT NAME: TURKEY POINT UNIT 4 REVIEWER INITIAL: XBT DISTRIBUTOR INITIAL:

DISTRIBUTION OF THIS MATERIAL'S AS FOLLOWS GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.

< DISTRIBUTION CODE AOOi )

FOR ACTION: BRANCH CHIEF LEAR+4W/7 ENCL INTERNAL: REG FIL ++I J/ENCL NRC PDR4+W/ENCL I 8c E++W/2 ENCL OELD++LTR ONLY HANAUER++W/ENCL CHECKccccW/ENCL E I SENHUT+~c W/ENCL SHAO++W/ENCL BAER~ccW/ENCL BUTLER44W/ENCL GR I MES++A/ENCL J. COLL INS++M/ENCL J. MCGQUGH+cc W/ENCL EXTERNAL: LPDR S MIAMI FL++W/ENCL c

TIC4+W/ENCL NSIC++W/ENCL ACRS CAT 8%+II/ENC/PC, ')

DISTRIBUTION: LTR 25 'NCL~ CONTROL NBR: 780370335 SIZE: iP+2P FND

j" J -,i II

FLORIDA POWER St LIGHT COMPANY January 31, 1978 L-78-34 t

/

Office of Nuclear Reactor Regulation FEg 8 )g~

Attn: Mr. George Lear, Chief Operating Reactors Branch 43 COhfq ISS +~TO+

U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Lear:

tp Re: Turkey Point Unit g4 Docket No. 50-251 Steam Generator Ins ection Pro ram Attached for your information is a copy of the Turkey Point Unit No. 4 Steam Generator Inspection Program.

We have tentatively scheduled the inspection to begin on February 6, 1978. We therefore request that any comments you may have concerning the program be forwarded to us by that date so that we may incorporate them into the program.

Yours y truly, Robert E. Uhrig Vice President lj REU:sl Attachment cc: J. P. O'Reilly, Region II Robert. Lowenstein, Esquire 0

PEOPLE... SERVING PEOPLE

L TURKEY POINT UNIT llo. 4 Steam Generator Inspection Program Planned for February 1978

l. Eddy Current Testing of U-bends is planned as follows:

a} Steam generator C, rows 2-5, columns 1-92; unplugged tubes will be tested at 100 KHZ using beaded flex 0.540 probe.

b) Any tube(s) which give indication at 100 KHZ will be reprobed using 400 KHZ.

Hot leg tube gauging will be conducted on all three steam generators .

utilizing three different sized eddy current probes (.540 in , .610 in.,

and .650 in. diameters). The unshaded areas on the attached tube map identify the tubes to be probed.

3. Cold leg tube gauging will be conducted in steam generator C using two different sized eddy current probes (0.540 in. and 0.610 in.). The area within the dashed line on the attached tube map identifies the tubes to be probed.
4. llrapper to shell annulus measurements will be made on steam generator B.
5. Handhole inspections using TV and/or photographs will be used to inspect the flow slots and determine the extent of hourglassing on the 81 tube'support plates in steam generators A, B, and C.
6. Preventive plugging based upon the inspection results.

~ e ~ - Pp

, a I,

4 sl &sl&&elallqsm 7) Le l7lsta/i6857 Ss 535! W4'7<5'~ 4) 3937353331 29272523 21 19 17 15 1311 9 7 5 g COLUWS 2~3'" 4 74ljZ 52 Sn 4~

4w 3t 22 l2 IO Jl

~, ~ '

~

~ r I ~ I ~ ~

I I- s ~ I ~ ~ ~

rC I ~

t ~ I ~ ~ 1 32 31

~ I

~

~ S

~

I 29 27

'"'f ~

L

~

I a g I ~

~

~

I ~ I v

~

26

~

~ ~

2t

~ I

~

r ~

2 I

o ~

~

~ ~ ~ 'L Zl v ~ ~

~ ~ ~

17

~ ~ ~

15

. iT ~ "i I~~r, 13

\ ~ I t ~

I Il

~ate ~ ~

~

lO I ~

~

l

~

~ I i

i I

~

~ ~

~

~ ~

Pf

~ ~

8

~

I ~ I ~ ~

~

~~jt-

~ .. rt I ~

~ ~

6 r

~ ~

~ ~ t ~ ~ ~

I ~ ~

f ~ ~ $ I

+t 1 ~ . I I I I ~ I ~

AA'cjoy<< "

~ e r s, ~, t

'J o ~ t