ML18227C822
| ML18227C822 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/27/1974 |
| From: | Robert E. Uhrig Florida Power & Light Co |
| To: | Case E US Atomic Energy Commission (AEC) |
| References | |
| Download: ML18227C822 (6) | |
Text
AEC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)
CONTROL NO:
FILE FROM: Flor'Sda Power
& Light Co IIiami, Pla.
33101 DATE OF DOC DATE REC'D LTR TWX RPT OTHE R TO:
E.G, Case ORIG 3 signed CC OTHER SENT AEC PDR SENT LOCAL PDR CLASS UNCLASS PROPINFO DESCRIPTION:
INPUT NO CYS REC'D 43 ENCLOSURES:
D NO:
50-25 /251 Ltr re their 9-6-74 submittal.....
trans the following...request for changes to the Tech specs......
notarized 9-27-74...
PL'ANT NAME:
Turkey Point 3
& 4 FOR ACTION/INFORMATION BUTLER (L)
W/ Copies CLARK (L)
W/ Copies PARR (L)
W/ Copies KNIEL (L)
W/ Copies SCHWENCER (L)
W/ Copies STOLZ (L)
W/ Copies VASSALLO (L)
W/ Copies PURPLE (L)
W/ Copies ZIEMANN(L)
REGAN (E)
W/ Copies W/ Copies DICKER (E)
&LEAR(L)
W/ Copies WQCopies KNIGHTON (E)
W/ Copies W/ Copies YOUNGBLOOD (E)
W/ Copies W/ Copies INTERNALDISTRIBUTION REG FILE(L r 251) tr 251)
MGC, ROOM P-506A MUNTZING/STAFF CASE G IAMBUSSO BOYD MOORE (L) (BWR)
DEYOUNG (L) (PWR)
SKOVHOLT (L)
V GOLLER (L)
P. COLLINS DENISE v REG OPR FILE 5 REGION (3)
MOR R IS STEE LE TECH REVIEW SCHROEDER MACCARY KNIG HT PAWLICKI SHAO STELLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO LONG I AlNAS BENAROYA VOLIMER DENTON G R I MES GAMM ILL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KNIGHTON YOUNGB LOOD REGAN PROJECT LDR Cleveland HAR LESS LIC ASST DIGGS (L)
GEARIN (L)
GOULBOURNE KREUTZER (E)
LEE (L)
MAIGRET (L)
REED (E)
SERVICE (L)
SHEPPARD (L)
SLATER (E)
SMITH (L)
~EETS (L)
WI LLIAMS(E)
WI LSON (L)
A/T IN D BRAITMAN SALTZMAN B. HURT (L)
PLANS MCDONALD CHAPMAN DUBE w/input y'. COUPE
~.Schemel D. THOMPSON (2)
KLECKER EISENHUT EXTERNALDISTRIBUTION W LOCAL P DRSome&ad, ala; V1 TIC (ABERNATHY)
(1f(2)(10) NATIONALLABS W NSIC (BUCHANAN) 1 ASLBP(E/W Bldg, Rm 529) 1 AS LB 1
W. PENNINGTON, Rm E-201 GT 1 Newton Anderson 1
BSM SWINEBROAD, Rm E-201 GT V 16 ACRS H%5MR ent <<1 CONSULTANTS Teets NEWMARK/BLUME/AGBA BI AN 10-1-74 1 P DR-SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULRIKSON, ORNL 1 AGMED (RUTH GUSSMAN)
Rm B-127 GT 1 R. D. MUELLER, Rm E-201 GT
~
~
~
~
'r 4
~
~
~
~
~
P
~
~
~
~
~
~
~
~
~
~
~
~
~ g n
I
.O. ROX SIOO NIAOAI,I'LORIDh RSIOI "IlegIllatory OoolIet File FLORIDA POWER 8I UGHT COMPANY b.
OCEEyEO
~
September 27, 1974 NAEC OCT 8 1974 Mr. Edson G Case, Acting Directo Directorate of Licensi,ng Office of Regulation U.
S. Atomic Energy Commission Washington, D. C.
20545 OEOOLAIOOy NIL SECyIOII OOCKEy CLEEK rz 0
OCT 8
~g74 =-
Dear Mr. Case:
TURKEY POXNT PLANT UNXTS. 3 AND 4 DOCKET NOS,
. 258 AND 50~251 PROPOSED AMENDME 0 THE FA,CXLXTY
'PERATXNGXCENSES'PR~31'D'DPR~'41 ILS. !,yCIIIO Eg P y CO",:,IIIO,I""
Aloll Soolilo Xn accordance Wi,th, 10 CFR 50,30, Florida Power
& Li,ght Company submits hereWith'hr'ee si,gned originals and forty (40) conformed copies of a request to amend the Facility Operating Licenses DPR-31 and DPR,-41.
This submittal supplem'ents our September 6,
1974 submittal in which we proposed changes to the.Technical Specifications (Appendix 'A of
.the Facility Operating Licenses) implementing the ECCS Final Acceptance Criteri,a (FAC}.
We are submitting this request based on additional information whi,ch Florida PoWer s Light Company received from the reactor Vendor concerning the FAC analyses, Thyrse analyses show that the safety i,njection system accumulator water volume must to i,ncreased from the'resent.
minimum, of 775 cubic feet. to 825 cubi,c feet.-
We have not changed the'res'ent Technical Specification accumulator water volume diffegence of 16 cubic feet between the'ower'nd upper Technical Speci,fi,cation limits, therefore, the 'upper limit must be i,ncreased to 841 cubi;c feet, However, thi's volume difgeren'ce is subject, to change following further review and analysi,s, To fully comply with the FAC analyses we are requesting the above mentioned, cha'nges to the attached revised Page 3.4-1 of the Technical Specifi,cations (Appendix A og the Facility Operating Li,censes),
As we have already implemented the Technical Specifica
'tion changes submi,tted on Sep'tember 6, 1974, this change wi,ll be i'mplemented by October 1, 1974, HELPING BUILD FLORIDA
It,'I,w, g ),.'l)',
li+,>>+fsv', 4)li I'Nl r
~
0 1
g" ~
4 t
C
Mr. Edson G. Case, Acting Director Page Two September 27, 1974 We have reviewed this change and have concluded that it does not represent a significant hazards consideration and there is reasonable assurance that the health and safety of the public will not be endangered.
Very truly yours, Robert, E. Uhrig Vice President REU/DWR/pg Enclosures cc:
Jack R.
Newman, Esquire STATE OF FLORIDA )
)
COUNTY OF DADE
)
ROBERT E.
UHRIG, being first duly sworn, deposes and says:
s That he is a Vice President of Florida Power 6 Light Company, the Licensee herein; That he has executed the foregoing instrument; that the statements made in this said instrument are true and correct to the best of his knowledge, information and belief; and that he is authorized to execute the instrument of said Licensee.
Robert E. Uhrig Subscribed and swo n to before me this g+ day of 1974.
Nota y ublic in and for the County of D
, State of Florida Notary Public, State ot Florida at large Ny Commission Expires Oct. 30, 1974 hara s x~~ rs a aavxy w f(
g(
0
<<t tl l
I 1
C h