ML18227C982

From kanterella
Jump to navigation Jump to search
Notice of Meeting with Westinghouse and Licensees of Westinghouse-Designed PWR Facilities to Discuss Proposed Measures to Prevent Reactor Vessel Overpressurization
ML18227C982
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/10/1977
From: Zech G
Office of Nuclear Reactor Regulation
To: Schwencer A
Office of Nuclear Reactor Regulation
References
Download: ML18227C982 (11)


Text

Meeting Notice for Westinghouse Plants MAY I 0 1977 NRC PDR LOCAL PDR ORB81 Reading NRR Reading E,.

G.

Case V. Stello D. Eisenhut K.

R. Goller A. Schwencer D. Davis G. Lear R. Reid L. Shao,,

W. Butler B. Grimes R.

Baer Project Manager

Attorney, OELD OI&E (3)

OSD (3)

B. Faulkenberry, I8E D. Thompson, ISE Licensing Assistant Receptionist, Bethesda Principal Staff Participants k.

F. Fraley, ACRS (16)

~

~

~ r ~ oo or o ~

~ o

~ ~

%~I

~8 REC(

P0 Cy

'n R

Cy

+g ++*++

~

~

UNITEDSTATES NUCLEAR REGULATORYCOMMISSION WASHINGTON, D. C. 20566 MAY 10 1977 Docket Nos.

50-334, 50-315, 50-244, 50-305, 50-266, 50-301, 50-282, 50-306 50-261, 50-206, 50-280, 50-281, 50-344, 50-250, 50-251, 50-295, 50-304, and 50-272 MEMORANDUM FOR:

A. Schwencer, Operating Reactors Branch ¹1, DOR FROM:

SUBJECT:

Date and Time:

Location:

Purpose:

G.G.

Zech, Project

Manager, Operating Reactors Branch ¹1, DOR FORTHCOMING MEETING WITH WESTINGHOUSE AND THE LICENSEES OF WESTINGHOUSE-DESIGNED PWR FACILITIES TO DISCUSS PROPOSED MEASURES TO PREVENT REACTOR VESSEL OVER-PRESSURIZATION Wednesday, May 25, 1977 9:00 a.m.

Phillips Building Room P-118 To provide the opportunity to update the progress made on a generic basis, to prevent reactor vessel pressure transients in Westinghouse-designed PWR facilities.

Participants:

NRC G.

Zech C. Berlinger G. Lanik T. Marsh M. Fletcher J. Siegel

,T.Wambach D. Neighbors J.

Wetmore M. Grotenhuis G.Zwetzig F. Burger M. Fairtile:

D. Elliott C. Trammell, et al Duquesne Light Company Indiana 8 Michigan Power Co.

Rochester Gas 8 Elec.

Corp.

Wisconsin Public Service Corp.

Wisconsin Michigan Power Co.

8 Wisconsin Electric Power Company Northern States Power Co.

Carolina Power 8 Light Co.

BEaver Valley Unit 1)

D.

C.

Cook Unit 1)

(R.

E. Ginna)

(Kewaunee)

(Point Beach Units 1 and 2)

, Prairie Island Units 1

and 2)

', H.

B. Robinson Unit. No. 2)'.

E Meeting Notice MAY 1p ]97y Southern California Edison Co.

(San Onofre)

Virginia Electric 5 Power Co.

(Surry Units 1 and 2)

Florida Power 8 Light Company (Turkey Point Units 3

8 4)

Portland General Electric Co.

(Trojan)

Commonwealth Edison Co.

(Zion Units 1 and 2)

Consolidated Edison Company

( Indian Point 2 8 3)

Gary G.

ech, Pr 't Manager Operating Reactors Branch

¹1 Division of Operating Reactors cc:

See next page

Meeting Notice for Westinghouse Plants MAY 1 0 ]977 ocket LOCAL PDR

, ORB¹l Reading NRR Reading E.

G.

Case V. Stello D. Eisenhut K.

R. Goller A. Schwencer D. Davis G. Lear R ~ Reid Shao W. Butler B. Grimes, R. Baer.

Project Manager

Attorney, OELD OlaE (3)

OSD (3)

B. Faulkenberry, I8 E D. Thompson, I&E Licensing Assistant Receptionist, Bethesda Principal Staff Participants R.

F. Fraley, ACRS (16)

h I'

~p,'8 AE0y

~C

'p0

++*++

t UNITEDSTATES NUCLEAR REGULATORYCOMMISSION WASHINGTON, D. C. 20555 MAY 10 877 I

~"c 1

i Docket Nos.

50-334, 50-315, 50-244, 50-305, 50-266, 50-301, 50-282, 50-306 50-261, 50-206, 50-280, 50-281, 50-344, 50-250, 50-251, 50-295, 50-304, and 50-272 MEMORANDUM FOR:

FROM:

SUBJECT'ate and Time:

Location:

Purpose:

F

Participants:

'I A. Schwencer, Operating Reactors Branch ¹1, DOR 1

G.G.

Zech, Project Manager, Operating Reactors Branch ¹1, DOR FORTHCOMING MEETING WITH WESTINGHOUSE AND THE LICENSEES.-'F WESTINGHOUSE-DESIGNED PWR FACILITIES TO DISCUSS PROPOSED MEASURES TO PREVENT REACTOR VESSEL OVER-PRESSURIZATION

Thursday, May 25, 1977 9:00 a.m.

Phillips Building Room P-118 To provide the opportunity to update the progress made on a generic basis, to prevent reactor vessel pressure transients in Westinghouse-designed PWR facilities.

NRC G.

Zech C. Berlinger G. Lani k T. Marsh M. Fletcher J. Siegel T.Wambach D. Neighbors J.

Wetmore M. Grotenhuis G.Zwetzig F..Burg'er M. Fairtile D. Elliott C. Trammell, et al

~,

Duquesne Light Company Indiana 8 Michigan Power Co.

Rochester Gas 8 Elec.

Corp.

Wisconsin Public Service Corp.

Wisconsin Michigan Power Co.

5 Wisconsin Electric Power Company Northern States Power Co.

Carolina Power 8 Light Co.

(BEaver Valley Unit 1)

(D.

C.

Cook Unit 1)

(R.

E. Ginna)

(Kewaunee)

(Point Beach Units 1

and

'2)'Prairie Island Units 1 arid 2)

(H. B. Robinson Unit No. 2)'..

p

'I II ll t

Meeting Notice MAY 10 19P7 Southern California Edison Co.

(San Onofre)

Virginia Electric 8 Power Co.

(Surry Units 1

and 2)

Florida Power 5 Light Company (Turkey Point Units 3 5 4)

Portland General Electric Co.

(Trojan)

Commonwealth Edison Co.

(Zion Units 1 and 2)

Conso'lidated Edison Company (Indian Point 2

8 3

Gary G.

ech, Pr 't Manager Operating Reactors Branch ¹1 Division of Operating Reactors cc:

See next page