Letter Furnishing Information Re Review of Steam Generator Tube Plugging Program
ML18227D380
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/23/1978
From: Robert E. Uhrig
Florida Power & Light Co
To: Stello V
Office of Nuclear Reactor Regulation
References
Download: ML18227D380 (7)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS >

DlSTRIBUTION FOR INCOMING MATERIAL 50-251 REC:

STELLO V NRC ORG:

UHRIG R E FL PWR h LIGHT DOCDATE: 05/23/78 DATE RCVD: 06/06/78 DOCTYPE:

LETTER NOTARIZED:

NO COPIES RECEIVED

SUBJECT:

LTR 3 ENCL 3 FURNISHING INFO CONCERNING WESTINGHOUSE"S PURSUIT TO ENSURE THE EXPLOSIVE TUBE PLUGGlNG PROCESS FOR REMOVING STEAM GENERATOR TUBES FROM SVC OF SUBJECT FACILITY.

PLANT NAME: TURKEY PT 04 REVIEWER INITIAL:

XJM DISTRIBUTOR INITIAL:~

DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ++++wmwww+ww+w++w+

GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.

(DISTRIBUTION CODE A001)

FOR ACTION:

BR CHI ORBS1 BC++W/7 ENCL INTERNAL:

EXTERNAL:

REG FILE W/ENCL 2 ENCL HANAUER4<W/ENCL AD FOR OPER TECH++M/ENCL REACTOR SAFETY BR+4W/ENCL EEB+>W/ENCL J.

MCGOUGH++W/ENCL LPDR S MIAMIi FL+>W/ENCL TIC44W/ENCL NSIC+4 W/ENCL ACRS CAT B4+W/16 ENCL NRC PDR++W/ENCL OELD>+LTR ONLY CORE PERFORMANCE BR++W/ENCL ENGINEERING BR>4W/ENCL PLANT SYSTEMS BR+%W/ENCL EFFLUENT TREAT SYS+%W/ENCL DISTRIBUTION:

LTR 40 ENCL 39 SI ZE:

4P THE END CONTROL NBR:

781570323

~'

I' h

)

PA~ggfgm)> rtgo[rg(f(fIF(P~!IF 0'13100. MIAMI, FL 33101 gyVlhg r>

FLORIDAPOWER & LIGHTCOMPANY May'23, 1978 L-78-173 Director of Nuclear Reactor Regulation Attention:

Mr. Victor Stello, Director Division of Operating Reactors U.

S. Nuclear Regulatory Commission Washington, D.

C.

, 20555 rrl g 3

3 1

Dear Mr. Stello:

Re:

Turkey Point Unit 4

Docket No. 50-251 Steam Generator Ins ection

'ur letter of March 21, 1978, T-78-98, summarized the events surrounding the discovery of a steam generator tube plug in the channel head of 4A steam generator during the last unit 4 steam generator. inspection.

In that letter, we committed to review the-st'earn generator, tube plugging program and to report to you the conclusions of our review.

This letter fulfills tha't-commitment.

We have completed a review of the explosive tube plugging program as it is implemented at Turkey Point Units 3 and 4, and we found that the program is regularly reviewed and improved based on field,experience.

We have concluded that the tube plugging program provides an acceptable method of removing steam generator tubes from service, so as to protect the health and safety of the public while minimizing personnel exposure.

The below listed items are representative of the action Westinghouse is pursuing to ensure that the explosive plugging process and its field application are such that the explosive plugging system is the best system available to ensure a reliable and durable seal of steam generator tubes while minimizing personnel exposure and unit down time.

1.

Westinghouse is pursuing a vigorous internal auditing program to ensure procedural compliance during explosive plugging operations.

The last internal Westinghouse audit conducted at the Florida Power and Light Turkey Point Site was conducted from December 16, 1977 to January 4,

1978.

I

~81 s7O3~3 Y;p PEOPLE...SERVING PEOPLE

Mr. Victor Stello Page Two L-78-173 2.

Westinghouse is currently in the final phases of approving a comprehensive non-proprietary procedure to formalize into one document several advisory letters concerning field application of the process specification.

3.

Westinghouse recently reached an agreement with one of-its suppliers which has allowed the complete declassification of the explosive plugging process thus making it easier for customer QA to audit Westinghouse's performance.

4.

Westinghouse maintains qualification records and documents proficiency of its explosive blasters to ensure that only competent and qualified explosive blasters are sent to the field.

Recent changes in the record keeping methods have been made to assure full compliance with the ASME code.

5.

Westinghouse has recently improved its filing systems to improve retention'nd access to pertinent material concerning its field service work.

Serialized logbooks are also used to improve control of field service efforts.

6.

Westinghouse has expended significant effort during the past year to develop statistics on leaking explosive plugs to monitor and continuously evaluate the effective-ness of the process and its.application.

7.

Westinghouse recently implemented an improved compre-hensive system for plug accountability from time of manufacture until installation at a plant site.

8.

Westinghouse has an ongoing RGD effort implementation of current processes and to effective and reliable systems for sealing tubes while maintaining radiation exposure ably achievable.,

to improve the develop alternate steam generator as low as reason-Additionally, Florida Power G Light Company Q/A and Q/C personnel perform inspections and audits to ensure that the Westinghouse explosive plugging process is being properly implemented.

This includes photographic inspections of the tubesheets"prior.':to.and at the conclusion of tube plugging operations.

This assures correct implementation of the intended plugging pattern and establishes that previously installed plugs are remaining in position.

Based upon review, procedural modifications will be implemented to ensure detecting a plug in the unlikely event it might fall out during the course of an outage.

A Mr. Victor Stello Page Three L-78-173 The revised procedures will require that the tube sheet photographs taken at the completion of planned tube plugging operations be reviewed to ensure that. all the correct tubes are plugged.

Any discrepancies will be investigated and any nec'essary corrective action taken before resuming power operation.

Although not then required by procedure, the photographs taken at the completion of the March steam generator tube plugging operation were reviewed to ensure all the correct tubes were plugged prior to the return of the unit to power.

The revised procedure will also require that positive steps be taken to verify that the correct tubes have been plugged during an unplanned tube plugging operation.

These steps vill, normally involve an examination of tube sheet photographs, however an examination of the tube

sheet, may also be performed to verify that the correct tubes have been plugged during the operation.

The potential for plugs becoming loose was evaluated with the following results:

1.

The occurrence of plugs becoming loose are very remote (the total Westinghouse experience shows less than 5 plugs have become

loose, out of 15,000 total plugs).

2.

Unfired plugs represent the most credible cause for plugs which become loose.

(FPL has confirmed that the loose plug discovered at Turkey Point Unit 4, in March, was never fired.)

3.

The only credible mechanism for plugs not firing is the inadvertent, undetected pulling out of the primacord from a plug that has been placed in the S/G tube.

While statistics verify that these occur'rences have been extremely remote, additional procedural improvements being implemented by Westinghouse will further reduce probability for occurrence.

In summary, Florida Power 6 Light Company has concluded that the Westinghouse explosive plugging technique provides a tech-nically sound plugging process which also minimizes radiation exposure and Unit down time.

Additionally, we have concluded that the plugging program is receiving adequate attention both at Westinghouse and FPL to ensure that it remains an effective and safe method.

We will continue to look for areas where

Mr. Victor Stello Page Four L-78-173 modifications can be made to further improve the reliability of the process and to reduce personnel exposure during the plugging process.

If you should have any questions on this matter, please call me.

Very truly yours, Robert E. Uhrig Vice President REU:.RJA:GDW:sl cc:

Mr. James P. O'Reilly, Reg'ion XX Robert Lowenstein, Esquire