ML18227D101
| ML18227D101 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/27/1976 |
| From: | Schmidt A Florida Power & Light Co |
| To: | Moseley N NRC/IE, NRC/RGN-II |
| References | |
| PRN-LI-76-35 | |
| Download: ML18227D101 (3) | |
Text
Fon>>
1tJr~
I2.76I.S.
NUCLEAR REGULATORY COMMISSIotl DOCKET t4UiVIBER ED-NRC DISTR IBUlION FoA PI%GO DOCKET MATERIAL FILE NUtABER Rl'.PORTS FXLE T,O:
Mr Hoseley FROM: Florida Pwr & Light Co Miami, Fla h
D Schmidt DATE OF DOCUMENT 2-27-76 DATE RECEIVED 3-26-76 RELETTER
~
0ORIGINAL SCOP Y 0 NOTOA IZED IIUNCLASSI FIED PROP INPUT FOAM NUtv1BEA OF COPIES AECEIVED none ' igned DESCRIPTION
/'
Ltr.trans the following:
ENCLOSU RE I
/
Semiannual Operating Report
/P7 for the period 7-1-75 thru 12-31-75..........
(40 cys encl rec')
PLANT NAME: Turnkey Point 3 & 4 LIC ASST, Qg,;,,LTR & MAIL CONTROL ONLY NOTE:
DOCKET CLERK MILL SEND EPA(2),
F & M (2),
F & D & NOAA CYS TO ENVIRO LIC~. ASST.
FOR DISTRIBUTION. ~ ~ ~ TOTAL (6)
CYS FOR ACTION/INFORMATION O
3-29-76 ehz ANQJ CPU
~
QX~~CZXK HG J.'I h
DR STELLO lfACCARX.
TEDESCO/ROSS J ~
. COLLINS KREGER X & H INTERNALDIST RI BUTION HANAUER EXSHNikUT LXC. hSST ~ L LTR & I I " CONTROL ONLY DENITON LPDR: (
ln.m I TIC ll&Xr AORS i/7b CXS JIOLDXNG EXTERNAI DISTR IQUTIOH CONTROL NUMBER NAC FOAM 166 I2.'/6)
l
8 MAR2,61976 ~
FLORIQA POWER 5 L(GHT COVER I
~
~"
~ "I'I A l I
/
.V,S. IIIInva I'-'4hIII~E COMM I 5 5 IOII Vl February 27, 1976
~'I PRN-LX-76-35 Mr. Norman C. Moseley, Director, Region XX Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 230 Peachtree
- Street, H. N., Suite 818 Atlanta, Georgia 30303
Dear Mr. MosIel'ey:
O.pl l
I 0
TURKEY POXHT UNITS 3
AND 4 DOCKET HOS.
50-250 AND 50-251 SE'BIANNUAL OPERATING REPORT NO.
7 The Turkey Point Semiannual Operating Report for the period July 3.,
1975 to December 31, 1975 is attached.
Change 25 to the Technical Specifications revised the reporting time zrame from semi-annual to annual.
This report satisfies the old. requirements of superseded Technical Specification 6.6.1.a.(3).
Future reports will be in the form of an Annual Operating Report in compliance with current Technical Speci ica-tion 6.9.1.b.
Very truly yours, D. Schmidt Vice President Power Resources MAS/cpc Attachment CC Jack R.
Newman, Esquire Director, Office of Inspection and Enforcement (40)
Director,'ffice of Management Xnformation and Program Control (2) 306'7