ML18227D304
| ML18227D304 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/25/1976 |
| From: | Robert E. Uhrig Florida Power & Light Co |
| To: | Rusche B Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227D304 (4) | |
Text
DOCYET NVMGEB Qo- >5 I FILE NUMGEB FROM:
MR 3 C HUSCHE DATE OF DOCUMENT
- Q.a-"t 4 FPL MIAMIP FLA' E UHRIG......
DATE ECEIVED NVMOEB OF COPIES RECEIVED 0 NO TO B IZE D
+UNC LASSIFIE D PBOP INPUT FOAM ETTEB
~On I0 IN A I QCOPV DESCBIPTION ENCLOSUBE CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST o
~
~
~
~
~
~
~
~
~
~
LTR TRANS THE FOLLOWING......,....
(15 COPIES ENCLOSURE REC)-
i PLANT NAJIN: XuiL~~QN~~~
noZOr zzMOVE ACKNOWLEDGED.
FOR ACTIONJII SAFETY NFORMATION ASSIGNED AD:
ASSI NED D'RANCH CHIEF;
~
~
PROJECT lfANAGER:
LIC~ ASST PRO E
NA
~
INTERNALD IST RI BUTION SYSTEMS SAFETY RFQ SITE A
NN~VO ~NAIZSZ$
HEINEIfAN SCHROEDER NRC PDR I
6c E OELD ENGXNEERING GOSSICK 6c STAFF XPPOLITO MACCARRY MXPC K RKWOO KNIGHT SXHWEIL CASE OPERATING REACTORS 1IANAIJER PAWLICKI HARLE REACTOR SAFEEY PROJECT tfANA EffEN OPERAT N 'C EISENff ROSS NOVAK P
COLLINS SHAO ROSZTOCZY HOUSTON BAER CHECK PETERSON tfELTZ HELTEIIES GRIMES SALTZHAN RUTBERG SKOVfIOLT Q
I EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR:
i A NAT LAB BROOKHAVEN Ng~
ULRXKSON ORNL REG ~ VIE LA PDR TIC 0 NgI ASLB:
ONSULTANTS ACRS CYS HOLDXNG EN
~ h 0
~
~
NBC FOBM 195 (2.7G) iIIIIC F0 BM 196 V.G. I4VCLI.:AllBFOULATOflvCOMMISSION
{2 7ai I'JBC DISTRIBUTION ron PART GO DOCI<ET MATEI'IIAL
'll I
I
1.
gegulato~
PIkea C$ ~J FLORIDA POWER St LIGHT COMPANY August 25, 1976 L-76-309 Mr. Bernard C.
- Rusche, Director Office of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear,
Mr. Rusche:
Re:
Turkey Point Unit 4
Docket No. 50-251, Containment Building Inte rated Leak Rat'e Te'st In accordance with Appendix J to 10CFR50 (Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors) and Regulatory Guide 10.1 (Compilati.'on of Reporting Requirements for Persons Subject to NRC Regula-tions), fifteen copies of the Summary Technical Report of the Turkey Point Unit 4 Reactor Containment Building Integrated Leak Rate Test are enclosed for your information.
Very truly yours, p.k.~+
Robert E. Uhrig Vice President.
REU/MAS:mew Encs.
cc:
Jack R.
- Newman, Esp.
Mr. Norman C. Moseley Director, Management Information and Program Control (2)
AUQ2/ 197e,~
- , ea.~l V~j IIMlllhgg Ia
'k~~'ELPING BUILD FLORIDA
0