Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/09/1977
From: Lear G
Office of Nuclear Reactor Regulation
To: Robert E. Uhrig
Florida Power & Light Co
References
Download: ML18227C725 (5)


Text

Oockets thos. "0-~5 and 50-251 Florida Power A Light Company ATTN:

Dr. Robert E. Uhrig Vice President P. 0. Box 013100 Hiami, Florida 33101 Gentlemen:

FEB 8

t977 DISTRIBUTION:

NRC:PDR Local PDR ORB83 Rdg TJCarter GLear CParrish DElliott GZech OELD OI8E -(3)

DEisenhut TBAbernathy JRBuchanan ABRS (16)

File e

\\

RE:

TURKEY POINT NUCLEAR GENERATING UNITS WOS 3 AttD 4 Me have completed a preliminary review of your submittal of December 10, 1976, in ~t~fch you describe a "Reference tfftfgating System" and dfscuss your plans regarding long term desfgn nodfffcations to provide protection against reactor vessel overpressurfzatfon.

As indicated in our letter of January 12, 1977, the design criteria that should be applied to your long tern design modifications are those identified in our November 4, 1976 meeting.

The enclosur e to this letter identifies specific design features of the "Reference ttftfgatfng System" ~hich do not meet these criteria and also identifies additional information ve

~ill require to continue our revfeM of your submittal.

Please respond to this request for additional,'infomatfon within 45 days of receipt of this letter.

Sincerely,

Enclosure:

Request for Additional Information George Lear,, Chief Ope~ating Reactors Branch 83 Divisfon of Operating Reactors cc:

Hr. Jack R.

tte~rnan

, Esqufre Lowenstefn, ttewman, Rais E Axelrad 1025 Connecticut Avenue, tl. )t.

Suf te 1214 Mashfngton, O. C.

20036 OFFICE~

SURNAME&

DATE~

nvfronnental

.3 Orf@e-Iieet" tfamf Fl ori d 8 Urban Affa rs Library 33199

.. GZe&=

.....2I............./7.7....

~BL3.

E33i&&a.cr.

.V.

~7.77. 2/

Pt NRC FORM 518 (9-76) NRCM 0240 A U, 0, COVERNMENT FRINTINC OFFICEi IST0 020.024

V I

I h

l II 1

T(

h-Y 4

d 4

f

RE UEST FOR ADDITIOINL INFORtNTIOH I

Hith reference to the acceptance criteria required for your overpressure protection system as contained in our January 1977 letter that also discussed interim measures and installation schedule, this request for additional information identifies those aspects of the l]estinghouse proposed Reference Hitigating System (RES) that are not acceptable.

The specific design features of the RVjS are listed in your submittal as paragraphs headed alphabetically

a. through i.

Those design features that do not meet the acceptance criteria are as follows:

Paragraph a.:

The RNS uses a single pressure transmitter thus not providing a system that can accept a single failure and still function, If no acceptable alternate protection is available, two power operated r lief valve systems are required, that are separate and independent throughout the system from pressure sensor to relief valve.

Paragraph b.:

The single failure criteria requires a separate air accumulator for each relief valve operator.

Paragraph c.:

Provide the basis for any deviations from IEEEZ79 requirements for electrical components.

Paragraph d.:

An annunciator must be provided to insure that the keylock switch is in the proper position when shutdown.

Paragraph e.:

Provide the basis for any deviations from Seismic Category I design requirements for system components.

Paragraph f.:

The accumulators should also be seismically qualified.

Paragraph g.:

Loss of ai r supply to the relief valve accumulators should be alarmed during shutdown, In addition to providing a resolution to each of the above items, the following additional information is requested:

.l.

Provide schematic piping and instrumentation diagrams of all systems which are utilized during plant shutdown and startup operations, indicate primary and alternate flow paths, fluid and heat sources, pressure and flow controllers, RCS pressure protection systems, ECCS and make up systems.

2.

3.

Provide the failure modes and effects analysis of the overpressure protection system for startup,

shutdown, and testing operations which defines the limiting combination of initiating event and additional single failure or operator error subsequent to initiation of the pressure transient, Discuss the basis for determining the most limiting initial conditions for analysis of the pressure transient.

Items that must be considered include but should not be limited to:

RCS pressure, reactor coolant temperature, pressurizer temperature, pressurizer level and accumulator level.

5, 6.

7.

'8, i(ere approved systems computer codes used to model the overpressure transients as presented in the generic report?

If so, were any major modifications required?

If the methods utilized have not b en previously approved for system transient

analyses, provide model descriptions, flow charts, program listing, and sensitivity studies to verify the pe> formance of the codes.

Provide the value of the backpressures assumed in the relief valve discharge pipes when calculating relief capacity, Discuss relief capacity sensitivity to this param ter.

Provide the degree of relief capacity installed in the RHR system that could provide additional protection in the event of an over-pressure transient.

Provide the water relief capacity of the valve.

Is the RHR sys tem automa tica 1 ly isolated on RCS high pressure?

Provide the pressure setpoints for the RHR system relief valve opening and its automatic isolation, Describe the instrumentation and alarms available to enable the operator to detect and quickly terminate an overpressure transient, Describe the indication of pressurizer relief valve or RHR system relief valve operation.

When power is removed from valve motor operators under administrative control provisions, describe the status liqhts and indicators available to verify their proper alignment.

Hhen administrative controls call for removing power from a valve motor operator or a pump, is this accomplished from the control room or from a motor control center?