ML18227D364

From kanterella
Jump to navigation Jump to search
Letter Attached Steam Generator Inspection Program
ML18227D364
Person / Time
Site: Turkey Point  
Issue date: 07/17/1978
From: Robert E. Uhrig
Florida Power & Light Co
To: Stello V
Office of Nuclear Reactor Regulation
References
Download: ML18227D364 (7)


Text

'REGULATORY INFORNATION DISTRIBUTION SYSTEN (RIDS)

DISTRIBUTION FOR INCOI'IING NATERIAL 50-2Si REC:

STELLO V NRC ORG:

UHRIG R E FL PWR Zc LIGI-IT DOCDATE: 07/i7/78 DATE RCVD: 07/2i/78 DOCTYPE:

LETTER NOTARIZED:

NO COPIES RECEIVED

SUBJECT:

LTR 3 ENCL 3 FORWARDING COPY OF SUBJECT FACILITY"S> (UNIT 4)

STEAN GENERATOR INSPEC

PROGRAN, WHICH IS TO BEGIN APPROX 08/03/78.

PLANT NANE: TURKEY PT N4 REVIEWER INITIAL:

XJN DISTRIBUTOR INITIAL:

essHs+4HH~4++4t+>+++4>

DISTRIBUTION OF TI.IIS MATERIAL IS AS FOLLOWS GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.

<DISTRIBUTION CODE AOOi)

FOR ACTION:

INTERNAL:

B F ORBNi BC+4~W/7 ENCL REG FILE~HAH/ENCL

-K E~~W/2 ENCL I<ANAUER~~~W/ENCL AD FOR SYS 5 PROJ+>W/ENCL REACTOR SAFFTY BR4~4W/ENCL EEB~H~W/ENCL J.

MCGOUGIf%+W/ENCL NRC PDR4~~W/ENCL OELD~+LTR ONLY CORE PERFORNANCE BR~4W/ENCL ENGINEERING BR4+W/ENCL PLANT SYSTENS BR%<W/ENCL EFFLUENT TREAT SYS>>W/ENCL EXTERNAL:

LPDR S NIANI FL~~~W/ENCL TERA~H~W/ENCL NS IC+4fW/ENCL ACRS CAT B+4W/i6 ENCL DISTRIBUTION:

LTR 40 ENCL 39

, SIZE:

iP~ 2P CONTROL NBR:

782060030

%%%%%%%%0M%%%+%%%%%40M+0E+%4MPRM%%%%

Tl-IE END

%%%%%%%%%+%4%++4+%%<%%%%%%%+<%%++<

'4 0

k Y

1 1

I'

FLORIDAPOWER & LIGHTCOMPANY July 17, 1978 L-78-238 Office of Nuclear Reactor Regulation Attn:

Mr. Victor Stello, Director Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Stello:

Re:

Turkey Point Unit //4 Docket No. 50-251 Steam Generator Ins ection Pro ram Attached for your information is a copy of the Turkey Point Unit No.

4 Steam Generator Inspection Program.

This inspection is scheduled to begin approximately August 3, 1978.

Yours v

truly, obert E. Uhrig Vice President Attachment REU:GDW:pit c(4~@(ig~r(

Eedp

,ge~Og00 SO PEOPLE... SERVING PEOPLE

1 li l

TURKEY POINT UNIT NO.

4 STEAM GENERATOR INSPECTION PROGRAM PLANNED FOR JULY-AUGUST 1978 1.

Eddy Current testing of U-bends is planned as follows:

a)

Steam Generator C, rows 2-5, columns 1-92; unplugged tubes will be tested at, 100 KHZ using beaded flex 0.540 probe.

b)

Any tube(s) which give indication at 3.00 KHZ will be reprobed using 400

'HZ.

2.

Hot leg tube -gauging will be conducted on all three steam generators utilizing three different sized eddy current probes

(.540 in 610 in., and

.650 in. diameters).

The unshaded areas on <he attached tube map identify the tubes to be probed.

3.

Cold leg tube gauging will be conducted on all three steam generators utilizing two different sized eddy current probes

(.540 in.

and

.610 in,).

The dashed line on the attached tube map indicates the extent of the cold leg gauging.

4.

Wrapper to shell annulus measurements will be made on Steam Generator B.

5.

Handhole inspections using TV and/or photographs will be used to inspect the flow slots and determine the extent of hourglassing on the gl tube support plates in Steam Generators A, B, and C.

6.

A Reg.

Guide 1.83 inspection will be performed.

7.

Preventive plugging based upon the inspection results.

SEPfFS 44 SwQwCSQIIViba~

qi.qpzssseqqsqv~~m7>massMh~esQ&~S9s~~A4049~8e

&937MQ31 ".92r2523RI BtV rS St~ 9 7 6 8

~

c'2

'9C ig gp4 Ã CX gt

~pO

~~ Qg +rg ting t COLUMNS

~I m-f'fiAK>YAY GAVCNG Y4~LS pig,'iiKfMAYltd g 4q

4Z 4!

40

38 57 t L

36

.r

3d

~~ 1 29 30 20

)5 8

a tS l3 I

it

)0 6

4 2

RQ VS NOZZLE~

4 qNf