5ilV Idn Power A Light Co., for operation of the Turkey Point nuclear genera fng unit No. 3 located ln Dade County, Fin. The tunendment Is effective as of the date of Issuance.

The amendment to the operating li-cense willallow continued operatfon of Turkey Pohtt upset go. 3 for lite next sfx equfvafrnt,fttff-power months of operatfon (EFPM) at which time the steam generators shall be Inspected, unless: (1) An inspection of the steam generntors hns previously been per-formed within the six EFPM period, or (2) an acceptable ana)ysfs of thc susceptibility for stress corrosion craclcfng of tubing Is.submitted to ex-plicitly Iustffy continued operation beyond the authorized six EFPM period.

Thc applfcatfon for the amendment compiles with the standards and re-quirements of the Atomic Energy Act of 1054, as amended (the Act), nnd the Commission's rules and rcgctlntlons.

The Commission hns made npproprl.

ate findings ns required by the Act nnd the Commission's rules and regula-'ions fn 10 CFR Chapter I. which nrc set forth fn the license amendment.

Prior public notice of this Mnendmcnt wns not required since the amendment does not Involve a significant hazards cons[ dcratlo.

The Commfsslon has determined that the issuance of this amcndmcnt cvf)l not result In any'significant envi-ronmental Impact and that pursuant to 10 CFR II61.5(d)(4) an environmen-tal impact statement, negative declara-tion or environmental impact apprals.

nl need not be prepared fn connection with issuance of this amendment.

For futher details with respect to this actionscc: (1) The application for amendment dated December 20, 1977, as modified by letter dated January 18, 1978, (2) amendment No. 32 to ll-cettse No. DPR-31, and (3) the Com-

~

mission's related safety evaluation. All of these items are available for public inspection at the Cotnmfssfon's Public Document, Room, 1V17 H Street IAV.,

Washington. D.C., and at the Environ-mental ancl Urban Affairs Library, Florida International Unlversfly, Miami. Fla. 33199. A copy of Items (2) and (3) may be obtained upon request addressed to the U.S. Nuclear Regula.

tory Commission, Washington, D.C.

20565, Attention: Director, Dlvlslon of Operating Reactors.

Dated at Bel,hesda, Md., this 31st day of January 19V8 does not Involve a significant htuwrds consideration.

the Commission hns prepared an en-vironmental impact appraisal for the will be no environmental impact at-tributable to thc action other than that whfch has already been predicted and described fn the Commission's

[7590-01]

[Docket No. 50-250)

FLORIDA POWER 8 LIOHT CO.

For the Nuclear Regulatory Com-mission.

GEonoE LEAR,

Chfef, Operating Reactors Branch No. 3, Dfvfsforc of Op-erating Reactors.

[FR Doc. 78-3243 Filed 2-6-78; 8:45 am)

NOTICES P5fr0-0).1 The amendment walves the.requfrc-

[Docket No.60-334) ment to perform weekly quantltatlvc san>pllng of ffsft and shellfish from DUQUEstfE LtoHT coMpAHY, ET AL, the intake screens durIng the perfod II intake canal modifications are being

~'.r'i[co<<tt on Am!<<me>> <<<<ctttty OPerattntt conducted.

The requirement to Pcr.

'Ii'tcense form dally vtsual checks of the screens O'Thc U.S. Nuclear Regulatory Com.

)>nsbeenretalned.

mlcslod on January 2V, 19V'I, published The application for the amendmrnt, fntheFsvsa4[.Rsorsrxn,42pR5155,n complfes with the standards and re-

"proposed issuance of the Amend.

qulrements of the Atomic Energy Act

.ment to'acflfty Operating Lfcettse" of 1954, ns amended (the Act), and the relating to the above-identified faclll-Commission's rules nnd regulations.

!J.

Iy. The proposed nmendment would Thc Commission hns made npproprl-',permlt an fttcrease In the spend fuel nte findings ns required by the Act nnd storage capacity at the Beaver Valley the Commission's rules nnd rcgula-Power Station. An opportunity was af-tfons In 10 CFR Chapter I. which nro

'r 4forded to interested parties to request set forth fn" the license amendment.

a hearing with regard thereto.

'rior public notice of this antendment Tile City of Pittsburgh flied a peti. 'as not required since the amendment, tlon to Intervene nnd requested n hcar-

~4,'Ing In response to the above notice In

, Q Lhe FsnzscAT. Rrarsxzn. That petition

.<<as granted and a hearing ordered by

'he Atomic Safety and Licensing revised technical specifications and Board which had been established to has concluded that nn envlrorunenl.al hear such petitions, Notice,of this impact statement for this particular

~ q~,action was publlshecl ln the Fzvxtchr action Is not warranted because there 4 Rzatsrsn, 42 FR

18450, on APrfl 7,

.197'I.

~ Please take notice that the evlden-

~r gjfflary hearings In this proceeding will e tfgconunence at 1:30 P.m.,

March 13 final envlromnental statement for the i

gyes.1978, at, the Nuclear Regulatory Com.

facility.

ygmfsslon Endearing

Room,

. 5th Floor For further details with respect to tt,y,East/West Towers Building.

4360 this action, see.'(1) The application for

'jjEtLst/West EIlghway, Bethesda, Md.

amendment dated Novembet

8. 1977,

., VyItfssoordered.",

(2) amendment N'o. 12 to license No.

For the Atomic Safety and Lice Ing DPR-'l2, and (3) the Com)nfssfon's re-All of these items are ava[IPapblc for Issued at Bethesda, Md., this 1st day pub)ic fnspectlon "at thc Commission's

~

~

of February 1978.

Public Docutnent Room, 1717 H Street IvyW SM[2H NW.~ Wnshfngton, D.C.. and at Ihc afr7ttatt Crystal River Public Library, Crystal 4;

~

~

~

~

~

River, Fla. A copy of Items (2) and (3)

~

".<rr[FR DOC. 78-3241 Piled 2-6-78; 8:46 am) may be Obtained upOn requeSt ad-dressed to the U.S. Nuclear Regula-

,4 + [7590-OI j tory Commission, Washington, D.C.

2055. Attention; Director. Division of Opcratht g Reactors.

FLOR[DA POY(ER CORP. ET AL.

Dated at Bethesda, Md.. thfs 23rd bcvance of amendment to Facility Operatlntt day of January 1978.

Ltcenco and Negative Dectarolton For thc Nuclear Regulatory Com-The U.S. Nuclear Regulatory Com-mission.

mission (thc Commfsslon) has Issued ramendment No. 12 to facility operat "kg license No. DPR-V2, issued to the ernt~fng Reactors Florida Power Corp., city of A)achua,

<,< City Of BuShnell, City Of QafneSVffie, FRDoc.78-3242Filed2-6-78;8:45mn) ktg city of IC[sslmmee, city of Leesburg, a+ city of Ncw Smyrna Beach and Utlll-II/sties Commission, city of New Smyrna

-.I-."" Beach. city of Ocala, Orlando Utilities Commission nnd city of Orlando, Sebr-Ing Utilities Commission, Setnlnole

,QEIectrfc CDDPeratlve, Inc., and the city fccaance of Amenctment to Factttty Operallny

~ of Tallahnssec (the licensees) which

'e4 revised technical specifications for op-

<-> eratlon of the Crystal River unit No. 3 The U.S. Nuclear Regulatory Com-f+j nuclear generating, plant located ln

~ mfsslon (the Commission) hns issued

~<<'itrus County. Fla. The amendment Is amendment No. 32 to facility operat-effective ns of the date of issuance.

Ing lfcensc No. DPR-31, issued to F)or-FEDERAL REO[STER, VOL 43, HO. 25 TUESDAY, FERRUARY l, )978

f

'4 I

I

4890 Issued: February 1, 1978.'ENNETII R. MASONr Secretary.

[FILDoc. 78-3174 FIIed 2-3-78; 8:45 sm)

[7020-02]

(332-86)

Y/ATCH MOVEMEN'TS Collection of Data for Determination of Apparent U.S. Consumption AGENCY: United States International Trade Commission.

ACTION: Creation of a permanent docket for the collection of data under the authority of section 332(b) of the Tariff Act of 1930, as amended (19 U.S.C. 1332(b)). to determine apparent U.S. consumption of watch movements pursuant to Pub. L.89-805 of Novcm-bcr 10, 1966 (60 Stat. 1621. 1522).

EFFECTIVE DATE: January 27, 10'l6.

FOR, FURTHER INFORMATION CONTACT:

Mr. Lee Lukens, General Manufac-tures Dlvhlon, United Slates Inter-national Trade Commission, 701 E Strcct NW., Washhtgton, D.C. 20436, tele pl tone: 202-523-0226.

SUPPLEMENTARY INFORMATION:

Paragraph (c) of headnol,c 6, schedule

'l, part 2, subpart E, of the Tariff Schedules of the United States re-quires the U.S. International'rade Commission annually to determine the apparent U.S, consumption of witch movemcttts for the preceding calendar year and to use such dctcrminatlon as a basis for computing and allocating the quota for watches and watch movements, the product of certain U.S.

Insular possessions,

'admissable free of duty during tho following cal-endar year, under general headnote 3(a) of the Tariff Schedules of the United States.

Thc detennlnatlon of consumption of watches and watch movements In the United.States ls derived from pro-duction data, Inventories and exports obtained from questionnaires comp)et ed by the domestic producers; data on imports for ct)nsumptlon, and ship-ments from the insular possessions will be taken from official statistics complied by thc Department of Com.

merce, Bureau of Census.

The Commission ls required to deter-mine thc apparent U.S. consumption of watch movements, in 197V and on or before April 1, 1978 report such deter-mination to the Secretary of the Trea-sury. the Secretary of'he Interior, and the Sceretary of Commerce and to publish such detennlnatlon in the FEBEIIAI, REOIsTEtt, together with the number of watches and watch move-ments which are the product of the Virgin Islands, Guam, and American NOTICES Samoa which may be entered free of duty during calendar year 1978.

By order of the Commhslon:

Issued: February 1, 1978.

KENNET)IR. MASotir Secretary.

IFILDoc. 78-3176 Flied 2-3-78; 8:45 am)

[7537-0'I ]

NATIONALFOUNDATION ON THE ARTS AND THE HUMANITIES VISUALARTS ADVISORY PANEL Meeting Pursuant to section 10(a)(2) of the Federal Advisory Committee Act (Pub.

L.92-463),

as

amended, notice Is hereby given that a meeting of the Visual Arts Advisory Panel (Arthts'ellowships) to the National Council on the Arts will bc held 1 ebruary 22, 1978, from 9:30 a.m. to 6 p.m.; Febru.

ary 23, 1978, from 9:30 a.m. Lo 6 p.m.,

and February 24, 19V8. from 9:30 a.m'o 6 p.m. In Columbia Plaza Room 1115, 2401 E Street NW., Washington, D.C. 20506.

Thh meeting Is for the purpose of Panel

review, discussion, evaluation, and rccommendai,lon on appllcatlons for financial assistance under the Na-tional Foundation on the Arts and the Humanities Act of 1965, as amended, Including discussion of, Luformatlon given ln confidence to the agency by grant applicants. In accordance with the determbtatlon of the Chairman published ln the FEBERAI. REdtsTER of March 17, 197V, these sessions will be closed to the public pursuant to sub-section (c) (4), (6) and 9(B) of section 552 of Title 5, United States Code.

, Further Information with reference to thh meeting can be obtained from Mr. Robert M. Slms, Advisory Com-mittee Management Officer, National Endowment for the Arts, Washington.

D.C, 20506, or call 202-634-6378.

RoBERT M. SIN/,

ArtmtntstraAve Offfccr,,National Zndotomcnt for the Arts, Na-tiona/ Founrfatton on the Arts and thc Humanities.

JANUARY 31, 1978.

IFILDoc. 78-3064 Filed 2-3-78; 8:45 am)

[7590-Ol]

NUCLEAR REGULATORY COMMISSION (Docket No. 50-250)

FLORIDA POWER AtID LIGHT CO.

Issuance of Amendments to Facttity Operotina Ltcense The U.S. Nuclear Regulatory Com-mhslon (the Commission) has Issued e

Amendment No. 31 to Facility Operat-ing License No. DPR-31.

Issued to Florida Power and Light Co., which re-vised Technical Specifications for Op-eration of the Turkey Point Nuclear Generating Unit lfo. r7, ]00ated in Dade County, Fla.fI'pe itn)eitdment ls cffcctivc as of the date of issuance.

The amendment authorizes oper-ation of Turkey Point Unit No. 3 with up to an average of 15 percent of the steam generator tubes ln a plugged condition.

The application for the amendment compiles with the standards and re-quirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.

The Commission has made appropri-ate findings as required by the Act and the Commission's rules and regula-tions in 10 CFR Chapter I, which are sct forth in the llcensc amendment.

Prior public notice of thh amendment was not required since the amendment does not involve a significant hazards consideration.

The Commission,has determined that the issuance of this amendment will not result In any significant envi-ronmental impact and that pursuant to 10 CFR 51.5(d)(4) an environmental impact statement or negative declara-tion and environmental impact ap-praisal need not be prepared in con-nection with issuance of this amend-ment.

For further details with respect to this action, see (1) the application for amendntent dated June 8.

19'l7 (as supplemented by letter dated July 11, 197V), (2) Amendment. No. 31 to LI-cense No. bPR-31, and (3) the Com-mission's related Safety Evaluation.

All of these items are available for public inspection at the Commission's Public Document Room, 1717 H Street 14W., Washington, D.C. and at the En-vironmental tIs Urban Affairs LIbrary, Florida International Unlverslty, Miami, Fla. 33199; A copy of items (2) and (3) may be obtained upon request addressed to the U.S. Nuclear Regula-tory Commission, Washington, D.C.

20555, Attention: Director, Division of Operating Reactors.

Dated at Bethesda, Md.. this 27th day of January 1978.

For the Nuclear Regulatory Com-mission.

STAIILEYJ, NowlcKI, Acting Chfaf, Operating Reac-tors Branch No. 3, Dtvtstott of Operatittg Reactors.

(FR Doc. 78-3060 Filed 2-3-78; 8:45 am)

FEDERAL REGISTER VOLe 43r NO 25 MONDAYr FEBRUARY 6 1918

"~

l

G'3b2!i will not result in any significant, envi.

1'on<lien!,al Inlp'<cl, '1nd Lh'll, pursuant, to 10 CFR 51.5(d)(4) an environmental impart.,taLcment or negative declara.

Lion and cnvlronmcntal

Impact, ap-p<'<isal need not be prrparcd in con.

ncction with issuance of this amcnd-menl. For further details with rcspccL to !his action, sco (\\) Lhe appllcailons for <uncndment daLcd May 17, and August

12. 1977,

~(2) hmendmcnt No.

3g to License No. DPIL-20. and (3) the Co<n<nisslon's related Safety Evalua-tion.'All nf these Ite<ns are available for public Inspection at thc Commis-s!on's Public Document Room, 1717 H S!rect NW.. Washington. D.C., and at the Kalamazoo Public Library.

315 South Rose Street, Kalamazoo, Mich.,

49006. A copy of items (2) and (3) may bc ob!,alned upon request addressed to lhe U.S. Nuclear Regu)atory 'Commis.

sion. Washington, D.C. 20555, At!en tion: Director, Division of Operating Rrari,ors.

Dated at Beihcsda.

Md., this 28th day of November 1977.

For l,he Nuclear Regulatory Com.

mi as Ion.

A. Sci IwzNca a,

Chief, Operating Reactors Branch No. I, Division of Op-era tfDg Rcncl ors.

IFR Doc. 77-38157 Filed 12-19-77; 8:45 an>)

t7590-01]

IDockeL No. 50-250]

FLORIDA POWER AND LIGHT CO.

I<<vance of Arnondrnen< lo Faci!Ily Oporallng Licenco The U.S. Nuclear Regulatory Com-mission (thc Commission),

has issued hmn1dmenl No. 30 to Farillty Operat-ing I.!cense No.

DPR-31, issued l,o Florida Power and Light Co., which re-

'lsr.d Technical Specifications for Op.

eration of the Turkey Point Nuclear Generating Station, Unit No. 3, locat-ed ln Dade County, Fla. The amend-mcnL is effective as of the date of issu-ance.

Thc a<nendmcnL will modify operat-Ing limits in the Tcchnical Specifica-tions to allow operation nf Unit Iio. 3 at Lhe orlghml design condition of 2250 psla and 546.2'F inlet.tempera-ture. The changes will also increase the allowable fuel residence time to 27P00 effcrtive fullpower hours.

The application for lhc amendment, complies with the standards and re-qulremcnb of thc Atomic Energy Act of 1954, as amended (the Act), and Lhc Commission's rules and regulations.

The Commission has made appropri-ate findings as required by the Acl, and the Commission's rules and rrguia.

tlons in 10 CFR Chapter I, which arc scl, forth In the license a<ncndment.

Prior public notice of this amendment NOT CES was nol, required sl< ce thc amendment docs not involve a ignlfleant )mgards consideration.

The Commlsslo<

has dctcrmh1cd that thc issuance of this amendrncnt will noL result, in any significant rnvi-ronrnental impact and that, pun)uant I.o 10 CFR 51.S(d)(4) an cnvironmcntal Impart, statement, negative drclaratlnn or environmental hnpact appraisal nccd not. be prepared in connection with issuance, of this amendmcnt.

For further details with,respect lo LhLS action, sec (I) the appllcallon for amendment dated October 4,

1976, which wa." superseded in its entire!.y by letter dated Decembe<

21, 19'I6 (as supplemeni,ed by letters dated Janu-ary 7

and February 16, 1977),

(2)

Amendment No.

30 Lo License No.

DPE3-31, and (3) the CommLsslon's re-lated Safety Evalual,ion. All of thcsc Items arc available for public inspec-tion at the Commission's Public Dont-ment

Room, 1717 H Street, NW.,

Washington, D.C., and at the Environ-mental and Urban Affairs Library, Florida Intenmtional Unlvcrsily.

Miami, Fla. 33199. A copy of items (2)

(3) may be obtained upon request ad-dressed to the U.S. Nuclear 13cgula-tory Commission.

Washington, D.C.

20555, Attent!on: Director, Division of Operating Reactors.

Dated at Bcl,hesda, Md., this 13th dav of December 1977.

For the Nuclear Regulatory Com-n<ission.

Gzoaox Lr~n,

Chief, Opera( fr< g Reactors Branch No. 3 Diufsfon of Opcr-aOng Reactors.

(FR Doc. 77-38158 Filed 12-19-77; 8:45 an>)

[7590-01]

[Dockei Nos. STN 50-498, STN 60-499, STN 60-498A, and STN 60-499A)

HOUSTON LIGHTING 8, POWER CO., ET AL Receip< of Applicaiion for Opora<ing LIconco Houston Lighting & Power Co., on its behalf and as agent forthc cllv of San Antonio, Central Power and Light Co.. and the city of Austin (the appli-cants). pursuant,to section 103 of the Atomic Energy Act of 1954 as amend.

ed, filed with the Nuclear+egulatory Commission (!he Commission) Amen<i.

ment No. 4 to their application to con-s!ruct and oprralc two pressuri".ed walcr reactors known as thc Sout'h Texas Prospect which are located ap.

proximately 15 mlles southwest,of Bay City on the west side of the Colorado River in Matagorda

CouDty, Tcx.

Amendment No. 4 filed on August 24, 1977, contains a general updating of InformaL!on found ln the application and thc latest annual reports for each applicant. Thc applicants request that the application (filed July 5, 1974) as rcvisrd by Amcndmcnt Nos.

1, 2,

3, an<i 4 bc accepted as iircir application for a 40.year op< rating license.

In connection wlLh a petition fil<d by Central Power and Ligl<t Co. re.

qucsLing an anI,ILI>>-t I)raring, lioua ion Llg))LID)I i'~

I'<rw<;r L'I). /II(<l a motion,on p<<bt use 10, Ipff, ivilh the Coma)lssloi) Iri<rsuani lo IU,C:I'13 2.768 for waiver of Lhe requlrrmcnl that a Final Safety Analysis lteport be filed at the same lime as the application for an operating license, in order Lint the review of

'Lhe Mill'trusL Ir"ues could begin.

By Memorandum an<)

Order date<i June

15. 1977 (Houston Light c<:

Power Co., eL al. (South Texas Pro)ect, Unl!, Nos.

1 and 2), CLI-77-13, 5 NRC 1303 (l977)). thc Comnllsslon decided Lhat. Iu<ther consideration of antit< us!,

Issues should lake place in lhe context of an operating lire<use procreding and granird ihe wn!ver lo peru<It early submission of the appiicatlo>> and con-slderal,ion of'these Issues.

On August 25, 1977, thc Office OI Nuclear Etenctor Regulation requested the advice of the Attorney General on the a<rtitrust matters pursuan!

Lo sec tlon 105(c)(l) of the Atomic Encrgv Act <>f 1954.

Nolircs of rcctlpt of the rnnainlng porLlons of the

'<ppllcatlon dealing with rad!ologlcal healLh and safety matters (Final Safety Analysis Rcpori) and envlronmenlal mat!e< s (Envh'onlnental Repol'I ) <vill i)c Out) ~

lisi<c>ublished at lhe appro-priate Iinu!. It is anticipated l,hat the Final Safety Analysis Report and the Envlronnu)ntal Report w!II be subn<it-tcd about hpr II 1978; A copy of the application (Applica-tion and Amen<!men!, Nos.

1 to 4) and tire Con<<nission's Mcmo<andu<u an<i Order, <laled Junc 15, 1977, are a<gil-a!)ie fol'uirllclnspccLlon ai !he Coul-m!as!on s P<lblic Docun)eni,

Iloom, 1717 H Stree!, NW., Wash!>>I:ton, D.C.
2055S, an<! a! the lo<'al public docu.

n<cnt room located In the Maiagcrda County Courthouse, 1700 SevenL)1 Sircct. B~y City, Tex. 77414. Coi!i<s of li<e Co:ninisa!Or s Memorandum an<!

Order. dated June 15, 1977, n:ay br ol> ~

talned by a r"ques! addresd<d to tire Director. Div!sion of Pro]ert liana~<

~

ment.

U,S. Nurlrar Regula'ory C"no< ~

mission, Wmh!ngton, D.C. 20555.

Dated a! Be! hepda. Md.. Ihls 9th dwv of Decrn<ber In77.

For thc Nur!ear Rcrulainry Cnm.

miss! On, Pr.h

< I;. I'A<<11.

CJI ief, I,I2!I(

I\\'Dier J<racfor e J)ranch Xo. J, Dip<sion of Prn.

fret.

Afar<<r gcrr<rn!.

IFILDnr. 'I -:15!59 Flird 12-!9-77: 8.<5 arrr FEDERAL R'EGISTER, VOL 42. NO. 244 TUESDAY, DE(:ElhBER 2n, IPTT

NOTICES The Comndssion has determined that the issuance of this amendment willnot result in any sigxdQcant environmental Impact and that pursuant to 10 CFR 515(d) (4) an environmental statement, or negative declaration and environ-mental impact appraisal need not bo prepared 1n connection with hsuance of this amendment.

For further details with respect to this

action, see (1) the applications for amendment dated March 3. 19VV; June 8, 197V; July 1, 197V, as supplemented; and September 16, 1977, (2) Amendment No.

39 to License No. DPR-28, and (3) the Commission's related Safety'valuation.

Allof these items are available for public inspection at ~e Commission's Public Document

Rooin, 1V17 H Street NW.,

Washington.

D.C., and at the Brooks Memorial Library, 224 Main Street, Brat-tleboro, Vt. A copy of items (2) and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commis-sion, Washington, D.C. 20555. Attention:

Director, Division of Operating Reactors.

Dated at Bethesda, Md., this 30th day of September 1977.

For the Nuclear Regulatory Commis-sion.

MoRzoN B. FaxRzxx,z, Actfnp Chfef, Operatfnp Re-actors Branch No. 4, Division of Operating Reactors.

[PXtDoc.77-30593 Piled 10-19-VV;8:45 aml

[7590-01 ]

IDocket Nos.60-269, 60-270 and 60-2871 DUKE POWER CO.

Issuance of Amendments to Facility Operating Licenses The U.S. Nuclear Regulatory Comnds-sion 'the Commission) has issued Amendment Nos. 47, 47 and 44 to Facility Operating License Nos. DPR-38, DPR-47 and DPR-55, respectively, Issued to Duke Power Company which revised the Tech-nical Speciflcations for operation of the Oconee Nuclear Station, Unit Nos. 1. 2 and 3, located in Oconee County, South Carolina. The amendments are effective as of the date of Issuance.

Those amendments revise the Techrdcal Specifications to establish operating lim-its for Unit 1 cycle 4 operation and tighten leakage limits through the Steam Generator tubes.

Tho application for the hmendments compiles with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act). and the Commis-sion's rules and regulations. The Com-mission has made appropriate findings as required by the Act and the Commis-sion's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendments.

Prior public notice of these amendments was not required since the amendments do not involve a slgnIQcant hazards consideration.

The Commission has determined that the Issuance of these amendments will not result in any signQcant environ-mental Impact and that pursuant to 10 CFR 5 51.5(d) (4) an environmental im-pact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of these amendments.

For further details with respect to this

action, see (1) the application for amendments dated March 30, 1977, as supplemented June 21, August 23, Sep-tember 8. 14 and 24. 197V, (2) Amend-ment Nos. 4V, 47 and 44 to License Nos.

DPR-38, DPR-47.

and DPR-55.

re-spectively, and (3) the Commission'8 related Safety Evaluation. All of these 1tems are available for public Inspection at the Commission's Public Document Room, 1717 H Street, NW., Washington, D.C. and at the Oconee County Library, 201 South Spring St., Walhalla.

S.C.

29691. A copy of items (2) and (3) may be obtained upon request addressed to the U.S.

Nuclear Regulatory Commission, Washington. D.C. 20555, Attention: Di-rector, Division of Operating Reactors.

Dated at Bethesda, Maryland, this 4th day of October 1977.

Por the Nuclear Regulator Commission.

A. Scxrmznczz,

Chief, Operating Reactors Branch No.

1, Dfvtsfon of Operatfng Reactors.

[PXtDoc.V7-30287 Plied 10-19-77;8:45 aml t7590 Ol]

Dockets Nos.60-360 and 50-961)

FLORIDA POWER AIID UGHT CO.

Issuance of Amendments to Facility Operating Ucenses Notice ls hereby given that the U.S.

Nuclear Regulatory Commission (the Commission) has Issued Amendments Nos. 29 and 26 to Facility Operating Li-censes Nos. DPR-31 and DPR-41, respec-tively, issued to Florida Power and Light Company which revised Environmental Technical SpeclQcatlons for operation of the Turkey Point Nuclear Generating Units Nos.

3 and 4, located in Dade County, Florida. The amendments are effective as of the date of issuance.

The amendments will revise the En-vironmental Technical SpeciQcations to authorize deletion of the monthly and quarterly monitoring of the E-series wells from the groundwater monitoring pro-granls.

The application for the amendments compues with the standards and require-ments of the Atomic Energy Act o! 1954, as amended'(the Act), and the Commis-sion's rules and regulations. The Com-mission has made appropriate findings as required by the Act and the Commis-sion's rules and regulations in 10 CFR Chapter 1, which are set forth in the license amendments. Prior public notice of these amendments was not required since the amendments do not involve a significant hazards consideration.

'he Commission has deterndned that the issuance of these amendments will not result in any slgnlQcant environ-mental Impact and that pursuant to 10 CFR 5 51.5(d) (4) an environmental hn-pact statement or negative declaration and environmental hnpact appraisal need not be prepared in connection with issuance of these amendments.

For further detaQs with respect to this action.

see (1) the application for amendments dated February 23, 19V7, as

supplemented by letter dated April 25, 1977, and (2) Amendments Nos. 29 and 26 to Licenses Nos. DPR-31 and DPR-

41. All of these items are available for public inspection at the Comndsslon's Public Document Room, 1V17 H Street NW.. Washington, D.C. and at the En-vironmental and Urban Affairs Library, Florida International University, Miami, Pla. 33199. A copy of item (2) may be obtained upon request addressed to the U.S.

Nuclear Regulatory Comndssion, Washington, D.C. 20555. Attention: Di-rector, Division of Operating, Reactors.

Dated at Bethesda, Maryland, this 7th day of October 1977.

Por the Nuclear Regulatory Commis-sion.

GEoRGE LRAR,

Chfcf, Operating Reactors Branch No, 3,

Division of Operatfng Reactors.

IPXt Doc.77-30288 PXt 10-19-VV;8:46 aml

[7590-01 $

IDocket No.60-391 I GEORGIA POWER CO. ET AL Issuance of Amendment to Facility Operating Ucense The CD. Nuclear Regulatory Comnds-sion (the Commission) has issued Amendment No. 46 to Facility Operating License No. DPR-57 issued to Georgia Power

Company, Oglethrope Electric Membership Corporation, Municipal Electric Association of Georgia and City of.Dalton, Georgia, which revised Tech-n1cal Speculcations for operation of the Edwin L Hatch Nuclear Plant, Unit No.

1, located in Appling County, Georgia.

The amendment is effective as of 1ts date of issuance.

The amendment consists of changes to the Technical SpeclQcations which re-vtses the range listed for the shroud water level indicator shown in Table 3.2-11.

The application for the amendment compiles with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act), and the Comnds-slon's rules and regulations. The Com-mission has made appropriate Qndings as required by the Act and the Commis-sion's rules and regulations In 10 CFR Chapter I, which are set forth in the II-cense amendment. Prior public notice of this amendment was not required since the amendment does not involve a sig-nificant hazards consideration.

The Commission has determined that the Issuance of this amendment willnot EEOERAL REGISTER VOL 42, NO. 203 THURSDAY, OClOBER 20, 1977

l'

REASON FOR CLOSHFGr The ProPossls be-ing reviewed Includo Informntlon of s pro-prletnry or confident!sf

nnture, including tcchnlcnl informstlon; finsncisl dsts, such ss salaries; snd pcrsonsl lnformstlon con-cerning lndlvldusis sssocistcd with the pro-parsls. These mntters are within exemptions (4) snd (6) of 5 U.S.C. 652b(c), Government ln the Sunshlno Act.

AUTHORITY TO CLOSE hfEETINO: This dctcrmlnstlon wns rnndo by the Committee hfsnsgcment omcer pursunnt to provisions of Section 10(d) of Pub. L.92-403. Tha Com-mittee hfsnngcment omcer wss delegated the suthorlty to rnnke such dctermlnstions by the Acting Director, NSP, on February 18, 1917.

M. REBECCA WINKLER, ActirrgCommftfce frfanagerrrcnt Ogiccr.

IFR Doc.77-30183 Filed 10-14-77;8:45 nm I

[ 7555-01 ]

SUBCOMMITTEE ON DEVELOPMENTAL BIOLOGY OF THE ADVISORY COMMIT-TEE FOR PHYSIOLOGY, CEI.LULAR AND MOLECULAR BIOLOGY Meeting In accordance with the Federal Ad-visory Committee Act, Pub. L.92-463 as amended, the National Science Foun-dation announces the followingmeeting:

NAhiE:

Subcommittee on Devclopmentnl Biology of tho Advisory Committee for Physi-ology, Collnlnr nnd Molecnlsr Biology.

DATE AND TIhlE: November 3, 4, snd 5,

1977-9 s.m. Io 5 p.m. each dsy.

PLACE: Room 321, Nntlonnl Science Foun-dstlon, 1800 O Street NIV.~ Wnshington, D.C.

20550.

TYPE OF hlEETINO: Closed.

~s CONTACT PERSON:

Dr. hfsry E. Clutter, Program Director for Deveiopmcntnl Biology, Boom 326, Nntlonsl

, Science Foundntion, Wsshlngton, D.C.

20550; telephone 202-632-4314.

PURPOSE OF SUBCOhfhfITTEE: To provide sdvico snd rccommendstions concerning support for resesrch hr dnvelopmcntnl biology.

J AGENDA.'To review snd evnluntc rcscsrch proposals as part of the sclcctfon process for swsrds.

REASON FOR CLOSING: The proposals be-ing reviewed Includo informstlon of n propri-etary or confidcntlsl nsture, hrcluding tech>>

nlcsl Informntlon; nnsnclnl dntn, such ns salaries; nnd pcrsonsl lnformstlon concern-ing Indlvldunls sssocisted with tim proposals.

Theso mstters sro within exemptions (4) nnd (6) of 5 U.S.C. 552b(c), Government In the

~ sunshnm Act..

AUTHORITY TO CLOSE hlEETING: This deicrmlnstlon wns mnde by tho Committee hfsnngcment Omcer pursunnt to provisions of Section 10(d) of Pub. I.92-463. TIro Com-mittee hfnnngcment Oillccr wss dclegntcd the snthorny to msko such dctcrmlnstlons by tho Acting Dlrccior, NSF, on Februsry 18, 19'17.

Dated: October 12, 1977.

M. REBECCA WINKLER>

AcffngCornmfttcc hfanagcmcnt Oi)leer.

IPR Doc.77-30184 Filed 10-14-V7;8:45 sm J

~

NOTICES 555-01 $

ADVISORY COUNCIL; TASK GROUP NO. 2 Meeting In accordance with the Federal Ad-visory Comnrlttee Act, Pub. L.92-463, the National Science Foundation an-nounces the following meeting:

NhhfE! Task Group No, 2 of the NSP Ad-visory Council.

PLACE: Boom 421, Nstlonnl Science Foun-dstlon, 1800 Q Street NW., Washington, D.C.

20550.

DATE: November 2, 1077.

TIhlE: 9 s.m.

TYPE OP MEEI'ING: Open, CONTACT PERSON:

hln. hfsrgsrot L Wlndus, Executive Secre-tary, NSP Advisory Conrrcli, Nstlonsl Sci-onco Foundstlon, Room 518, Washington, D.C.

20550; telephono 202-032-4384.

PURPOSE OF TASK GROUP: The purposa of tho Task Group, composed of members of tho NSP Advisory Council, is to provide the full Council with s mechanism to consldor numerous issues of intcrcst to the Council that have bccn nsslgncd by the Nntionsl Science Foundation.

SUhthfARY hfINUTESr htsy ba obtained from the Committee hfnnngcment Coordlnstlon Staff, Dlvlslon of Porsonnol snd Mnnsgcment, Boom

248, Nstionnl Scisnce Poundstlon, Washington, D.C. 20550.

AGENDA: To Identify snd rovlow thc wnys non-scientists now pnrtlclpsic in tho for-mntlon of iho nstlon's science policy, the present.nrrnngements for involving tho pub<<

llc ln the developmont of Foundntion poli-cies, nnd suggest possible new nppronchcs or Improvements in NSP prnctfccs.

Dated: October 10. 1977.

M, REBECCA WIHKLER, AcffrrgComrnfttec Managcmcrrt 0fflcer.

IPR Doc.77-30186 FIled 10 14-77;8:46 sml

[ 7590-01 ]

NUCLEAR REGULATORY COMMISSlON IDockot Nos.60-250 snd 50-251)

FLORIDA POWER AND LIGHT CO."

issuance of Amendments to Facility f Operating! Jcenses The U.S. Nuclear Regulatory Com-mission (the Commission) has issued Amendments Nos. 28 and 25 to Facility Operating Licenses Nos. DPR-31 and DPR-41, rcspectlvely, issued to Florida Power and Light Company which re-vised Technical Specifications for op-eration of the Turkey Point Nuclear Gen-erating Units Nos.

3 and 4, located in Dade County, Florida. The amendmcnts are effective as of the date of issuance.

The amendmcnt consists of changes to Tcchnical Speclflcatlon 4.4.6 cover-ing Tendon Surveillance for Turkey Point Units Nos. 3 and 4.

The application for the amendments compiles with the standards and re-quirements of the Atomic Energy Act of

1954, as amended (the Act), and tho 55501 Co on's rules and regulations. The Comm ion has made,appropriate find-ings as required by thc Act and the Commission's rules and regulations in 10 CFR Chapter I, which are sct forth in thc license amendments.

Prior pub-lic notice of these amendments was not required since the amendments do not involve a significant hazards considera-tion.

The Commission has determined that the Issuance of these amendments will not result ln any s)gnlficant environmen-tal impact and that pursuant to 10 CFR 51.5(d) (4) an environmental 'mpact statement or negative declaration and environmental impact appraisal need not be prcparcd in connection with issu-ance of these amendments.

For further details with respect to this action, see (1) the app)lcailon for amendments dated September 21, 1977.

as supplemented by letter dated Septem-ber 29, 19VV, (2) Amendments Nos. 28 and 25 to Licenses Nos. DPR-31 and DPR-41, and (3) the Commission's re-lated Safety Evaluation. All of these items are available for public inspection at thc Commission's Public Document Boom, 1717 H Strcct NW., Washington, D.C. and at thc Environmental and Urban AIIai'rs Lib'rary, Florida Interna-tional University, Miami, Florida 33199.

Acopy of items (2) and (3) maybe ob-tained upon request addressed to the U.S.

Nuclear Regulatory Commission, Wash-ington, D.C. 20555, Attention: Director.

Division of Operating Reactors.

, Dated at Bethesda, Md., this 4th day of October 1977.

For the Nuclear Regulatory Commis-sion.

GEORcE LEAR>

Cfrfef, Operating Itcactors Branch No. 3, DIvision of Op-eratfrrg Reactors.

IFR Doc.77-29940 Piled 10-14-77;8:45 sm I

[ 7590-01 ]

ILlcenso No. SNM-1265l GENERAL ELECTRIC MORRIS OPERATION, Request for Order To Stay Shipment of Spent Fuel Notice ls hereby given that by petition dated September 16, 1977, the State of Illinois requested that shipments of spent fuel to the General Electric Com-pany, Morris, Illinois, be stopped and that the Commission begin preparation of an environmental impact statement on the conversion of tho General Elec-tric Midwest Fuel Recovery Plant at Morris into a long-term storage facility for spent fuel. In.accordance with the procedures specified ln 10 CFR 2.200 ap-propriate action will be taken on this rcqucst within'a reasonable time.

A copy of the I~quest Is aVallable for Inspection and copying in the Commis-sion's Public Document Room, 1'll'I H

Street, NW., Washington, D.C.
20555, and at the local Public Document Boom at the Morris Public I,lbrary, 604 Liberty St., Morris, III. 60451.

FEDERAl REGISTER, VOL. 42, NO. 20~ONDAY, OCTOBER 17, 1977

N

Commfssfon's related Safety Evaluation.

"'ll of these items are avaHable for pub-Hc inspection at the Commission's'PubHc the U.S. Nuclear Regulatory Commis-sion, Washington, D.C. 20555, Attention:

Director, Division ot'Operating Reactors.

Dated at Bethesda;

Maryland, tMS Por the NucIear. Regulatory Commtsr sion.

GEoRCE LEARN CMefOperattnp -

Reactors Branch No 3,

DivfsfoIL of Operattnp Reactors.

IDoc)ret No. PIN QM84I NORTHERN STATES POWER CO." OF MIN-NESOTA AND NORTHERN STATES POWER COMPANY OF WISCONSIN, ET Af Availabilityof Final Environmental'tatement forTyrone Energy Park Pursuant to the National Environ-mental PoHcy Act of 1969 and the United States Nuclear Regulatory Commission's:

regulations in 10 CPR Part 51, notice fs-hereby. given that the Final Environ--

mental Statement prepared by the Com~

mission's Office of Nuclear Reactor Reg-ulation related to the proposed Tyrone"

~ergy Park to be constructed by the cq appHcants Northern States Power Com-pany of Mnesota, Northern States Power Company of Wisconsin,

~ Cooperative-Power Association, Dafryland Power CO-operative. and the Lake Superior District Power Company, fn Dunn County, Wis-consin, ts avaHable for inspection by the.

pubHc fn the Commission's PubHc Docu-ment Room at 1717 H Street NW.. Wash-ington. D.C., and fn the Stout Library, University of Wisconsin, Menonomfe, Wisconsin.

The Final 'nvironmental Statement fs also being made avaflable at the State Clearinghouse, Bureau of Plannfng and Budget, Department of Admfnfstratfon, State Oflfce Building, 1 West WHson Street, Madison, Wfsconsfn.

and. the %'est Central Wfsconsfn-Re-gional Planning Commission, 'l31 Oxford Avenue, Eau Clafre, Wisconsin.

The Notice'of AvaHabHlty of the Draft Environmental Statement for the Tyrone Energy Part and requests for comments from fnterested persons was pubHshed fn the FESEEsz.

RzczsTEE on July 6, 1976 (41 PR 27'l89). 'Ilie comments received from Federal, State, and local agencies 4

21670=;

NOTICES.

~

~

of information contained fn the Centr SOUTHERN NINTH CIRCUIT OF UNITED mental impact statement or-negative Records."

System.

These dupHcatfve '

STATES CIRCUIT JUDGE NOMINATING declaration and environmental fmpact.

records fallinto the followingcategories:

'COMMISSION

=

appraisal need not be. prepared fn con-(1) L1stlngs of fndlvfduals used to as- -',, Schedule of MeeHngs nectfon. with issuance of these-amend-sist in the locatfon and apprehension of ments.

fndfvfduah for whom legal process 1s The scheduleof meetin8s of the noml-For further detaHswithrespect to this outstanding (fugitfves);

nating panel forthe Southern NinthCfr-'ction, seel (1)

The appHcatfon'oz".

(2) Listings of individuals used fn the.'- cuit of the United States Circuit Judge amendments dated May 21 1976 (2) identtflcation of particular offenders in Nomfimt Ut Com"Hssfon fs as foHows:

. 'mendments No. 24 and 23 to Lfcenses casea where the FBI has jurisdiction.

1. The nrst meeting wiu bo heid on May 9; Nos. DPR-31 and DpR-41, and (3) the.

Theae liSttngS inClude VariOuS PhOtO-1977 at 9:3O a~. In the court room cf tho graph albumS and backgreund data COn-U~. Court of Appeals cn the 16th Iiocr of the cerning persons who have been formerly UJS Courthouse, 312 North Spring Street, c

g w

apa c

har ed 1th rti ularcrimeandwho 8 '

c lifcrnfa'Tho ~p<<o fs Document

Room, 1717 I Street NW.,

meeting is to discuss procedures and criteria may be, suspect h

sb Har cri inal ac-for nocti g candidates and to dl ~

Washington. D.C., a d at the E viron-tivities; and photographs of individuals prcsp<<tive csndids<<s; mental + Urban Affairs Library. Plorida who-are unknown but suspected of ln-

~2. Tho second meeting wlilbe held in the Internatfonal University. Mami, Plorfda volvement fn a particular criminal ac-court room of tho UA. courthouse in Las 33199. A copy of items (2) and (3) may ttvttys fOr. eXamPle, 'bank-SurVeHlanCe Vegae, NeVada. May 27, 1977 at 10 a.m. The be Obtained uPOn requeSt addressed tO ~.

puzpceo of tha meeting'will bo-to Interview

"(3).~t gs"of RdivfduM as pa*o 3

an'overaH criminal fnteHfgence effort by IO29 of the Iya. Fedeml Court Building h the FBLTilts WOUld inclUde photograph phcenhr. Arizona, on Msy 29, 1977 st 9:30 am.

albums lists of individuals known to be.

Tho puzpcs<<f t'ho m<<ting wlu be to in<<,

20th day of APZH 1977.

involved in cz'inlfnal actfvftyi including',view candidates...

theft from &%mt e shfPmm~ ~ter These meetings wHI not be open to the state. transportation of stolen proper y, '-PubHO pursuant to Pub Q 92~63 and individuals fn the uppex echelon of (D) as amend&. (Cf; 5 Ucf.C, 552b(c) organized crhne; (4) Listings of indivfdUals in connec-, '...

tton'with.the FBI's mandate to carry o Presidential directives on'anuary 1943,.JuLy'-24, 1950, December 15, 1953.

=

anapenien cer.

'and February 18, 1976, WhICh deSignated Pzt Dcc.VV-IRISS riled 4-27-77;Sidd aml

~

. the FBI to carry out investigative work NUCLEAR REGULATORY t@R, and foreig countertnteHfgence.,

COMMISSION These Hstings may include photograph'.',~

albumS and Other HstfngS. COntafnfng.

+ IDcckets Ncs.de-2SO and SO-2SII FLORIDA POWER AND LIGHT'CO.

This would include lists of fdefltffledandi suspected foreign fnteHfgence agents and Issuanco of Amendments to Facility Operating Licenses.

". (5) SPecial Indices dupHcatlve of the The U.S. Nuclear Regulatory Commts-central indices used to access the Central sion (the, Commission) has t ued Records System have been created from Amendments Nos 24 and 23 to PacHfty eto time in conjunction with the Operating LfcenMS* No. DP~I and admfntstratfon and fnvestf8atlon of ma-DRP~I, respectively, issued to Florida=

jor,~m. Thf duPHcatfon and seg~-

powerandLfghtcom'p~whfd,revt d

gatton,. f~fHt t ~~

to. document Technical Specfft,atfons for 0~ration of prepared tn connection wN1 major cases-the Turkey pofnt Nuclear Generating

~some of the information contained tn Units Nos.3 and 4, located in Dade Coun-the 'main flles has also been extracted ty, Florida. The-amendments are effec-and.placed on computer to enable vari-tive as of the date of issuance ouszdfvfsfons to retrieve information These amendments consfstof changes more;rapidly by avoiding the need <<r 'to the Technical Speclflcatlons which a manual search for information main-millchange the reactor coolant pressure-tafned;fil the main fHes. For examPle temperature Hmfts to account for neu-sfnce,.fnvestfgatfon of major frauds re-tron irradiation induced increases in re-quires the Agent to coHect and organize actor vessel metal nH ductHity tempera-:

~

massfve volumes of evidence and other investigative information, the PB1 fs us-The appHcatfon for the amendments fng computers to do this ln a more ac-compHes with the standards and require--

curate, and expedltlous manner.

Addi ments of the Atomic Energy Act of 1954, tionaHy,".Agents occasfonaHy seize evt=

as amended (the Act), and the Commls-'ence'fn computerized form and PB<

~ sion's rules and regulatfons. The Com-computers are used to organize and sort mission has made appropriate flndfngs-the informatfon in preparation for trfaL as required by the Act and the Commls-Also, personnel type information deal-sion's rules and regulations in 10 CFR tng with such matters as attendance and Chapter L which are set forth in the li=

production and accuracy requirements fs cense amendments.

Prior pubHc notice.

maintained by some divisions..

- 'f these amendments was not required AprH 16 1977

' 'ince the amendments do not involve a signtflcant hazards consideration.

The Commtssfon has determh'ed that,

.Xcttnpatto" pa

." the issuance of these amend ents wH1 Id',Dcc.77-12097 Piled 4-27-77;3143 sml nOt reSult in any, SigniflCant enVtrOn-:

'"w-:

1 1

PEDERAL REGIsTER,, voL. 42No. 32 IHURsOAY,.APRIL 23, 19yy.,

P C,+

h

~I

I lt l

w cense ee anagement ranch Office of'dmini ation

'ACILITYANENOI'IENT CLASSIFICATION s

Applicant:

License No.(s}

9P Application Dated:

t.NLLVDUM.

trail Control No:

(pea:n fa gyro/> p gad Fee Remitted yes.

3 Z'~)

Applicant's Fee Classification:

Class

. I, II,

III, IY, Y,

YI,~(lone

/'mendment No:

Date of Issuance

~

~

~

~

~

~

~

1.

This application h

been reviewed. by DOR/DP!1 in accordance with Section 170.22 of Part 170 and is properly categorized.

2.

This application is incorrectly classified 'nd should be properly categorized as Class Justification for reclassification:

3.

Additional information is requ",r d to properly categorize the license mmmm Jm

~ 4

~

Will I I'IIIII~ 'I s t

~

~ I The application was filed (a) by a nonprofit. educational institution, (b) by a Government agency,~c)pursuant to written I'lRC reco."..".. nda-tions and the amendment will be issued for the convenience of the Commission, and (d)@Other (state reason thereforj:

z, zo4-g

'tra r 'c2aer '-/2 yd D vision of pefat> ng Reactors/Project,,~nage.-.eni O<'.To'. p,. ~h~~en e-co<<- I c,, 'o-95'as' Qeclc; c 'F'k.

Io'P~

Q ~g+~QVLOP, Pt ~~

mate..<. ~J)~...;......

Timo. 'J,.i.t ~;,............

5.

This application has been reviewed and is exempt from fees.

. ) C,iq,iI';;~ ('l.-(I L.

William 0. Hiller, Chief License Fee Hanagement Branch RECEIVED BY LFMB gizc i7S'

1 I

~R RECT

+4

~o n

C 0

+n

~O

++*++

Docket N

. 50-26O/

51 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 June 8. 1978 STR ON ockets 0

ding CParrish Docketing and Service Section Office of the Secretary of the Commission sUBJEGT:

FLORIDA POWER 8I LIGHT CO%PAN (Turkey Point 3 It 4)

Two signed originals of the Federal Register Notice identified below are enclosed foryour transmittal to the Office ofthe Federal Register for publication. Additional conformed copies (12

) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availabilityof Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s);

Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availabilityof NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availabilityof Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

0 Notice of Issuance of Facility Operating License(s) or Amendment(s).

0 Other:

Order for Modification of License

Enclosure:

As Stated Office of Nuclear Reactor Regulation OFFICE~

SURNAME~

....pI) R.;.988ie!.l.

Parrish:lb DATE~

NRC FORM 102 II.76) 6/8/78

I I

'I t:

L J

b

4'ERO c"

0 Cy O

+n

~O

+W*k+

UNITED STATES NUCLEAR REGULATORY COMMISSION

~

WASHINGTON, D.C. 20555 7590-01 DISTRI 8 UTION Dockets(2)

ORB¹1 Reading

'Parrish Docket No.

0-250 5 50-25]

fhy 26, 1978

. Docketing and Service Section Office of the Secretary of the Commission

SUBJECT:

FLORIDA PIJER 5, LIGHT COMPANY (Tur key Point 3 5 4)

Two signed originals of the Federal Register Notice identified below are enclosed, foryour transmittal to the Office of the Federal Register for publication. Additional conformed copies ( 12) ofthe Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application forConstruction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availabilityof Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to.Facility Operating License.

0 Notice of Receipt of Application for Facility License(s);

Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availabilityof NRC Draft/Final Envirorimental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availabilityof Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

l9Notice of Issuance of Facility Operating License(s) or Amendment(s).

QOth<<.

Referenced document has been sent to PDR.

Enclosure:

As Stated Office of Nuclear Reactor Regulation x27433 PRE 5/26/7P 1

DATE~

NRO FORM 102 (1.76)

ORB¹1 CParrish 5/gQ/78

I F

I t',

if/

F t ~

~

~F,R RE'q1 0

Cy 0O C

~e 4~

~O

++*++

Docket No.

5O-25O 50-25)

~

UNITED STATES NUCLEAR REGULATORYCOMMISSION WASHINGTON,-D.C. 20555 Nay 15, 1979 DISTRIBUTION bRBl Rdg CSParrish

-2 251 Docketing and Service Section Office of the Secretary of the Commission

SUBJECT:

FLORIDA POINTER AND LIGHT COtPANY (TURKEY POENT 3 8I 4)

Amendment Hos. 48 and 40 Two signed originals of the Federal Register Notice identified below are enclosed foryour transmittal to the Office ofthe Federal Register forpublication. Additional conformed copies (12

) of the Notice are enclosed for your use, 0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt ofPartial Application forConstruction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availabilityof Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s);

Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availabilityof NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availabilityof Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

+Notice of Issuance of Facility.Operating Licensegggggmendment(s).

0 Other:

Enclosure:

As Stated Office of Nuclear Reactor Regulation OFFICE~

SURNAME~

DATE~

NRO FORM 102 (I 76)

DOR: ORB1 CSParrish:j Q.5/.1.5/,79....,......,..

0:

. ~

'J I

e I

S 4

y ll

I-

<~p',R RECy~

cket No

. 50-250 NUGLEAR REGULATQRYcoMMlssloNCSParri sh WASHINGTON, D.C. 20555 0Rg]

'F+*++

April 25, 3979 Docket No. 50-250 50-251 Docketing and Service Section Office of the Secretary of the Commission

SUBJECT:

FLORIDA POHER AND LIGHT COIIIPANY - TURKEY POINT 3 8I 4 Amendments 46 and 39 Two signed originals of the Federal Register Notice identified below are enclosed foryour transmittal to the Office of the Federal Register for publication. Additional conformed copies (

) ofthe Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s),

0 Notice of Receipt of Partial Application forConstruction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.'

Notice of Availabilityof Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s);

Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availabilityof NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization 0 Notice of Availabilityof Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

g Notice of Issuance of Facility Operating License@)g Amendment(s).

g3 Other:

Enclosure:

As Stated Office of Nuclear Reactor Regulation OFFICE~

SURNAME~

DATE~

NRC FORM 102 {1.76)

DOR:ORB1 g

'CSP'a'ri'i'sh': jb 04/g7/79

1 1

J tl f

~y Ii I

p I I ca i e 50-250 NUCLEAR REGUiATCRT coMMleetoN ORB81 Reading WASHINGTON, D.C. 20555

++*++

Docket No.50 250 Apr$1 3, 1979 Docketing and Service Section Office of the Secretary of the Commission

SUBJECT:

FLORIDA P01$ ER AND LIGHT COMPANY (TURKEY POINT 3 5 4)

Two signed originals of the Federal Register Notice identified below are enclosed foryourtransmittal to the Office of the Federal Register forpublication. Additional conformed copies ( 1Z ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application forConstruction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availabilityof Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s);

Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice

~ of Opportunity for Hearing.

0 Notice of Availabilityof NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availabilityof Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

)D Notice of Issuance of Facility Operating License@)$ Amendment@

0 Other:

Enclosure:

As Stated Office of Nuclear Reactor Regulation OI-FICE~

SURNAME~

DATE~

NRC FORM 102 (1.76) 8HDO Bl CgP 04/P'

li g,,

~. '

.~+.,

P f7~69Pi) 'TATBQ~

1 F

1 V

h 4

.'T~

18 o~P

~~: ~~

>-. "' '.NUCLEAR"REGULATORYBPMMIRI CSParrish WASHINGTON, D.C. 20555 March 23, 1979 Docket No 50 250/251 Docketing and Service Section Office of the Secretary of the Commission SUBJECT FLORIDA POWER AND LIGHT COI'1PANY (TURKEY, POINT 3 8I 4)

I Two signed originals of the Federal Register Notice identified below are enclosed foryour transmittal to the Office of the Federal Register for publication. Additional conformed copies ( 12 ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s),and Operating License(s).

0 Notice of Receipt of Partial Application forConstruction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.'

Notice of Availabilityof Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s}; Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity, for Hearing.

0 Notice of Availabilityof NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

'i 0 Notice of Availabilityof Safety Evaluation Report.

Q Notice of Issuance of Facility Operating License(NIXr Amendment(s).

A'l1 referenced documents have been rovided to the PDRs.

Enclosure:

As Stated Office of Nuclear Reactor Regulation OFFICE~

SURNAME~

DATE~

IIRC FOAM 102 (1 76)

DOR:ORB CS Parrish:j 03/23/79

~w w ~-

" 'l

.Q!~

4 f&T,I(4~'2:, ~

>>,...p.

phd f'~ A" bQ f'~ 0" b

/

> ~

m H

4 1

E f'

I' I

l II p

j

"*<I A 4I g 1 S

gF.R RE'CU~"'O' W~*y+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 March 5, 1979 ISTRI'BUTION

)ocket Fs s 50-250 an CSParrish ORBl Rdg Docket No.

50-250 50-251 Docketing and Service Section Office of the Secretary of the Commission SUBJFCT FLORIDA POIJER AND LIGHT COMPANY (TURKEY POINT 3 5 4)

Two signed originals of the Federal Register Notice identified below are enclosed foryour transmittal "to the Office of the Federal Register forpublication. Additional conformed copies ( 1Z ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application forConstruction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availabilityof Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to'Facility Operating License.

0 Notice of Receipt of Application for Facility License(s);

Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availabilityof NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availabilityof Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

XZ,Notice of Issuance of Facility Operating LIcense(sgim(Amendment(s).

All referenced documents have been provided to the PDRs.

Enclosure:

As Stated Office of Nuclear Reactor Regulation OFFICE~

SURNAME~

DATE~

NRC FORM 102 II-76)

DOR'ORB1

CSParrish: jb, 03/05/79

4 4

P

0 P

I

~

AJ W

I II

WR R6<O

~o Cy 0O I

++*++

Docket No.

50-251 DISTRIBUTION UNITED STATES Docket File 50-250 NUCLEAR REGULATORY COMMISSION and 1

WASHINGTON, D.C. 20555 ORB1 Rdg CSParrish Vm /

/9'7$

'ocketing and Service Section'ffice of the Secretary of the Commission

SUBJECT:

FLORIDA POWER AND LIGHT COMPANY (Turkey Polnt 3 8 4)

Two signed originals ofthe Federal Register Notice identified below are enclosed foryour transmittal to the Office of the Federal Register for publication. Additional conformed copies (

) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s) 0 Notice of Receipt of Partial Application forConstruction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availabilityof Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt'of Application for Facility License(s);

Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availabilityof NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availabilityof Safety Evaluation Report.

0 Notice of Issuance of 'Construction Permit(s).

0 Notice of Issuance of Facility Operating License(s) or Amendment(s).

IXI Other:

A11 'refe enced d

Enclosure:

, As Stated Office of Nuclear Reactor Regulation OFFCE~

SURNAME~

DATE~

NRC FORM 102 0 76)

..QQR;..0861,.......

CSParrish:j

-'-1'1'/--'"'j-78"

0 1'll 4 N

P P

ltl

+~ +>>*++

Docket No.

50-250 DISTRI BUTIO ocket F

es 502-50 UNITED STATES CSParrish NUCLEAR REGULATORY COMMISSION WASHINGTON, D,C. 20555 November 2, 1978 Docketing and Service Section Office of the Secretary of the Commission

SUBJECT:

'LORIDA P01<ER AND LIGHT COMPANY (TURKEY POINT, UNIT NO. 5)

Two signed originals of the Federal Register Notice identified below are enclosed foryour transmittal to the Office ofthe Federal Register for publication. Additional conformed copies (

) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application forConstruction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availabilityof Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License 0 Notice of Receipt of Application for Facility License(s);

Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availabilityof NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availabilityof Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

0 Notice of issuance of Facility Operating License(s) or Amendment(s).

5] Other:

Referenced d

Enclosure:

As Stated Office of Nuclear Reactor Regulation OFFCE~

SURNAME~

DATE~

NRO FORM 102 0 76)

DOR:ORB1 CSP'arr'is)i: jb

'IQ'+78'

r t

E 3

d g

II g ~

l ll

gp,R REOOg

~o Cy 0O I

~O

+)t *++

Docket N 60 250/

51 UNITED STATES NUCLEAR REGULATORYCOMMISSION WASHINGTON, D.C. 20555 August 7, 1978 TION Doc ORBgl Reading CParrish Docketing and Service Section Office of the Secretary of the Commission SLIfgEc7 FLORIDA POlfER 81 LIGHT COMPANY (Turkey Point Units 3 5 4)

Two signed originals of the Federal Register Notice identified below are enclosed for~our transmittal to the Office ofthe Federal Register for publication. Additional conformed copies (1< ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application forConstruction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availabilityof Applicant's Environmental Report.

ixl Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s);

Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availabilityof NRC Draft/Final Environmental Statement.

'J 0 Notice of Limited Work Authorization.

0 Notice of Availabilityof Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

0 Notice of Issuance of Facility Operating License(s) or Amendment(s).

0 other.

P1ease insert date for 30-day intervention period and inforilt ee erry o

e a e nse e.

a e o

e nser e

C.NR~W

Enclosure:

As Stated Required pub1ishing date Mednesday August 9,XN 'l978.

W)~E Office'of Nuclear Reactor Regulation DFFFOE~

SURNAME~

DATE~

NRC FOAM 102 (1.76)

DOR:OR881

..CP..ar,.r..i.sh,:.1,h...,.

....8/7/,78..

\\

il 1

~

~,

I" t

'L

~

~

\\

4 w

'b c

L

~P.R RECU

~o Cy 0O I

O Cy

+~

gO

+>>*<<+

Docket No.

5O<<25O~

and 50-251M UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 November 6, 1978 DISTRIBUTION

, DOCKET F 50-250 AND ORB1 Rdg CSParrfsh Docketing and Service Section Office of the Secretary of the Commission

SUBJECT:

FLORIDA PONER AND LIGHT COMPANY (Turkey Point, Units 3 and 4)

Two signed originals of the Federal Register Notice identified below are enclosed foryour transmittal to the Office ofthe Federal Register for publication. Additional conformed copies (

) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application forConstruction Permit(s) and Facility License(s); Time for Submission of Views on Antitrust Matters.

0 Notice of Availabilityof Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s);

Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availabilityof NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availabilityof Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

0 Notice of Issuance of Facility Operating License(s) or Amendment(s).

9 Other:

Enclosure:

As Stated Office of Nuclear Reactor Regulation OFFCE~,

SURNAME~,

OATE~.

NRO FORM 102 (1 76)

DOR:ORB1

'-CSPar"r" i'sFi

'..1.1./,6/.7.8.....,.....

P 1

r 4

'r

GPR REQII P

~4 0

co tg Docket Ng.

@-mfa'NITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 November 20, 1978

/

DISTR IBUTION Dockets 50-250/251 ORBIIIl RF CSParrish Docketing and Service Section Office of the Secretary of the Commission r

GtffkfEDT; PI+IIIPI tNO I IGNI Ilfpftffy (TURKEY POINT NUCLEAR Two signed originals of the Federal Register Notice identified below are enclosed for your transmittal to the Office of the Federal Register forpublication. Addiiional conformed copies

(

of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application forConstruction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availabilityof Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

s 0 Notice of Receipt of Application for Facility License(s);

Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availabilityof NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availabilityof Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

0 Notice of Issuance of Facility Operating License(s) or Amendment(s).

Dt Other: Referenced. documents have been ro ided to the P Rs.

Enclosure:

As Stated Office of Nuclear Reactor Regulation OFFICE~

SURNAME~

DATE~

NRC FORM 102 I1.7BI OR:ORB81/LA CSParrish:pa 11/A/78

f h

I

~

f

)

1' U

V D

U

gP,R REGIj

~o Cy

(

0'g 0((eke(

0.

5IL25~0.

and GO-251 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON( D.C. 20555 November 7, 1978 Docketing and Service Section Office of the Secretary of the Commission SUBJECT FLORIDA POWER AND LIGHT COMPANY (TURKEY POINT 3 5, 4)

Two signed originals of the Federal Register Notice identifiedbelow are enclosed foryour transmittal to the Office of the Federal Register for publication. Additional conformed copies (

) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application forConstruction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availabilityof Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s);

Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of IssUance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availabilityof NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availabilityof Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

0 Notice of issuance of Facility Operating License(s) or Amendment(s).

Ql Other;

///I(."!Z.

Enclosure:

As Stated Office of Nuclear Reactor Regulation OFFICE~

SURNAME~

DATE~

NRC FORM 102 0 76)

DOR:ORB1 CSParrish:g 11/07/78

~. ~

w I

6F,R RECU 0

co t

oO tttt

~O

+**+4 Docket No. 6 ~26 UNITED STATES NUCLEAR REGULATORYCOMMISSION WASHINGTON, D.C. 20555 flarch 24, 1978

=r ib ion ckets OR eading CParrish Docketing and Service Section Office of the Secretary of the Commission

SUBJECT:

FLORIDA POllER 8 LIGHT COflPANY (Tnnkey Point Units 1 and 2)

Amendments 34 and 28 Two signed originals of the Federal Register Notice identified below are enclosed foryour transmittal to the Office of the Federal Register forpublication. Additional conformed copies ( "< ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s) 0 Notice of Receipt of Partial Application forConstruction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availabilityof Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s);

Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availabilityof NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availabilityof Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

gl Notice of Issuance of Facility Operating License(s) or Amendment(s).

g Other. Referenced documents have been provided PGRs.

Enclosure:

As Stated Office of Nuclear Reactor Regulation OFFLE~

SURNAME~

DATE~

NRC FORM 102 I1.76)

DOR: ORB Ill CP.a.r..r..i.sh.:-1 3/24/78

\\

N 4

l I

~ 'E J-V

=

~

fF 1

't 4

JUL' 8 197&

NENORANDUII FOR:

A1 Schwencer,

Chief, ORB B
FROHh,

SUBJECT:

Paul S. Check, Chief', Reactor Safety Branch, DOR SINGLE FAILURE ON TURKEY POINT, UNHS 3 AND 4 In our review of the inservice testing program of valves for Turkey Point 4, we have identified a single failure in Turkey Point, Units 3 and 4, that could prevent the required ECCS flm from entering the vessel.

As shown in Drawing FPSL No. E-503185-7, Rev. 6, and RSAR Figure 6.2-1, Rev. 33, the tin Residual Heat Removal pumps normally inject ECCS flow into the three cold legs through valves 3-744A and 3-744B (for Untt 4, 4-744A and 4-7448). If there is a passive failure which prevents injection through this normal pathe then normally closed valves 3-863A, 3-863B and 3-872 can be opeaed to allow flow to one of the cold legs.

Furhhermore, in the hot leg recirculation mage, which is achieved about 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after the LOCA, valves 3-863A and 3-863B must be opened.

The single failure that we have identified is the spurious opening of 45Ãhr valve 3-863A or 3-8638 during the injection mode.

This could divert fIow,.

through these valves to either the Refueling Water Storage Tank ot /he due/ion og /he RHR pumps.

In either event. it is nest Hear that suC'ficient water is entering the vessel.

A possible way of correcting this apparent problem is by looking out power to valves 3-863A and 3-863B (For Unit 4, 4-863A and 4-863B).

We We have brought this situation to the licensee,'s attention and he ageees that we have a valid concern.

OFiginal SiiPCIi bX FOES 0 W Paul S.;Check, Chief Reactor Safety Branch, D

Division of Operating Reactors cc:

V. Stello F. Coffman

8. Weiss C. Berlinger H. Grotenhuis C.

Cheng V. Nerses L. Olsban 772870357 Distribution:

Central File RS Reading PCheck OPPICd~

OURNAMd~

DATd~

RS/DOR han:

pmj 6g8/7S NRC FGRM 318 (9-76) NRCM 0240 RS/DOR-FCoffma 6JM7S RS PCheck eX>>s k V, 5, OOVRRNMRNT PRINTINO OPPICd> IOTO 42lM24

j

~

a 1

I

~

~

~

II

~ g 1

a lttp

'a Ja Lh a

P I'8 a I~,

Ja

'H it 1

I I <7 '

ff I

7 P<

I II

paa F' g

I fQI f,

~

~

a I t

~,,

I e

a a

-1 I'

~j P

It I

a JI a

cap p

I'a t P e

I J

JUM. l N78 Docket Hos -'-25

&~50- 51 Q<<40,'r S0- R->0 D

RIBUTION:

ocket Files (2) gAB Projects gAB Chron. File

,, DJSkovholt, DPh1 RCDeYoung, DPI FLiederbach, gAB

AGarland, gAB fiiBIORAHDUH FOR:

Malter R. Butler, Plant Systems Branch, Division of Operating Reactors FROhji SUBJECT

REFERENCE:

Walter P. Haass, Chief, guality Assurance

Branch, Division of Project htanagement FPL STEAN GENERATOR REPLACEMENT FOR TURKEY POINT UNITS 3

8I 4.

EYALUATION OF FLORIDA POWER 5 LIGHT COMPANY (FPL)

RESPONSE

TO REQUEST FOR ADDITIONAL INFORL@TIOH ON (EQUALITY ASSURANCE Memorandum - C. J. Heltemes, Jr. to Walter R. Butler, Dec. 27, 1977.

"FPL Steam Generator Replacement-Request for Additional Information, guality Assurance The gull,sty Assurance Branch (gAB) has evaluated the response to our question 42'l.l of the referenced memo contained in Section 2.1.4 of Revision 3 of the Steam Generator Repair Report,. dated April 1978.

Me have limited our review to~ the responses to Regulatory Guides 1.28, 1.37, 1.38, 1.58, 1.64, 1.88, and 1.123.

lie find the responses and commitments relative to these guides to be acceptable.

The response to our guestion 421.2 is acceptable in that FPL has committed that the FPL gA program, applicable to field operations affected by the replacement of the steam generators, will be that described in FPL's gA Topical Report, FPLTgAR 1-76A. Rev.

2 except as amplified in Section 3.6.1 of Rev. 3 of the Steam Generator Repair Report.

He find these amplif'ications acceptable.

The response to our guestion 421.3 is acceptable except that the response on page A-13-1 of Rev. 3, dated April 1978, should be modified as follows:

The statement "FPL and Bechtel comply with the intent of Regulatory Guide 1.38...." should be changed to read:

"FPL and Bechtel comply with the regulatory position of Regulatory Guide 1.38...."

l3PH:.g OenCE~

FLi.e.derha h.:.g 0VRNANE~

0/ Li.72...

OATE9 4

NRC FORM 518 (9-76) NRCM 0240 Original.signed b~

A,M Garland Malter P. Haass, Chief ality Assur e Branch

...DPM.:.g

...AG r..l.a. d 6/- -./.?8 '-

..DP..M:. A P8aas.s-6/ -/78----

  • I 0 OOVERNNENT PRINTINO OFCICEs l070 020 024 t y+

77ZSTOSSS

r>h s'

g)

Ji g>>.h

'j' Il I

r 0

l r

I I

I' I

ll I

h h ll rt I

I II r

tl I It H

I th ji Jt i

  • I J

I JI

, I I

ll

~

hl I

I I

t, I

I J

I r

I

> '41" fWTiel'lV 6A~itt'9.W),j 1

h I

~

h "t

~

I'

~R REMI 0

OO r+

o~

/P Docket

o. I 25O UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 June 7, 'l978 DIS

.BU Docket 0

ea sng CParrish Docketing and Service Section Office of the Secretary of the Commission

SUBJECT:

FLORIDA POWER ND LIGHT COMPANY (Turkey Point Un)t 3)

Amendmdnt No. 36 Two signed originals of the Federal Register Notice identified below are enclosed foryour transmittal to the Office ofthe Federal Register for publication. Additional conformed copies ( 12 ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application forConstruction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availabilityof Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s);

Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availabilityof NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availabilityof Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

Gtl Notice of Issuance of Facility Operating License(s) or Amendment(s).

00 Other Referenced IhtHEUKN documents have been rovfded PDRs.

Enclosure:

As Stated Office of Nuclear Reactor Regulation OFFICE~

SURNAME~

DATE~

NRC FORM 102 (1.?8)

DOR: ORBgl CParrish:,1.b!

6/6/78

4

~

~

'4

~

R e

~ ATTACHMENT HI).HHELD FROM PUBLIC DISCLOSURE Docket Hot~50-200)261 Ml 25 1978 FRO>t:

Robert A. Clark, Chief Reactor Safeguards Licensing Brahch Division of Operating Reactors f LEHORANDUH FOR:

Albert Schwencer Chief, Operating Reactors Branch O'I Division of Operating Reactors, NRR DIST.

RSLB R/F w/o encls.

~Docket Files w/o encl JRMiller w/o encls.

RAClark w/encls.

EWMcPeek w/encls M. Grotenhuis, encl.

SUNECT:

TURKEY POINT 'UNITS 3 AND 4 MODIFIED /WENDED SECURITY PLAN REYIEW Enclosed are five copies of the report on the 10 CFR 73.55 review of Turkey Point Units 3 and 4.

The repor t is. the result of' meeting held with the licensee on April 20, 19?8.

The, report should receive the same distribution as the Phase I agreement.

The distribution is described in the 0. R. (Miler memorandum of August 12, 197?, attached.

o..1.,-~ ~-n:d by:

Robert A. Clark, Chief Reactor Safeguards Licensing Branch Division of Operating Reactor s

Enclosures:

l.

Report on 10 CFR 73.55 Review

~

of Turkey Point Units 3 and 4 2.

Memo J"; R. Miller to K. Goller, D. Vassallo, R. Denise dtd.'ugust 12, 19?7 773430182 RSLB:DOR EMMePhEK----.

..........5/Q./78......

OFSICK~

dURNAMlf~

OATC+

NRC FORM 318 (9.76) NRCM 0240 AS/RS:D R

HHELD 0

P

........5./....

L

DOR klTACHIIEHT I BLIC DISCLOSU 4 V d OOVCRNMCNT PRINTINO OPPICE> IOTd ded d24

..HAGlaxk

rw I

4 4

II ~ 4 4

~ 4

'4 I

4 ~

I

'I '

N IF+

Ff ff(

4 F'l 44 I'

+

I a

4 F

4 w) ~

~ ~

4 II I ~

4 llrfjk 4ljf4 F

>4 ffw I fag I

4 ajr r 4-fj

'I'prf ~j

'4,41 44

- fl 4

~

jt Ff%

1' 1

a FF jt 4 4 R 444 f

Pl 4

4(

C Fj 4

wj gg, ff F

r 4

!fp.

~ Il'4(

4 4

It 4

sgril 6, 1978 The st~ am Header pressttre traAst:>Nter has e va'y narrow range; tainir!ttg output, ef AO psig.

Thereof'<re. Curing cooldottn as stem generator pressum. drops & ~ 449 psig a safety 4tt$ection t>)ll occttr $ i. this signttl is not Nockatf I

He [tave also deteriaimd that Surrey 1 arid 2.and Yt rhea Po)tt4 3 end 4 have the sano CAstrttt," nt, and sicp>al Mockittg a&angertent and'technical sp-c)fication rcquif'QQGnts Qs N. 8 RCMttson 2.

4R@'GQR is requested to deters>ne the acceptability of blocMng the stean fin~ @if'fem<iihl pressttre safety

$ojectiott. sit;ttal dur$ ttg cooldo>e siklultNt>~ottsly l".$0: t ae blockittg of tAQ coiAcident pressttf'i XQf'CM levH and low pressure signal.

Technical Sp'eB'ieagions for the Ave afore-t.- nt)oned'p'lattts sitoultt be mdifieg as require%

Qflitl5dl ctgsod $

p'A Safexek J. fl. $t;ines. 8/lt for Fie)rf Coordinttfion RQactol Oper4%wQM

, lE t

Nv)sion of ce:

F. J, Long, RII

, lisp"c"ion Q. 6-Hittch1ay, AII J. 9. Weigkbors, 0.'0'-1'-

H. Grotenhuis GAB-1 A. Se4~,"ence', 64-1

., CL'AAGT:

Q. C. Stone (ggpgo) 3)

FC: ROI:IE AOFC:ROI: IE JCStone JHSniezeg 4/5/78 LO 4/

/78 773i10332 n

DISTRIBUTION:

'E File

-i Wetral File IE Rdg.

RSI Rd.

ADFC Chron.

4~ ~ si JCStone,.o'Vi WEllORCiRilI FQif:

0. Kisent<ut, @f9 toe Systems littd Projects, MR, t>HR FROti",

'8.'. $niezem;, A/9 for'ield Coor'dinat)ott',

OROI', IE c'UBJECT:

BLOCK(BiG OF STCgl LI'4E fiICi'FFCAEHTDLPRESSURE SAFETY lHQKTIOi SMgd 99ABiG NQLGCtN ArT $Q.K HESTD)CHOUSE OKSIKEG PIAgS C

Qttring cl"'rccGA't 'fnspM~tion 4t tie Go Rob'fnsoQ 2g it vQs fotttNf Hat during cooldo'e the licctt oe b'epochs tw safety itt3~chion ittitiation tfgnal hat the Mgjt d)fferential prwsure bi>t",~e ri stoa;a lines end the stla line he~xv>>.r.

TMs 'Mock $s ban~-vireos into ti,"tt sam switch

, that is ttmd to Mock the yrmsurizar 'tow p);assure and lo'-~ level safety infect)on siglMl Vixen 'pl'iQQrg press%'e

'ls 6HO'A 2996. psigo 749 tccAAical sp~cifications (TctblG 3+5 3') 61191t'ocking boite prossltrizQF'ignttls but do ttot address i:ite blocking of'he steam 'lite high Bffer-end~al pressttr~~.sigh'l.

MAR 0 8 F78 Docket Nos.:

50-250, 251 tlEMORANDUN FOR:

Karl R. Goller, Assistant Director for Operating

Reactors, DOR FROM Robert L. Baer, Chief, Reactor Safety Branch, DOR

SUBJECT:

TURKEY POINT - SAFETY EVALUATION SUPPLEMENT (TACS 87290)

PLANT NAt~E:

Turkey Point Units 3 and 4 DOCKET NOS.:

50-250, 251 PROJECT HANAGER:

H. Grotenhuis, ORB 81 OPERATIONAL TECHNOLOGY BRANCH:

Reactor Safety STATUS:

Complete Attached is the Reactor Safety Branch evaluation of Florida Power 8

Light's submittal of additional information on Turkey Point Units 3 and 4 with steam generator tube plugging levels up to 19%.

We find the information acceptable based on the accident analyses and accom<<

panying Technical Specification limits presented.

Original signed by Robert Baer Robert L. Baer, Chief Reactor Safety. Branch Division of Operating Reactors

Enclosure:

As stated cc:

V. Stello D. Eisenhut J. Guibert R. Cudlin P.

Check C. Berlinger F. Coffman S. Weiss A. Schwencer f5. Grotenhuis J. Giannelli R. Landry DISTRIBUTION:

RS Reading R. Baer R. 'Landry Reading 773560296 RS/DOR g

...RgkfLd.ry....t.'......

3/g /78 OPPICE~

SURNAME~

DATE~

NRC FORM 318 (9.76) NRCM 0240 RS/DOR

~$

RS/DOR c SIIRIII...,... RDDRl 3/g /78 3/$ /78 Q VI0, OOVEIIHMEHTPIIINTINCOPPICEI I070 02~24

~

Ut 4

UU U.

~ l l

U IPt UU

=

UUU g

U 4

C f

5-4 4

s 4

fUt l ~

~ 0 P.

IW ~

gU UH UU 4, r) 4'0 r4 WU U 4

c4 I

l

~ U

~

U UU U

U UUU p

) (,

~

PU U

l "<ky 4'U ~ I

~

gn 4

4l P

~

~

5

'UU ~

i UU l

~< >Of-'m>< Xan~gZgq.

'4088 f"9Cfr)iZ 4

U 4

)UU g

1 il 1

'44

)U' 4 l

~ ll

~

U

)l U

~

4 Pg"U U Ur

'1 4'$

'j!

I

~ ~

l

~

U,

~

U 4 '

PANS g Iyg Docket Nos.:

50-250/251 MEMORANDUM FOR:

Brian K. Grimes. Chief Environmental Evaluation Branch, DOR FROM

SUBJECT:

John T. Collins, Chief Effluent Treatment Systems

Branch, DSE TAR 7094.

TURKEY POINT UNITS 3 AND 4, STEN> GENERATOR REPAIR REPORT - REVISION 1 Me have reviewed the subject report dated December 1977 and we have no substantive comments to offer at this time.

cc:

R. Vollmer M. Kreger John T. Collins, Chief Effluent Treatment Systems Branch Division of Site Safety and Environmental Analysis DISTRIBUTION:

Central File DSE Reading ETSB Reading - Subject File 4.4 JCollins 773010187 OPPICE~

SURNAME~

DATE~

SB'

..JG DsJmas........

IJ3Lna...

NRC FORM 318 (9-76) NRCM 0240 0 Ue So 4OVERNMENT PRINTINO OPPICEI ISTd d2d d24

e I

$ ~ h" I I

4

~ I, I

~

}1}

.'I hI}" I'.4 h I ~

+I 4v 4

4 44+

1 I

'C 4

'I It I

1 h

tl

}l Il 1

II W

III}

4'4 II I

h I'I 4

. I

'FEB 38 1978 Docket Nos.:

50-250, 251 MEMORANDUM FOR:

Karl R. Goller, Ass)stant Director for Operating

Reactors, DOR FROM'UBJECT:

Robert L. Baer, Chief, Reactor Safety Branch, DOR TURKEY POINT << INCREASED LEVEL OF ALLOWABLE STEAN GENEMTOR TUBE PLUGGING (TACS 07290)

PLANT NANE:

Turkey Point Units 3 and 4 DOCKET NOS.:

50-250, 251.

PROBECT NNAGER:

H. Grotenhufs, ORB82 OPERATIONAL TECHNOLOGY BRANCH:

Reactor Safety STATUS:

Complete Attached ls the Reactor Safety Branch evalaution of Flor dia Power 5 Light's f)roposal for operation of Turkey Po)nt Units 3 and 4 at steam generator tube p'}ugg$ ng levels up to 19K.

We find the proposal to be acceptable based on the accident analyses and accompanying Technlcal Specification limits presented.

Original signed by Robert Baer Robert L. Baer, Ch)ef Reactor Safety Branch Div)sion of Operating Reactors

Enclosure:

As stated cc:

V. Stello D. Eisenhut J. Guihtrt R. Cudl)n P. Check C-. Ber linger F. Cofflnan S.

Wekss A. Schwencer M. GrotenhuSs J. Giannelli R. Landry DISTRIBUTION Central Fil es RS Rdg.

RBaer RLandry Rdg.

OPPICC~

CURNAMC~

DOR:RS RLand 2/z )/78 UATC~,......~. g NRC FORM 318 (9.76) NRCM 0240 DOR:RS SWeiss 2/~l/78 DOR: RS RBaer 2j5p78 4 U, 0, OOVCRNMCNT PRINTINO OFFICCI I070 02~24 77355039-

I v

~>>4

~

4

<<f'"

~ '

~

>>4 V

!4>>

4

~ 4 I I 4>>'>><<4 J>>4 I

1 4 N

>>~ 'I 7

t 14

'I I

I>> )

<<1 V

I V

~ P 4

V I

. I 444I 44>>

P'44 tl I

t

<<V 4

~

I 4

I 4

7< ben@a Loaigizo LQ~K 4.~od'oH

>>V 0 ~

~

I>>4

>>=V<<4-l('f ft A

V

~ -'4

~ 4 4

4 II 4 41 I~

fl'-<<4 ~ '>>

, ",.'f) n IL '! 'l'.

IIII'V

~

4

FEB 08 1gy8 Docket Nos.:

50-250/251 HEHORANDUN FOR:

Karl R. Goller, Assistant Director for Operating

Reactors, DOR FROM

SUBJECT:

Robert L. Baer, Chief, Reactor Safety Branch, DOR I

TURKEY POINT SUBMITTAL FOR OPERATION 1GTH 19K STEAM GENERATOR TUBES PLUGGED jTACS 87290)

PLANT NlV)E:

Turkey Point Units 3/4 RESOONSIBLE BRANCH:

ORB-3, R. Clark OPERATIONAL TECHNOLOGY BRANCH:

Reactor Safety STATUS:

AwÃting Information Attached is a request for information which the Reactor Safety Branch needs to complete its review of the licensees submittal justifying operation of the Turkey Point plant with up to 19K of the steam generator tubes plugged.

lfe request that the attached questions be transmitted to the 1

licensee as soon as possible.

Origlnal Bigael by Robert Baer Robert L. Baer, Chief Reactor Safety Branch Division of Operlting Reactors Encl os ur e:

As stated cc:

V. Stello D. Eisenhut D. Ziemann G. Lear R. Cudlin J. Guibert C. Berlinger F. Coffman S. Meiss R. Clark R. Landry J. Giannelli

Contact:

R. Landry, DOR X28050 DISTRIBUTION RS Rdg.

RBaer RLandry Rdg, 773gZ0246 OOR:RSg RLandly. t SUANAMEW 2/y /78 DATE~

NRC FORM 318 (9-76) NRCM 0240 DOR:RS SWeiss 2/P /78 DOR:RS~

RBaer ~~

2/Q /78 4 UI 8 OOYERNMENT IaRINTINO OIaIaICEI ID'TO 525 024

~y I

R y

R I

R

~

~

NII I A"I'I'S

~

"I

~

~

II<<

~ N 'yv N I ti II VR Wy<<

N ty'I I

I

~

I VI'IIQ R

%l',

I t

IW th

I4y, ll

~

U

~ 'I l

I

<<fc

~ y R

R V

y'tr<<

I,I I N )

V'I'g W

,R

~

IR,R ll

~'g

~ I N

R ~

v

~

I

GEO g g 197?

Docket Nos.:

50-260 60-251 MEMORANDUM FOR:

Karl R. Goller, Assistant Director for Operating

Reactors, DOR FROM:

Robert L. Baer, Chief, Reactor Safety Branch, DOR SU'8JECT:

STEAM GENERATOR REPAIR PROGRAM FOR TURKEY POINT PLANT NAME:

Turkey Point Units 3 and 4

DOCKFT HOS.:

60-250, 50-251 RESPONSIBLE BRANCH AND PROJECT MANAGER!

ORB>>3, R. Clark OPERATIONAL TECHNOLOGY BRANCH INVOLVED:

Reactor Safety

'EVIEW STATUS:

Under Active Review The Reactor Safety Branch has completed a preliminary review of Flor-ida Power and Light Company's Steam Generator Repair Report.

Based on this review. we have concluded that we do not have any con-cerns which will affect the design of the new steam generators.

It is expected that we will request some additional information regarding the analysis of potential transients and accidents..

Clarification of some of the information presented in FPL's submittal may also be required.

These concerns may affect operating limits and repair procedures but should not affect the steam generator design, cc:

V. Ste'llo D. Eisenhut R. Cudlin J. Guibert G. Lear L. Shao M. Butler B. Grimes R. Clark-C. Berlinger F. Coffman S. Meiss J. Giannelli, Rpbert L. Baer, Chief Reactor Safety Branch Division of Operating Reactors OPFICKW aURNAMEW DATE&

SWeiss @ j

'--RSj'40 -- KK-- -AS%DO ---------

12 77 RBaer RS/88 12/~77 773OSOOS3 NRC FORM 518 (9 76) NRCIC 0240 4 u> a. oovaRNM arm s wNviNo orrtcas cosa-aaa.aaa

Ik

~ f I

1.

I It i.

N

- ~

I <<4<<P<<<<ggtl

= t P

kk I

t tl<<)ft 'l I

It

<<I<<'

n f<<J'et f

t<<4" 4

lk I

~ f l

4 ~

I 4 I I

~ '

e

<< 4 f

'I

~

I ftl

<<PIQC" f jl<<1k'

<<4 lj f +tkff <<<<

f t<<ll fl I

. ~

tklk k

=-, <<

'I I.'k f I f

~) f<< <<IIII

-f

~

<<el

<<)

<<k0

<<<<kfkk I, +f'4I "II I 'k I

\\,

N lilt k

t

<<I P f<<

I I

~

I k

~~

e I'I ff<<<<tf<<

I, Ik 4

lk 1

,<<1 fftt f'f \\ Ik ~

1 1

f'I /

e II f <<

Sl t>)

4 4 I.

I

'I

\\

k',)J 1

1 f<<<<

DEC 6 1977 Docket No. 50-250 December 6,,1,977 FLASH NOTE Distribution ocket ORB g3 GLear RClark HEYIORANDUtl FOR:

George Lear, Chief, Operating Reactors Branch 83, DOR FRY:

SUBJECT:

Richard Clark, Project Ranager, Operating Reactors Branch 83, DOR TURKEY POINT UNIT NO. 3 - STEAM GENERATOR INSPECTION Turkey Point Unit No. 3 shutdown for refueling, maintenance and inspections on November 24, 1977.

As the first order of'usiness, FPL scheduled the inspection of the Unit 3 steam generators.'nit 3

had operated since January 1977 vrithout any measureable primary to secondary leakage through the steam generators.

At present, 5.7% of the tubes in the Unit 3 steam generators are plugged.

Based on the preliminary inspection results, FPL estimates that they may plug an additional 5$ of. the tubes to operate through cycle 5.

FPL expects to be ready to startup Unit 3 by January 22, 1977.

NRC approval is required before Unit 3 can resume power operation.

FPL estimates that the results of the steam generator inspections and evaluation will be submitted to us by January 3, 1978.

cc:

E.

G.

Case V. Stello K. R. Goller D. Eisenhut R. Baer L. Shao D. Stuart OI"iginaJ SIorIe g,J.Chrg'ichard Clark, Project Hanager Operating Reactors Branch f3 Division of Operating Reactors DRRICE~

OININAMCW DATE ORB P~/g RCl a

.mjf 12/6/77 ORB j/3 GLear 12/6/77 FLASK-'lKIT'E'.--'

772980087 NRC FORM 518 (9-76) NRI 0240 4 UI 0, ODVRRNMIINTRIIINTIHOORRICKI IOTO 42~28/

4t 0

~

H 4

I H

kl

DEC 0 2 1977 HENORANDUH FOR:

K. R. Goller, Assistant Director for Operating Reactors Division of Operating Reactors FROM:

L., C. Shao, Chief Engineering Branch Division of Operating Reactors gg/

g gQ Z-8'/

SUBJECT:

TURNEY POINT UNITS 3 5 4 AND SURRY UNITS 1'5 2 STEAM GENERATOR REPAIRS The purpose of this memorandum is to inform you that the Engineering Branch w)11 not meet, your schedules for first round questions on the above subject submittals.

We are still reviewing the proposals and have not yet received input from our consultants.

Me anticipate that our questions will be submitted,,to you by December 23, 1977

Contact:

R. LaGrange Ext. 28060

~

4'.

C. Shao, Chief Engineering Branch Division of Operating Reactors cc:

V. Stello D. Eisenhut R. Stuart G. Lear R. Reid J. Guibert R. Cudlin R. Clark H. Fairtile R. LaQrange OFRIC6~

dURNAM6%

OATe~

EB: DOR

-2856O-9~~

....RLaGrange';m 11/'t78/77,,,

E~--

RS.tua.r..t,,

11677 772980069 NRC FORM 518 (9.76) NRCM 0240 5 VI0, OOVRRNMRNT RRINTINO OFRICes I07d Odd&64

I'K Itvt tt

~ L it' vv K

vv K

I ~ 'I

'I,.

i III. ',K'., v,f JI vv f

. 'tvpjf

+

)v,*vgt E

~"

I' o ~

~

1 I

Kb

NOV 28 1977

.0 Docket Nos.:

50-260/251 MEMORANDUM FOR:

Karl R. Goller, Assistant D)rector for Operating

Reactors, DOR FROM:

Robert L. Baer, Chief, Reactor Safety Branch, DOR

SUBJECT:

EVALUATION OF TURKEY POINT UNITS NO. 3 AND NO. 4 tWRGINS FOR DNBR REDUCTION DUE TO FUEL ROD BOM Attached

$ s an evaluation of the Turkey Point Un)ts No. 3 and No. 4 sub-mittal sih$ ch fisted the thermal mar gin credits available for offsetting DNBR rdduction due to fuel rod bed.

Me conclude, on the basis of this evaluation, that no reduction

$ n FhH fs required to accomodate the effects

'f fuel rod bovi$ ng for Turkey Point Units No.

3 and No. 4, since sufficient thermal margin exists.

prjgina1 Bi@nod b7 Robort Baor Robert L. Baer, Chief'eactor Safety Branch Division of Operating Reactors

Enclosure:

As:stated cc:

V. Stello D. Eisenhut G. Lear B. Cudlin J. Guibert D, Ziemann R. Clark ti. Fletcher C. Berlinger F. Coffman S. Meiss R. Lobel C. Kibert DISTRIBUTION Central Fil,es RS Rdg.

RBaer CKibert Rdg.

772930274 brrIcs~

DOR1 RS CKibert:ct SURNAMS~

11/ lQ /77 DOR:RS CBerlinger 11/ ggPT DOR:RS B~eer 1 Ij~/'77" NRC FORM 518 (9-76) NRCM 0240 A U, S, OOVSIINMSNT PIUNTINO OrrICSI IQTS 026 424

p 8

8 4

8 n

8 II 4

8 n

8 '

M ~

8 I 8 M

8 8

If

~en 8 ~

~ 4 M If I

I 8

ft f

~ '

n 8

48" 8

I

~ IM ek 'I

~ n.

8

$ 8'I 888,44

~I nn 1

j 8.

4 kl

~fI+8)88 e

I4 g

~

8 I

8

~ ~ 8 f1 If 4

Kn 8

~ e 4 I

4 4 I 8

~ 18

<4 M

8'I, 4

I f In MM

NOV a> ]977 MEMORANDUM fOR:

Thomas D. Murphy, Leader Radiation Protection Section, RAB FROM:

SUBJECT:

Richard Emch Radiation Protection Section, RAB TURKEY POINT TRIP REPORT

'n fiovember 1 and 2, I attended the training program for an identification badge at Turkey Point Station.

I attended the training with D. Solberg.

RES and J. Lee, ETSB and,the INEL people who will be performing the Inplant

'easurement Program at Turkey Point.

On November 1, 1977, we were given a half day of videotape and live instructor training in radiation protection and the emergency plan.

Me were also given the "Turkey Point Plant Health Physics Training Manual" to study<

Later. whole body counts were performed on us and urine samples were taken from,us.

On November 2, 1977, we took a test to prove that we had gained adequate knowledge of Turkey Point's radiation p'rotection procedures.

Then the others were given "red" identification badges allowing them.unescorted access to the 4Radiation Control Area (RCA)."

However, due to my lack of experience as a "hands on" radiation worker, I was given a "blue" badge.

I will have to be escorted at all times inside the "RCA."

The health physicist, L. Cushen, said that I could get a "red" badge if I went through their week-long training for ",first time" radiation workers.

Since Cushen assui ed me that the INEL people would escort me inside the "RCA," I decided that further training and the "red" badge were not necessary for me.

Richard Emch Radiation Protection Section Radiological Assessment

Branch, DSE cc:

H. Kreger R. Vollmer B. Grimes L. Barrett D. Solberg J. Lee E.

Case S.

Hanauer H. Denton D. Muller.

R. Fraley D. Bunch J. Collins D. Crutchfield DISTRIBUTION Docket File DSE Reading RAB Reading NRC PDR/Local PD OPPICR9 SURNAME&

CATE&

,RAB:DSg, RLEmc:.

11/P/77

~E T.

1 /y/77 NRC 1'ORM 518 (9.76) NRI 0240 6 Uo 8 COVSRNMCNT PIIINTIN4OPI'ICCs

$ 074>> SRlh024

I I I

I I<<

WI(<<,))

'r

( 'I 'IE

~ )<<r I

a I

<<t I

I

~

t)'

~

l I I I

)

I 1

f I

I(

~

1-I f

a I

t

'f

a

)]

I "I

a

~ I I

f'I a

I I

I a

f<<

I,<<

IE a

1

, ~

('

G t ",

I I( (f

(

~,

I I)

,1 ll m

)<<, r.

t" I'))

t<<~ ll I

r

~

~

I I

'<<1

~ I II

'g'A I \\

I tr

OCT 21 1977 Docket Number:

50-250/251 MEMORANDUM FOR:

Karl R. Goller, Assistant Director for Operating

Reactors, DOR FROft:

SUBJECT:

Robert L. Baer, Chief, Reactor Safety Branch, DOR REVIBt OF TECHNICAL SPECIFICATIONS CHANGE (TAC a6goC)

PLANT NAME:

Turkey Point, Units No. 3 and 4 DOCKET NUMBER:

50-250/251 PROJECT MANAGER:

R. Clark PROJECT BRANCH:

ORB 83 REVIEW BRANCH:

Reactor Safety REVIEW STATUS:

Complete The Reactor Safety Branch has completed its review of the proposed revision to the Technical Specifications for Turkey Point, Units 3 and 4.

The review has indicated that the revision proposed by the licensee is acceptable.

Original signed by Robert Baer Robert L. Baer, Chief Reactor Safety Branch Division of Operating Reactors

Enclosure:

As stated cc:

V. Stello D. Eisenhut D. Ziemann P.

Check J. Guibert R. Cudlin

8. Lear C. Berlinger

.F. Coffman S. Meiss R. Clark K. Parczewski DISTRIBUTION:

RS Reading R. Baer Reading K. Parczewski Reading opplce~

eURNAMKW RS/DOR,(+.

KParczewski:

10/~/77 b

RS/.DQR~....

CBerlinger 10

/77 RS/DDR RBaer 10/8/77 7728602S1 NRC FORM 518 (9.76) NRCM 0240 0 U, d, OOVCRNMENT PRINTINO OPPICKI IOTd end ed4

I

-IM'Mg It I

j I

0 I I I

$ t'()~

'1 1

1

~* q MM II g Cfr

~ 4 1

1

~

44 4

~

-1'1 I'

1 r

~ 4, F

I t

1

~; vfp lp 1

11 1 1

r

$ 1 I

4' I iI I

4

~

I

~

I*

lr p

yy>> I-'r(0 ri 3f.f'f PXQ(fOg 1

E'

~

II

~

M I

1 I 1'M M

il I

Il'f"

'MI 4

JUL 6 197?

D NOTE TO:

D. G. Eisenhut RE:

TURKEY POINT UNITS 3 5 4 lte learned on 7/1/77 that, after the completion of refueling and the inspection of steam generators, FPL discovered that 11 row one tube plugs were missing.

These plugs are about 6 inches in length and 0.775 inch in diameter.

FPL is in process of opening up the reactor again to try to find these missing plugs.

This will delay the re-start of Unit 4, and the schedule is not determined.

Potentially this incident may become a big problem should they not be able to find @11 these plugs, because they do not have a loose part monitoring system on site.

Besides, what assurance do we have that the plugs would not come loose and get back to the reactor again?

This 'makes the reliability of the-explosive plugging method question-able.

Ile are.following'the development closely.

FPL may request an extension of the Unit, 3 operation if they cannot, et Unit 4 back to power before the scheduled shutdown for Unit 3 was scheduled to come down on 7/16/77).

cc:

J. Guibert R. Cudlin R. Stuart F. Almeter B. D. Liaw L. C. Shao, Chief Engineering Branch Division of Operating Reactors ornca~

BVANAMa&

g DATa~

EB:D

--28060""-

, BDLia,mb

....u.k.<.7z.......

NRC FORM 518 (9.76) NRCM 0240 EB:DOR

.4.4s.ha.o.............

.7/...,/.7..7.....,

Av: s. oovssvwatm rswviHo orr(cd lors ssaes4 772i60005 I

-r

I 4

~ ~

I I

l, r I

VV I

t l

I "1 I, Fr'

'Fh I

F V

~

t hlF'q IV I '"

II F

~

f I

I I

=I,,I h S F

I F

t h

~.

~

A l

Vr A

~

v Amendments Nos.'5 and 24 to Facility r

Operating Licenses Nos. DPR-31 and DPR-41, respectively, issued to Florida Power and LightCompany which revised Technical Spectflcatfons foroperation of the Turkey Point Nuclear Venerating Units Nos.

3 and 4.'ocated in".Dade County, Florida. The amendments are effective as of the date of issuance.-

=-

~

~

These amendments concern changes required as a result of a reevaluation of the emergency core cooling system for Turkey Point Unit No. 4. The eniergency core cooling. system reevaluation ful-fllh, for Unit No. 4, the requirements of.

the Commfsston's Orders for Modtflca>>

tion of License dated August 27,

19VB, and December 3,

1978. The operating Ifmftsfor UnitNo. 3 set forth fn. Its Tech-nical Spectflcattons remain unchapged although the Unit No. 3 Technical Speci-fications witt be modified to reflect the revisions to the Unit No; 4 Technical Speciflcattons.

W The application for the amendments compiles with the'tandards and re-quirements of.the Atomic Energy Act of

1954, as amended (the Act), and, the Commhsion's rules and regulations. The Commission has made appropriate fin-ding as required by the Act and the Com-"

mission's rules and regulations fn 10 CPR Chayter I, which are set forth in the license amendments. Prior puUltc no-'ice of these amendmeng,was not re-quired since the amendments do not in>>

volve a significan hasards consfdera-.

tton.

The Commtsston has'etermined that the issuance of these amendments will:

not result fn any significan environ-mental impact and. that pursuant to 10 CFR 51$ (d)(4) an environmental fm pact statement or negative declaration and environmental impact apyrafsal "

need not be prepared fn connection with, hsuance of these amendments.

For further detath wfthrespect Wthh action.

see:

(1) the application for amendments dated December 9, 1976, as supplemented by letters dated December 9, December 30.

1976, and January 3,

1977; (2) Amendments Nos. 25 and 24 to Licenses Nos. DPR-31 and DP~1; and-(3) the Commhslon's related Safety Evaluation. AIIof these items are avail-able for public inspection at the Com-mhsfon's Pubtfo Documents Room,,1V1V H Street NW>> Washington, D.C>> and at, the Znvfronmental and Urban Affairs Lfblazv, Plorfda International Univer-sity; Mfamf, Ftorfda.33199. A coyy of items (2) and (3) may be obtained upon request. addressed to-the UJB. Nuclear Regulatory Commission, Washington,

~D.C. 20555, Attention: Director, Division of Operating Reactors.

Dated at Bethesda, Maryland,'hh 29th day of-April19V7.

For the Nuclear Regulatory Commh sfon.

Qsoaas Lsha;

~ Chfsj, Operatfng'eactors Branch No. 3, Dfefsfon.of Oy-..

eratfng fteactors..

IPR Doc.77-12995 Plied 5-6-Tl;8;46 smt, 9,1 19.+

I NOTICES; ADVISORY PANEL FOR LINGUISTICS PURPOSE OP PANEL: 'To provide ad-"

Nottce of Meeting vfce and recommendatfons concerning

'upport for research in. systematic In acordance with the Federal Ad-bfoIogy.

vtsory Committee Act, Pub. L.92-463, the National Science Foundation an-AQENDA: To revfeur.'and evaluate re th followingmeeting:,

search proposah as. part of the selection gm Zrsmor hdvlsory Psnol for Lingu!sties.

Date snd timor Nsy'20 snd 27, 1977, 9 sm.

REASON FOR CLOSINQ:

The pro-to 6 p.m. osch dsy.-

posals being reviewed include informa-Plsoo itoom 517, Nstionsl Sclonoo Pounds-tfon of a yroprietary or confidentia tron, lsoo 0 stroot Nw." wsshlngton D

nature, including technical information; 20550.

financial data, such as salarfes; and pez-Dr Psm a chspln, Pro Senal information concerning individuals grsm Dlrostoi for Linguistics. Room,320,"

Nstlonsz so}onco Poundstlon, washington, matters are wtthfzr exemptions (4) and D.c.

20550, toioyhono'02-2~320.,

(6) of 5 U.S.C.:552b(c),

Qovernment sumrnsry mlnutos (opon portion): Msy bo in the Sunshine Act; obtained from the Committee Msnsgo-ment Coordlnstlon Stsrr, Division of Por-AUTHORITIES TO CLOSE MEETIÃQ:

sonnol snd hfsnsgomont, Rm.

213, Ns Thle determtnatfOn Wae made by the tlonsl scionco poundsuon, washington;" Committee Management" Officer yursu-D.c. 20550.

ant to provsforis'f Section 10(d) of 1 urposo or psnolr To prov!do snd rooom-pub. L.92-463. The committee Manage-'ondstlons oonoorrdng sbpport for ro ment Ofltcer was delegated the authority sosroh ln Linguist!'

1 ds nd ~

to make such determinations by the Act 27, 12 m to 5 pm. To rovlow snd ovslusto fng DireCtcr, NSF, On February 18, 1977.

r~h Pm~ s d prof cts ss part of M. REBECCh WzzrKLEE the ~lection p~~ for s~ Ol"n-

'Ctfng COmmfttee Management 0@ocr.

of the curront status snd futuro plsns of the Linguistics Program.

MhV 4, 1977.~ "r.

Besson for oloslngr Tho propossls snd prof-octs hsing rovlowed lncludo lnformstion of IPPeDoc77-ZSZS2 Pled ~77;srsd smt s proprietsry or conndentlsl nature, in-cluding toohnlcsl lnformstion; finsnolsl NATIONAL FOUNDATION FOR THE ARTS AND THE HUMANITIES RESEARCH GRANTS PANEL MEETING matters sro within oxcmptlons (4) snd (6) o! d U.S.C. 652b(c), Government ln Correctfon the. Sunshlno hct.

huthorltyto close mootlngr This dotormlns-In FL Doc. 'IV-11259, appearing on tlon wss msdo by tho Cornmittoo pursu-Page 21874 in the heue Of Prfday, April snt to provisions of soctlon 10(d) of Pub.

29. 19VV, the date in,the last Itne of the 1,. 9~83.

Tho commlttoo Msnsgoment firs yaragraph should read, "June 20, Ofscor wss dolegstod tho authority to 1977>>

mslro dotermtnstions by, the Director, NSP,

k. ~..

NUCLEAR REGULATORY Da~: May 4>>77.

COMMISSION M, REEEcch WzNzrLEE.

IDockot Nos. RM29 snd~I

'ctfng Commfttee

~ Marfagement Officer.

CONSUMERS POWER CO. (MIDLAND tpa Doc.77-13ZSZSpited~77;6:45 srrvt PM'N~ I MD ReconstItutfon ofAtomicSafety and Ucenslng Appeal Board ADVISORY PANEL FOR SYSTEMATIC'IOLOGY Notice h hereby given that, in accord-

'nce with the authority in 10 CFR 2.VBV Meeting

~

(a), the Chairman of. the Atomic Safety In accordance with the Federal Ad-and Licensing Appeal Panel has recon-vhory Committee Act

'as amendeC stftuted the Atomic Safety and Licensing Pub.

L. 9~63; the National. Scfence

~ Appeal Board'for this proceeding to con-Poundatfon announces the-following ht of th

- folio~

memb A

Mlchsol EX. Psrrsr, Chslrmsn.,

NAME: Advhozy. Panel for Systematfc B1OIOgy.,

~;

~ "

Dr. W. Rood Johnson;;

p DATE AND TIME: May 26. and 27, Dated: May2;$977 1977-8:20 aJn. to 5 pJn. each day.

'-".. -=-. ~'" MhrrohEET E. Drr Pie.

~

PLACE Room 543 gatfonat Science

t. r

-Ltecretarg to the AS%eat Board.

'oundation1800 0-"Street NW., Wash-. " IPR Doo.77v12994 Pttod'~77:6:. 8 sml-

~~ IDockots Nos.<XO-250 snd 5O-251I' CONTACT PERSON:; Dr>> Johzt W,

FLORIDA POWER, AND LIGHT CO.;,

Wrtghtrr Program Director, Systematfc...

hsuance ofAtnendrnents to Facility, BIOIOgy, PrOgram.-ROOm 338,'atfenal e

<<>> -,S ~s, Opelatfng~naea Science Foundatton, Washington.

D.C.; The UN:Nucieaj'Regulatory Commfs-20550 telephone (202) 63~848: 'ion..;(tf)e ~Commhston);1 has.

hsued'-

~ r--+'.:r---".

'-= :~ <- fEZIEEAt Earigra,;yCZ,~O-a~OIIOAY,,ag,

~

~

JUN 9 1977 0

Doc ets Nos. 50-250 and 50<<251

'/

I'lElIIIORANDUH FOR:

G. Lear, Chief,.Oper ating, Reactors Branch i)3, DOR FROM:

SUBJECT:

D. El 1iott, Project Manager, Operating Reactors Branch 83,

.DOR FORTHCOMING ftEETj,NG QITH FLORIDA POMER AND LIGHT COMPANY DATE AND TIHE:

LOCATION:

PURPOSE:

PARTICIPANTS:

June 1 5, 1 977, 9;00 A.fl.

Bechtel Corporation, Gai thers burg Office To. discuss technical pr obl ems associated with Turkey Point steam generator repl acement

. FPL

DeMastry, G. Liebler

~ et al NRC D. El 1 iott, L. Shao, R. Baer, M. Butler, B. Grimes, H. Fairti ]e, et al Crlafaal Signed b II Donald H. El 1iott, Project tlanager Operati ng Reactors Branch 83 Division of Operating Reactors OFFICE ~

SURNAIIS~

OATS~

ORB P3 DEl 1 io:mj 6/'g/77 772 i60006 NRC FORM 318 (9.76) NRCM 0240 6 Ul S OOVSRNMCNT PRINTINO OIII'ICS4 ISA Sea+&

Ir" *'

K 4

g,e,e e

e 1,

I e't'e'e (le I

I I e(e' e

I e

~

( reef easel(,l1 I~

e II A

J

(

l.

e

~

I

' I

'Jgg 9 5??

Dockeks Nos. 50-250~

and 60-251 fiEthORANOUN FOR:

G. Lear, Chief, Operating Reactors Branch 03, DOR FROM:

SUBJECT:

DATE AND TINE:

LOCATION:

PURPOSE:

PARTICIPANTS:

D. El'liott, Project Manager, Operating Reactors Branch

>93, DOR FORTHCOMING MEETING WITH FLORIDA POWER AND LIGHT COMPANY

, June 14, 'l977, 1:30 P.H.

, Gaithersburg Office - Bechtel Corporation r

Ty discuss licensing problems associated with Turkey Point steam generator replacement

.. FPL R. Uhrig, 0. Pearson, R. Lowenstein NRC V. Stello, K. Goller, D.,'-Hsenhuh, D. Elliott, L. Shao and Js Scinto, (GELD)

Original signed by Dbgald N. Elliott, Project Manager Operating Reactors Branch

<3 Division of Operating Reactors

....ORB...k3............,

DElliott:tjj 6Q /77 OirirICd&

QIIRNAMd~

OATd&

NRC FORM 818 (9-76) NRCM 0240 4 U4 8, OOVdRNMdNT isRINTINO OFFICds I070 CREMd4 77Z160>>

C g

~ <<4 1

'lgl ';

PI 1

f I

NAY si ia7p Oockets

thos, 50 60 50-251 and 50<<335 NEHQRAHDUN FOR:

G. Lear, Chief, Operating Reactors Branch 83, OOR D. Davis, Acting Chief, Operating Reactors Branch 82, DOR FROH:

SVBB1ECT; D. E11)ott, Project tfanager, Operating Reactors Branch 83.

DOR E. Reeves, Project Nanager, Operating Reactors Branch N, DDR

'ORTHCOHIHG NEETING WITH FLORIDA POWER ANO LIGHT COi4PANY DNE WD TIV)E:

LOCATION)

PURPOSE:

PARTICIPANTS June 2, 1977,~1'00 B.R.

~Room 5709, kanyland"Nanional Bank Building To, discuss FPL's po<~er failure of Haye lg 1977 FPL

,DDlhittier. L..Leskovjan and G. Lieb1er HRG D. E11)ott, E. Reeves, D. Tondi, 6. D. HcDonald, J. Burdoin and G. Lear original signed by D. t3. E11iott, Project fianager Operating Reactors Branch N Division of Operating Reactors Original signed by E. Reeves, Project lfanager Operating Reactors Branch 82 Division of Operating Reactors OFFICK~

SVRNAMKW OATK~

...ORH.. F3...........

DElliott:tnj 5/3)/77 NRC FORM 318 9-7la NRCM 0240 ORB g ~

EReefds ~

5/g/'/77 4 Vl8 OOVKRNMKNTPRINTINO OFFICE 1078 <<SK~KrR 77gig0008 t

S

'I t

IP J

S ' 9'l I'4 Sl ~

I Pd I

I I

pe bgd.j

<+ fulfil'~> i4"

'I S

I" PP V

JI t I

'I I

l S

I J

4

P Hay 9, 1977 FLASH NOTE HEHORANOUH FOR:

George Lear, Chief, Operating Reactors Branch 83, DOR FROM:

SUBJECT; Donald ft. Elliott, Operating Reactors Branch 83, DOR TURKEY POINT UNIT NO. 4 STGN GENERATOR g~P 2~4 Florida Power and Light Company (FPL) has reported that they shutdown Turkey Point Unit No. 4 beaause of a primary to secondary leak in the C steam generator.

FPL reported the leak rate was approximately 0.3 gpm prior to shutdown Unit No. 4 will remain shutdown for approximately 8 weeks.,

During the shutdown period FPL will refuel the reactor and perform an extensive inspection of the steam generators at Unit No, 4.

This note is for information.

cc:

E. G. Case V. Stello K. R. Goller D. Efsenhut H. Fairtile L. Shao (3)

J. Scinto Donald H. Elliott Operating Reactors Branch P3 Division of Operating Reactors DISTRIBUTION:

Docket ORBII'3 Rdg FI1 e FLASH NOTE OPPICB~

BVRNAMBW OATB~

..,OR.BP.3.....,....,

DElliott:acr 5/ f..,,/77 772i600l2 NRC FORM 518 (9.76) NRCM 0240 4 U, 8, COVBRNMBNTPRINTINO OPPICBI IOTB B~~

W>>

1 Ei kfJ I g I

EI F! 1 1

f

~ N.

4 1 'if

'il >>WDE Nf, "DJP>>

~

>>Ill IF' C'

>>I f

'I" I'>>'I WIF>>

I I

J I

f

  • Jl

~ -Wt

~

I' I

Fi 0>>'

'WW ~

CEI

'\\F>>

1 1 "f>>F ND

~ '

W I P

ef'r D

il e

I'

>>NEF

'W I

) Ef

>>EI',r I

-'4 t W

f

<<g

- eqf-'F>>'

I l -~

E

15989 lr bf lf e't I

d 9'

- NOTICES (2) Letters from Te>>eeeee Valley hu-IDocket Roe.60-260 and 60-26II

~

'. For the Nuclear-Regulatory co~-

e~i to the Db t r 0! Nuclear R actor FLORIDA POWER AND LIGHT CO.

'61on.

'tipn dated January 19, and Pehru-

~y ls. 1977r issuance of Amendments to Facility Oper-g

~

(S) hxnendmente 69, Sl and 82 to the Sting Ucenses and Negative Declaration C el'p+ atfnp Reactors

~eat Perry Nuclear Plant PSAR.

Branch No. 3, Dfvfsfon oj Op-gulatory Commhslon eratinp Reactors.

ui)e nultter of Tennessee valley Authority (the Commhsfon)

Walls issued Amend IPIt Doc.77-8677 Plied s-28-77; 8 l46 aml

~ Perry Nuclear Plant Unit No. S).

mentS NOS. 23 and 22 tO Facility Opernt de&'. pursuant to the Atomic ing Licenses Nos. Dp~l and DP hccc f 1954 mended and the resPectfvety. hsued to Ft<<fda

~, ~fo 's RAm and Regulations in Light Company, which revh

~

LONG ISLAND LIGHTING CO.

~part,2and50.fthold red. That comm and their appended Tm~

ISCFtt ar Specification for operation of the Tur-Availability of Draft Environmental State-key point Nucfeal Generating Units Nos nlellt for Shorehalll Nuclear Power Sts hereby amended by adding e

o ow g

3 and 4 (the facflftfes) focnted in Dade tion, Unit No.l DeT provision:

~fble, the licensee County, Florida. The amendments are Pursuant to the National Envtron-bmit a reevaluation of ECCS effective as of the date of issuance.

mental Policy Act of 1969 and the Performance calculated in ac-Theamendmentsnuthorizedexpnnsfon United States Nuclear Regulatory Com-m~ce with General Electric Com-of the sPent fuel storage pool cnp'mission's regulations fn 10 CFR Part 51,

'valuation Model approved by the by replacing the existirig sPent fuel stor-notice h hereby given that a Draft En-hWC st ff and corrected for the errors age racks, which have a capacity for vtronmental Statement (NUREG-0165) d rf~ herein ari'd any other correc-235 fuel assemblies at Unit No. 3 and prepared by the Commission's Office of,.

porn b the Model of which the licensee 21V at Unit No. 4, with new racks which Nuclear Reactor Regulation related to I, am~ at the tf e the ~culattons are have a capacity for 621 fuel ~embffes the prop ed op ration of the Shore-perfozmed.

per Unit.

ham Nuclear Power Station, Unit No. 1, "

The application for the amendments located in Suffolk County, New York h DS4d in Bethesda, Maryland. thh complfes with the standards and require-avaoable for inspection by the public ln I

llfh day of March 19V7,,

ments of the Atomic Energy Act of 1954.

the Commission's public

= Document For the Nuclear Regulatory,Commh-as amended (the Act), and the Com-Room at 1717 H Street NW., Washing-

. mhsfon's rules and regulations

'The ton, D.C. and in the Comsewogue Public Commhston has made appropriate find-Library,.1VO Terryvtlle Road, Port Jef-Dfrector,OIIfceof ings as required by the Act nnd the 'ferson, New York. The Draft Statement Nuclear Reactor Repufatfon.

Commission's rules and regulations fn 10 16 also being made available at the State CFR Chapter I, whIch are set forth in Clearinghouse, New York State Dtvhfon IPIID ~~~ ~~

28 77l 'the license amendments.

Notice of Pro- -of the Budget, State Capitol, Albany, posed Issuance of Amendmentstopactt-New York, and at the Trf-State Re-Ipccket Noe. 60~91, ~92, and ~981

~ ity operating Licenses in connection gfonnf Planning commission, 1 world with this action was publhhed ln the Trade Center, 56 South, New York, New DUKE POWER CO., CHEROKEE NUCLEAR FEDERaL REGISTER on March 25, 1976 (41 York. Requests for copies of the Draft STATION, UNITS 1 2 AND S FR 19363). No request for a hearing or Environmental Statement should be ad-Resumption of Evldentialy Hearing petition for leave to intervene was flie dressed to the UN. Nuclear Regulatory Th vid ntiar hearing will r~~e followh g notice of the pro~ action. Co~h ton, W~ington, D.C. ~ Att n-The Commission hns prepared an en-tfon: Director, Divhlon of Site Safety herein on April 26, 1977, at 9:30 a.m tn vtronmentnt impact apprahal fn connec-and Environmental Analysts.

tton with issuance of the amendments The Applicant's Environmental Re-

,.'nd has concluded that an environmental portas supplemented, submitted by the house in Gaffne South Carolina.

It fs so ordered...

.'impact statement for thh particular ac-Long Island Lighting Company h also tfon is not warrant because there will available for Public insPection at the 17th dn fMarch 1977

'e no significan environmental impact above-designated locations.

Notice of

~ 'attributable to the proposed action.

availability of the Applfcant's Environ-

  • I

~

~ -

AToMIc SAFETY AND LlcENs-

~ 'or further details with resPect to this mental RePort was Publhhed in the FED-ING BoaRD, -:r='-'".4'

action, see (1) the aPPlication for, ERAL REGIsTER on March 18, 1976 (41 FREDERIc J. CovrhL, "...".:-.amendments dated January 28, 1976, and FR 1136'7)

~

Chairman.:=

~

supplements thereto dated April 30, May. 'Pursuant to 10 CFR Part 51, inter-

,, fPR Doc,77-8676 Pued 8-28-77;8:46 aint

~ ;.10 and 25, June 1, August 3, October 15 ested persons mny submit. comments on and 27, 19V6. and February 10 and 16, lhe Applicant's Environmental Report,

.1977, (2) Amendments Nos. 23 and 22 to as supplemented, and the Draft Envi-IDocket Nos.60-488, 60-489, and 60-490]

Lf N

Dp~t d Dp~t (3) ronmentnl Statement for the Commis-censes os.

an sion's consideration. ~erat and State

@DUKE POWER CO., PERKINS NUCLEAR 'he Cpmmhston's rclntcd Safety Evalua-agenctes are being provided with copies STATION, UNITS 1, 2 AND 3 tion, and (4)'the Commission's Environ-of the Applicant's Environmental Re-Resumptfon of Evidentiary Hearing

-,mental Impact Apprafsnk All of these.Port and the Draft Environmental

~ The evidentiary.hearing will resume 'tems are available for public inspection, th

- 'tatement (local agencies may obtain herein on April 28, 1977, at 9:30 a.m. in'at the Commhsfon's Public. Document ments are due by Mny 16, 1977. Com-tbe Courtroom of the Davie County Room,,171V H Street NW.. Washington,.ments by Federal, State, nnd focal pfff

. Courthouse tn Mocksville. North Caro-D.C. ",and 'at the Environmental and clnls, or other persons received by the

". Urban.Affairs Library, Florida Internn Commhsfon. will be made available for Itfs so ordered..

tfonnl University, Mfnmt, Florida 33199 public inspection at the'Commfssfon's Public Docmnent Room in Washington, Dated at

Bethesda, Maryland, thh"'

Acopyof Items (2), (3),'nnd (4) may D.C. and the Comsewogue public Z,1-17th dny of March 1977.

I "6,'.""-.

bc obtained upon request addressed to -brary, 170 Terryville Road, port Jeffer-

,;.-,.;. AToMic ShpmY AND LICE'Ns-:-.the U.S.Nuclear Regulatory commission,

.son. New York. Upon'consideration of

'ING BORED,

~.;~

~ Washington, D,C. 20555, Attention: Di-- comments submitted with respect to FREDERIc J. CovFAL,:,, -',

- rector, Dfvhfon of Operating Reactors.. Draft, Environmental Statement, the

. - Dated at Bethesda, pfaryfand-thfs 17 Commission's staff will PrePare 8 Final

- IPItDoc.'I7-8676 Piled 2-28-7I:8:46 aml'ny.of March 1977:. --..;~;-,-r 7, Envfronmelltat. Statement, the nVnft-r I

i:;FEDERAL.REGISTERr VOL'42r NO. Sy THURSDAY, MARCH 24,'977 1

~

f.

2

'a

.'C

~

', r sr-

. r'

MEMORANDUM FOR:

K. R. Goller, Assistant Director for Operating-Reactors, DOR FROM:

THRU:

SUBJECT:

Donald.M. Elliott, Project Manager, Operating Reactors Branch 83, DOR George Lear, Chief, Operating Reactors Branch P3, DOR STEAM GENERATOR TUBE LEAK AT TURKEY POINT UNIT NO. 4 On January 25, 1977, Turkey Point Unit No. 4 was shutdown to repair a'9 gallon per hour tube leak in steam generator 4C.

The leaky tube was determined to be in Row 45 Column 51.

This is the second Unit No. 4 shutdown resulting from a steam generator tube leak since December 3, 1976.

Since the leaky tube is adjacent to the previously plugged tube in Row 45 Column 50 (Nemo for K. R. Goller, from D. M. Elliott, January 25, 1977),

FPL also plugged the tube in Row 45 Column 49 in a ef'fort to prevent recurring leaks in this area.

The tube leak was determined by FPL to be located at or just below the bottom support plate.

Following the plugging operation for the above two tubes and during the secondary system pressure

check, a slight leak was detected in the RoQ 22 Column 56 tube.

FPL also plugged this tube.

The leak location within the tube was not determined.

The tube leaks were not associated with small bend radius tubes.

Unit No. 4 was returned to power, following tube plugging, on January 30, 1977.

cc:

M. Fairtile D. Eisenhut L. Shao F. Almeter B. Liaw R. Stuart J. Scinto (OELD)

S. Goldberg (OELD)

Donald H. Elliott Operating Reactors Branch 83 Division of Operating Reactors DISTRIBUTION Docket ORBg3 Rdg TJCarter DElliott GLear CParrish SURNAMCW OATC~

ORB83 E11iott.: cr 2/ M /77 ORBP3 GLear Gjj-f 2/

2-

/77

., 772 i,60023.<'.

PONn AEC 318 (Rcr. 9-S3) hXChC 0240 Q U. C, OOVCRNMCN'r PRINTINO OrrlCCI IOTA CZe 100

4

~ I

'4 444=

~

I I jI" D

't I

4

~.

~

~ "4 tf I

4 WP

~ 4 Dc-t tf lc It Il 4

4 ID I 4 ~

4 '4 ~

4 4 P

H C I

~ 4

~

4444

~ 4

<<4 4

4 4 I't 4

4

~

f I

~ '

b P*

~

a PW SHE

~

'H 411 t14 1

WWI' )

Ht 14

~ Ef' 4

'ij

4. ~

-4 4 IfI

, II<<

4 I

IDPI f lt

~

cf

'I P

4 L -

tlj'i

.Ilcjj 4 ll 4

~

~

P fft4 CDW" H

4(4 tf c

I-t ll 14

~

\\HH tl

'l 4

4 tl fc ffi 4

4 fft

~

W,,j 1

I 5148 NOTICES denberatlve process and te thus-subf<<t to 'ain unchanged although tho Unit No:

- Tbfs <<'ndment modffles the Tech-exemptlon (5) of the Act.

4 Technfcal Specfflcatfons willbo modf-nical Speclflcations by lowering the trip Authority to eicos meeting:

bahts d 'fled to reflect tho revisions to the Unit Ievcl,setpoints for'the differential pres-mlnatlon was made by tho committee hfan-No. 3'Technical Syecfflcatfons..

sure=instruments associated with )he gement Omcer p The applfeatfen for the amendmentS HPCI Turbine Stcam Lin mlttee hfaaagemcnt omcer wse delegated tho compiles-wftII the standalds.

and re-trfp.

~ ~".

~

authority tomakodetermlnstlonsby thoDI-quirements of the Atomfc Energy Act The appHcatfon for the 'amendment, rector, NSP, on y'cbruary IL1876.,....

Of 1954, as amended (the Act), and the compHes vifththe standards and requlre-M REBBECCA WINKLER Colnmission's rules and regulations The ments of the Atomic Energy Act of 1954, Commission has made appropriate find-as amended (the Act), and thb Commfs-entcrlt Olfter fngs as requfred by tho Act and the Com-sion's rules and regulations, The Com-mfssfon's, rules and regulations fn 10 mission has made appropriate findings JANUARY 24, 1977.

CFR Chapter Ir which are sct forth fn as required by tho Act and the Commis-IPn Dcc 77 2~643 Flied I 26 77 8'45 smi

. the license amendments.

Prior pubHc

" sion's rules and regulations in 10 CFR

'otice of these amendments was not re-Chapter I, whfch are sct forth In the quired since the amendincnts do not fn-license amendment.

Prior public notice NATIONALSCIENCE FOUNDATION volve a significant hazards consfdera-of this amendment wl(snot required since ADVISORY COUNCIL, tion.

'the amendment does not involve a sig-Revfsfon of Charter The Commission has determined that, nfflcdnt hazards consideration...

the issuance of these amendments will The Commfssfon has determined that

'not result & any sfgnfflcant environ-the issuance of this amendment willnot mental fmpact and that pursuant to 10 result in any sfgnlflcant environmental Foundation Advisory COIIncfL'FR 51.5(d) (4) an environmental fm-'mpact" and that pursuant to 10 CFR SL5 pact statement or negative declaration (d)(4) an environmentaI Impact state-Yfsory Council was estabHshed.

On and environmental impact appraisal

'ment or negative declaration and en-March8,1976toprovideadviceandcoun-neednotbepreparedinconnection with vlronmental impact apprafsaI need not sel to the NSF Director and principal issuance of these amendments.

be prepared-in'connection with issuance members of hfs staff on Foundation-wide For further details with respect to this'f this'amendment.

issues.

This revision wfH Provide <<r

action, see (1) the appHcation for For. further detafls with ~esPect to membership on the Council of non-amendments dated December 21', Ig76; this action, see (I) the appHcatlon for scientists as well as scfentfsts.

as suppIemented by letters dated Decem-amendment date/

December 17,'9V6.

The revision described above fs re-ber g, December'22, december 30, 1976

- (2) Amendment No. 26 to License No.

tlected in the Council's modffled charter.

and January 3, 1977 (2) Amendments, DpR-49, and (3) the Commission's-re-Copfes of the charter addendum Ilute the Nos. 22 and 21 to Licenses Nos. DP~I lated Safety Evaluation. All of'hese initial charter, have been forwarded to and DP~I and, (3) the Commission's items are available for public fnspectfon the Library of Congress for Public in-reiateh Safety Evaluation.'Ml of these at the Commission's PubHc Document syectfon and fHed with the standing corn-.

items are available for pttbHc inspection Room', 171V H Street, N.W., Washington.

mfttees of Congress havfng Iegislative at the Commission'8 pubHo Document'.C. and at the Cedar Rapids Public Li-Iurfsdfctfon of the National Science Room 1717 H Street, N.W;, Washington, brary,'26 Third Avenue, SX., Cedar.

Foundation.

. D.C. and at the Envfronmental;and Ur-RapMs, Iowa 52401.

ban Affafrs library, Florida Interna-A.copy of items. (2) and, (3) may be tional University, Miami, Florida 33199.

obtained upon request addressed to the Acopy of ftems (2) and (3)'ay be ob-UB. Nuclear Regulatory Commission,

[PR Doc.77-2641 Pued I-26-77;8:45 am I tained upOn requeSt addr4Ssed to the WaShingtOn, D.C.

20555, AttentiOn:,

U.S.

Nuclear Regulatory Commission,

Director, Dfvtsfon of Operating; Re-NUg EAR REGULAfpR(

Washington, D.C 20555, Attentfon: Df-actors.,

~

~MMISSIpN

-rector, Division of Operating Reactors.

Dated at. Bethesda." Maryland, thfs-Dated at Bethesda, Maryland, this 14th lVth day'of January 19'lV; keR N~ ~2M a d ~251],

d'ay of January 19VV

. ~.;

For the Nuclear Regulatory Com-.

'LORIDA POWER AND LIGHT CO.

For the Nuclear Regulat ~ C~f mission..

- ~'-

. ~'-

  • ,Issuance of Amendments to Faclilfy-sfon.

Ol"mongucen~

~

~ "..

GMRGEL 8,

Branch N0.3,Dt~onojO Notice fs hereby given that the UB..

Chfej, Oye"attng Reactors':

erdttnp Reactors.

Nuclear ReguIatory Commfss on (the

+I R-t

~

IPR D<<.77-2283 Filed 1-26-77;8:45 ~L Branch No 3;

Dfofsion oj Commfssfon) has issued Am dments ",Opel'g edc ors NOS. 22 and 21 tO FaCIHty Oyeratfng Li-IFR Doc.77-2282 Piled I-26-77;8.45 smi CenSeS NOS. DPR-3I and DPR-41, re-

".~, IDoceetNo.50-267I spectfvely, ssued to Florida Power a d.

IDocheqNG,56-33 I PUBLIC SERVICE COMPANY OF'yec~cggfpns for operation of the Tur IOWA ELECTRIC LIGHT AND POWER

~ --, ',,

i,COLORADO key Point Nuclear Generating Units Nos-=,

CO v T, AL.:

Issuance of Amendment to Facility, 3 and 4; located fn Dade County, Flor-

=

Issuance of Amend(nent to Facility,

'perating Ucense ida.. The amendments are effective as of.,

OperatinKLlcense Notice fs hereby given-that the U.S.

the date of issuance

. Tha UZ. Nuclear Regulatory Commis Nuclear RegulatoIVr Commission-(the These amendments concern changes sfon.

(the.

Commission)

has, issued Commission) has issued Amendment No:-

required. as a result of (I) the steam Amendment No. 26 to FacfHty Operating 17'o Facility OPerating License No.

generator repair and (2) a reevaluation License No. Dp~g issued to Zowa Elec-'

DPR-34 Issued'o PubHc Service Com-of the erne'rgency core cooling system, trio Light and power Company, Central-pany of Colorado which temporarHy re-for Turkey Point Unit No: 3. The orner-Iowa Power Cooperative, any Corn Belt. vfsed Technfcaf Specification for gency core cooling system reevaluation operation. of the Fort St. Vrafn Nuclear fulMs; for Unit No. 3 the requirements Power Coop at ve" which revised Tech-G nerath g Station, I~t d fn Weld of the Commission's Order for Modfflca-nfcaI Speciflcations for operation of the County, Colorado. The amendment was

- tion of-License dated August.27; 1976.-. Duane Arnold Energy Center, located in-effective on December g, 1976.

~

The 'operating Ifmfts for.Unit No;4 set. Linn County, Xowa The. amendment ls

. The amendment temporarHy'evised forth fn its Technfcal Spscfflcations re-effectfve as of,its.date of fssuance..

the provfsfons fn the. Technical Specifi-

"1C r

F P r' 4

f t

RD8tAl;REGI57ERt.votr. 42'Q rs'III~AT;-'TANIIAIIw'51 J 'HPFI j

~,

0

~'tl s

w r

f catf ing.

cool telel the-seve one ino tors cern tion the fro perl

- tfon

'o me as m

4CO in mi Ch

- lice of sine sl

- the res imp 51.5 or:

me pre th D

17'o All fns Pu Q

A ob U

tfo Ma of'io

~.M V

TH to f$

/

4 'T

~,,

'%~Pc

Q /III/TA'ff~

/=MS aW

~j JQf I P lg77 Docket No. 50-250 HEttORANDUN FOR:

K. R. Golfer,.Assistant Director for Operating Reactors,'OR FROM:

SUBJECT:

D.

G. Eisenhut, Assistant Director for Operational Technology, DOR TURKEY POINT, UNIT.3 PROPOSED REVISIONS TO TECHNICAL SPECIFICATIONS PLANT NAfIE:

Turkey Point, Unit 3 DOCKET NO.:

60-250 RESPONSIBLE BRANCH AND PROJECT.NNAGER:

ORB83, Donald H. Elliott OPERATING KECHNOLOGY BRANCH INVOLVED:

Reactor Safety Branch The Reactor System Branch has reviewed the revision 4o the Technical Specifications for the Turkey Point, Unit 3 Plant.

This revision has been proposed by the licensee based on a reana1ysfs of,the ECCS performance with upper head temperature equal to the hot leg temperature.

Our review has indicated that the submitted rivision is acceptable provided the value of peaking factor in the revised specifications is changed too:

2.22.

Enclosure:

as stated Darrell G. Eisenhut, Assistant Director for Operational Technology Division of Operhting Reactors cc:

V. Stello R. Baer

.G. Lear C. Berlinger F. Coffman S. Meiss D.

, N.

. K.

N.

Elliott Fletebher Parczewski Anderson DISTR IBUTION Central Files DEisenhut RSRd.

KParczewski Rd DOR: RS, (I $P KParczewski:


6%-

1/ $

/77 OFFICC~

CURNAMC~

DATC~

POTID hEC-318 (ROT. 9-33) hEWf 0240 DOR.: RS..~......

CBerlinger DOR:RS RBaer OQ.. ',..... LO.T..

DEi u

1/

/77 1/ P /77 1/ t /77 Q U, 2, OOVCRNMCNT PRINTINO OF ICCI IOTA 22II I06 772160026

I I 1

I I'

J

DEt: 07 1976 MEMOKQH)UM FOR:

Harold R. Denton, Director, Division ok Site Safety and Environmental Analysis PROM:

Victor Stello, Jr., Director, Division of Operating Reactors

SUBJECT:

REQUEST FOR REVIW OF METEOROLOGICAL DATA IN SUPPORT OF DECOM1ISSIONING THE TtJRKEY POINT METEOROLOGICAL TOVTBR PLQFZ N&K:

Turkey Point 3 and 4

DOCKET NUMBERS:

50-250 251 LICENSING STAGE:

Licensed PROJECT MANAGER:

D. Elliott RESPONSIBLE BRANCH:

ORB-3; EEB

. REQUESTED COMPLETION DATE:

February 2S, 1977 This is a request for technical assistance in reviewing data submitted by Florida Power and Light in support of decommissioning the Turkey Point meteorological tower.

The licensee proposes to use data telemetered from the South Dade meteorological tower in lieu of using the station tower.

He request that the Hydrology-Meteorology Branch review the data submitted and determine whether the South Dade information is adequately representa-tive of the Turkey Point site from the standpoint of determining the im-pact of routine effluents and accidental releases and whether the proposed telemetry of the data is acceptable.

A copy of the licensee's submittal is being transmitted to E. Markee with his copy of this memorandum.

Victor Stel o, Jr., Director" Division of Operating Reactors Office of Nuclear Reactor Regulation

Enclosure:

As stated cc:

See following page

Contact:

E. Adensam, EEB/DOR 28066.

DISTRIBUTION.

Central Files EEB Reading V. Stello E. Adensam D. Davis

@-Wo

~ /.

E R

EE D

EA e am br B

12/j /76 12/ i /76 SVRNAMCW OATSW Form hEC 318 (RST. 9-53) hBCM 0240 DO enhut 12/

/76 f/DO,'-

VSte lo 12/ 1/76 k UI Sl OOVSRNMSNT RRIIITINO ORRICEI 1074 SSS ISS

F ~ 1

~

1

, ~

I I

er

~

~

L 1

rh PT l

r ll PI

~=

)

1

~

P,y LI I'lh r-"

1 k

~ ffg y r I'

~:

UQ Y

Pl 1'

~

"1'

~ e P

ll'

~

~ Li ~.

7 1

~

1 1'I 1 ~

11

~ )1 I

glf

~

1 fh

~

1

~

h P

1 1

rer 1'

JUL 6 1978 Docket Hos. 50-250 and 50-251 tlEttORANDUM FOR:

Dohn T. Collins, Chief Effluent Treatment Systems. Branch, QSE FROM:

SUBJECT':

L. G. Hulman, Chief Hydrology-lleteorology Branch, GSE METEOROLOGICAL INFORMATION FOR TURKEY POINT APPENDIX I ENLUATION Lle have determined that meteorological data from the South Dade site would be most appropriate for the Appendix I 'evaluation at Turkey Point.

However, a complete annual cycle of meteorological data from the South Dade site has never been submitted to the staff.

Before we can complete our meteorological assessment

'for the Turkey Point Appendix I evaluation, we need an acceptable response to the following request for additiona'I information:

\\

Several years of onsite meteorological data from the South Dade site shou'Id'e availab'le.

Provide joint frequency distributions (in the. format described in Regulatory Guide 1.23) by atmospheric stability (defined by the vertical temperature gradient between the ll.G m and 57.9 m levels) for the South Dade site for at least a tw>>year period of record.

Data recovery for the entire period should be greater than 90$.

Hourly averaged data may also be provided on magnetic tape using the enclosed format.

oy letter of Nay 15, 1978, Florida Power and Light Company submitted additional information concerning the proposed decommissioning of the present Turkey Point meteorological measurements program.

This additional information does not affect the meteorological assessment for the Turkey Point Appegdix I evaluation.

DISTRIBUTION Original 0'gael bF DSE Rdg N

L. G. Hulman HMB Rdg

~

L, G. Hulman, Chief Docket Fi 5 -

~

'ydrp]ogy-ileteorology, Branch Division of Site Safety and Environmental Analys is cc:

E. Narkee M. Burke 78i56Q260 ORRICR+

St)RNAMR~

,DATR~

i. rairobe DS
SE:Sf' srobent jdEHMP 07/~/78 07/O~78

'ÃB n

07/36/78 NRC FORM 318 (9-76) NRCM 0240

% Ul $ OOVRRNMRNT PRlNTINO OlrlrlCRl 10Th>> 04~23

E

~

'J P

a 1

L ff

~ I

~,

J t

v C,

tf, t

E V

k

'v P

~

'I a

P

~ E E

V t

L IV

, ~ if

'I a

J a

~

I t

E V

w I~

a LL

~

) 'PP 1

1 I

V I V

. I ~

11 ~

1"

~ I

~

IV

'I

'1 E

f

E JN"

~

I

'V, P'

~

I'

'I P

Pt-

~

~

a "I

'\\g 4

~ va 1

1 a

V I

V

'ft V"'. ~

EC V

V I=

1

~

'I' yd'.~ ~q>d 0;NVkgfao I G.

1 fPP PG

~ rX i ~

r If F

~

P

'J I

I 1

, ~,

I E

I J

, if VEI II, t

L VPL) 'N F

~ 2 -'*

11 "

I

'I P

P, V

I N

I

JULY 9 4 1978 FLASH NOTE TO:

A. Schwencer, Chief, Operating Reactors Branch 81, DOR FROM:

SUBJECT:

Marsha11 Grotenhufs, Project Manager, Operating Reactors Branch 8'1.

DOR TURKEY POINT 3 - STEAN GENERATOR TUBE LEAK Qn July 19, 1978 a small leak was detected, fn Turkey Point Unit 3 Steam Generator C.

Monitoring the leak all day 7-20-78 to determine the magnitude, it was found to range from 0.106 gph to 0.177 gph.

(Technical Specifications limit permits up to 0.3 gpm or 18 gph).

Monitoring of the leak is continuing.

Present plans are to bring Unit'2 (fossil) back on line as soon as possible, shut down Unit 3 for repafr and hold Unit 4 at SOS power.

This fs expected to delay Unit 4 shutdo)In for refuelfng and steam generator inspection by approximately one week from the scheduled date of August 1, 1978.

cc:

D, Eisenhut B. Grfmes V. Stello J. Scinto S. Goldberg R. LaGrange B. D. Lfau Original Signed BY'arshall Grotenhufs, Project Manager Operating Reactors Branch 8 Division of Operating Reactors DISTRIBUTION

~~Nfl!)

ORBgl Reading MGrotenhuis CParrish ORBk'1 Subject File x27433: t%""

CURNAMCW 7/24/78 DATC~

ORBj/1 Mgrotanh.u.i.s....,....

7/Pt/78 NRC FORM 518 (9.76) NRI 0240 6 U 8, OOVCRNMCNT PRINTINO OPPICCI IOTO CC~+

~.'

I l

'I

~

II p>>

V

~

I P

C F

I I

4 J

fl II

(

(

C>>

I, C>>f f

~ 'l V

F V>>

f

' ll h

f, F

f ~

ll

~

I I

V V

f

~