ML18227C569

From kanterella
Jump to navigation Jump to search
Federal Register Notice
ML18227C569
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/31/1978
From: Lear G
Office of Nuclear Reactor Regulation
To:
References
Download: ML18227C569 (95)


Text

NOTICES 5ilV P5fr0-0).1 The amendment walves the.requfrc- Idn Power A Light Co., for operation

[Docket No.60-334) ment to perform weekly quantltatlvc of the Turkey Point nuclear genera san>pllng of ffsft and shellfish from fng unit No. 3 located ln Dade County, DUQUEstfE LtoHT coMpAHY, ET AL, the intake screens durIng the perfod Fin. The tunendment Is effective as of II intake canal modifications are being the date of Issuance.

'I O'Thc i'tcense

~'.r'i[co<<tt on Am!<<me>> <<<<ctttty OPerattntt U.S. Nuclear Regulatory Com.

conducted. The requirement to Pcr.

form dally vtsual checks of the screens

)>nsbeenretalned.

The amendment to the operating li-cense will allow continued operatfon of Turkey Pohtt upset go. 3 for lite next mlcslod on January 2V, 19V'I, published The application for the amendmrnt, sfx equfvafrnt,fttff-power months of fntheFsvsa4[.Rsorsrxn,42pR5155,n complfes with the standards and re- operatfon (EFPM) at which time the "proposed issuance of the Amend. qulrements of the Atomic Energy Act steam generators shall be Inspected,

.ment to'acflfty Operating Lfcettse" of 1954, ns amended (the Act), and the unless: (1) An inspection of the steam relating to the above-identified faclll- Commission's rules nnd regulations. generntors hns previously been per-

!J. Iy. The proposed nmendment would Thc Commission hns made formed within the six EFPM period, an fttcrease In the spend fuel nte findings ns required by the Act nnd npproprl-',permlt or (2) an acceptable ana)ysfs of thc storage capacity at the Beaver Valley the Commission's rules nnd rcgula- susceptibility for stress corrosion Power Station. An opportunity was af- tfons In 10 CFR Chapter I. which nro craclcfng of tubing Is.submitted to ex-

'r 4forded to a hearing interested parties to request with regard thereto.

Tile City of Pittsburgh flied a peti.

'riorset forth fn" the license amendment.

'as public notice of this antendment not required since the amendment, plicitly Iustffy continued operation beyond the authorized six EFPM period.

tlon to Intervene nnd requested n hcar- does not Involve a significant htuwrds Thc applfcatfon for the amendment

~4,'Ing In response to the above notice In consideration. compiles with the standards and re-

, Lhe FsnzscAT. Rrarsxzn. That petition the Commission hns prepared an en- quirements of the Atomic Energy Act Q .<<as granted and a hearing ordered by vironmental impact appraisal for the of 1054, as amended (the Act), nnd the

'he Atomic Safety and Licensing revised technical specifications and Commission's rules and rcgctlntlons.

Board which had been established to has concluded that nn envlrorunenl.al The Commission hns made npproprl.

hear such petitions, Notice, of this impact statement for this particular ate findings ns required by the Act nnd q~,action was publlshecl ln the Fzvxtchr action Is not warranted because there the Commission's rules and

~

4 Rzatsrsn, 42 FR 18450, on APrfl 7, will be no environmental impact at- fn 10 CFR Chapter I. which nrc regula-'ions

.197'I. tributable to thc action other than set forth fn the license amendment.

~ Please take notice that the evlden- that whfch has already been predicted Prior public notice of this Mnendmcnt

~r gjfflary hearings In this proceeding will and described fn the Commission's tfgconunence at 1:30 P.m., March 13 wns not required since the amendment final envlromnental statement for the ie gyes.1978, at, the Nuclear Regulatory Com. facility. does not Involve a significant hazards ygmfsslon Endearing Room, 5th Floo r For further details with respect to cons[ dcratlo.

The Commfsslon has determined tt,y, East/West Towers Building. 4360 this action, see. '(1) The application for

'jjEtLst/West EIlghway, Bethesda, Md. amendment dated Novembet 8. 1977, that the issuance of this amcndmcnt cvf)l not result In any'significant envi-

., VyItfssoordered. (2) amendment N'o. 12 to license No. ronmental Impact and that pursuant DPR-'l2, and (3) the Com)nfssfon's re- to 10 CFR II 61.5(d)(4) an environmen-For the Atomic Safety and Lice Ing tal impact statement, negative declara-All of these items are ava[IPapblc for tion or environmental impact apprals.

Issued at Bethesda, Md., this 1st day pub)ic fnspectlon "at thc Commission's

~ ~

nl need not be prepared fn connection of February 1978. Public Docutnent Room, 1717 H Street with issuance of this amendment.

Ivy W SM[2H NW. Wnshfngton, D.C.. and at Ihc

~

For futher details with respect to afr7ttatt Crystal River Public Library, Crystal ~

this actionscc: (1) The application for 2-6-78; am)

River, Fla. A copy of Items (2) and (3) ~

amendment dated December 20, 1977,

.<rr [FR DOC. 78-3241 Piled 8:46 may be Obtained upOn requeSt ad- as modified by letter dated January 4; dressed to the U.S. Nuclear Regula-

~

18, 1978, (2) amendment No. 32 to ll-

,4 + [7590-OI j tory Commission, Washington, D.C. ~

cettse No. DPR-31, and (3) the Com- ~

2055. Attention; Director. Division of

~

mission's related safety evaluation. All Opcratht g Reactors. of these items are available for public FLOR[DA POY(ER CORP. ET AL. Dated at Bethesda, Md.. thfs 23rd inspection at the Cotnmfssfon's Public day of January 1978. Document, Room, 1V17 H Street IAV.,

bcvance of amendment to Facility Operatlntt Washington. D.C., and at the Environ-Ltcenco and Negative Dectarolton For thc Nuclear Regulatory Com- mental ancl Urban Affairs Library, mission. Florida International Unlversfl y, The U.S. Nuclear Regulatory Com-mission (thc Commfsslon) has Issued Miami. Fla. 33199. A copy of Items (2) ramendment No. 12 to facility operat and (3) may be obtained upon request "kg license No. DPR-V2, issued to the ernt~fng Reactors addressed to the U.S. Nuclear Regula.

Florida Power Corp., city of A)achua, tory Commission, Washington, D.C.

<,< City Of BuShnell, City Of QafneSVffie, FRDoc.78-3242Filed2-6-78;8:45mn) 20565, Attention: Director, Dlvlslon of ktg city of IC[sslmmee, city of Leesburg, Operating Reactors.

a+ city of Ncw Smyrna Beach and Utlll- [7590-01]

II/sties Commission, city of New Smyrna Dated at Bel,hesda, Md., this 31st

-.I-."" Beach. city of Ocala, Orlando Utilities [Docket No. 50-250) day of January 19V8 Commission nnd city of Orlando, Sebr-Ing Utilities Commission, Setnlnole FLORIDA POWER 8 LIOHT CO. For the Nuclear Regulatory Com-

,QEIectrfc CDDPeratlve, Inc., and the city mission.

~ of Tallahnssec (the licensees) which

'e4 revised technical specifications for op-fccaance of Amenctment to Factttty Operallny GEonoE LEAR, The U.S. Nuclear Regulatory Com- Chfef, Operating Reactors

<-> eratlon of the Crystal River unit No. 3 f+j nuclear generating, plant located ln ~ mfsslon (the Commission) hns issued Branch No. 3, Dfvfsforc of Op-

~<<'itrus County. Fla. The amendment Is amendment No. 32 to facility operat- erating Reactors.

effective ns of the date of issuance. Ing lfcensc No. DPR-31, issued to F)or- [FR Doc. 78-3243 Filed 2-6-78; 8:45 am)

FEDERAL REO[STER, VOL 43, HO. 25 TUESDAY, FERRUARY l, )978

f

'4 I I

4890 NOTICES e Issued: February 1, Samoa which may be entered free of Amendment No. 31 to Facility Operat-1978.'ENNETII R. MASONr duty during calendar year 1978. ing License No. DPR-31. Issued to Secretary. By order of the Commhslon: Florida Power and Light Co., which re-Issued: February 1, 1978. vised Technical Specifications for Op-

[FIL Doc. 78-3174 FIIed 2-3-78; 8:45 sm)

KENNET)I R. MASotir eration of the Turkey Point Nuclear Secretary. Generating Unit lfo. r7, ]00ated in

[7020-02] Dade County, Fla.fI'pe itn)eitdment ls IFIL Doc. 78-3176 Flied 2-3-78; 8:45 am)

(332-86) cffcctivc as of the date of issuance.

The amendment authorizes oper-Y/ATCH MOVEMEN'TS ation of Turkey Point Unit No. 3 with

[7537-0'I ]

Collection of Data for Determination of NATIONALFOUNDATION ON THE up to an average of 15 percent of the Apparent U.S. Consumption steam generator tubes ln a plugged ARTS AND THE HUMANITIES condition.

AGENCY: United States International Trade Commission. VISUAL ARTS ADVISORY PANEL The application for the amendment ACTION: Creation of a permanent Meeting compiles with the standards and re-docket for the collection of data under quirements of the Atomic Energy Act the authority of section 332(b) of the Pursuant to section 10(a)(2) of the of 1954, as amended (the Act), and the Tariff Act of 1930, as amended (19 L. Federal Advisory Committee Act (Pub. Commission's rules and regulations.

U.S.C. 1332(b)). to determine apparent 92-463), as amended, notice Is The Commission has made appropri-U.S. consumption of watch movements hereby given that a meeting of the ate findings as required by the Act and pursuant to Pub. L.89-805 of Novcm- Visual Arts Advisory Panel Commission's rules and regula-bcr 10, 1966 (60 Stat. 1621. 1522). to the National Council the (Arthts'ellowships) on the Arts will bc held 1 ebruary 22, tions in 10 CFR Chapter I, which are EFFECTIVE DATE: January 27, 10'l6. 1978, from 9:30 a.m. to 6 p.m.; Febru. sct forth in the llcensc amendment.

FOR, FURTHER INFORMATION ary 23, 1978, from 9:30 a.m. Lo 6 p.m., Prior public notice of thh amendment CONTACT: and February 24, 19V8. from 9:30 a.m'o was not required since the amendment Mr. Lee Lukens, General Manufac- 1115,6 2401 p.m. In Columbia Plaza Room does not involve a significant hazards tures Dlvhlon, United Slates Inter- D.C. 20506. E Street NW., Washington, consideration.

national Trade Commission, 701 E The Commission,has determined Strcct NW., Washhtgton, D.C. 20436, Panel Thh meeting Is for the purpose of that the issuance of this amendment review, discussion, evaluation, will not result In any significant envi-tele pl tone: 202-523-0226. and rccommendai,lon on appllcatlons SUPPLEMENTARY INFORMATION: for financial assistance under the Na- ronmental impact and that pursuant Paragraph (c) of headnol,c 6, schedule tional Foundation on the Arts and the to 10 CFR 51.5(d)(4) an environmental

'l, part 2, subpart E, of the Tariff Humanities Act of 1965, as amended, impact statement or negative declara-Schedules of the United States re- Including discussion of, Luformatlon tion and environmental impact ap-quires the U.S. International'rade given ln confidence to the agency by praisal need not be prepared in con-Commission annually to determine the grant applicants. In accordance with nection with issuance of this amend-apparent U.S, consumption of witch the determbtatlon of the Chairman ment.

movemcttts for the preceding calendar published ln the FEBERAI. REdtsTER of For further details with respect to year and to use such dctcrminatlon as March 17, 197V, these sessions will be this action, see (1) the application for a basis for computing and allocating closed to the public pursuant to sub-the quota for watches and watch section (c) (4), (6) and 9(B) of section amendntent dated June 8. 19'l7 (as movements, the product of certain 552 of Title 5, United States Code. supplemented by letter dated July 11, U.S. Insular possessions, 'admissable , Further Information with reference 197V), (2) Amendment. No. 31 to LI-free of duty during tho following cal- to thh meeting can be obtained from cense No. bPR-31, and (3) the Com-endar year, under general headnote Mr. Robert M. Slms, Advisory Com- mission's related Safety Evaluation.

3(a) of the Tariff Schedules of the mittee Management Officer, National All of these items are available for United States. Endowment for the Arts, Washington. public inspection at the Commission's Thc detennlnatlon of consumption D.C, 20506, or call 202-634-6378. Public Document Room, 1717 H Street of watches and watch movements In RoBERT M. SIN/, 14W., Washington, D.C. and at the En-the United.States ls derived from pro- ArtmtntstraAve Offfccr,,National vironmental tIs Urban Affairs LIbrary, duction data, Inventories and exports Zndotomcnt for the Arts, Na-obtained from questionnaires comp)et Florida International Unlverslty, ed by the domestic producers; data on tiona/ Founrfatton on the Arts Miami, Fla. 33199; A copy of items (2) imports for ct)nsumptlon, and ship- and thc Humanities. and (3) may be obtained upon request ments from the insular possessions JANUARY 31, 1978. addressed to the U.S. Nuclear Regula-will be taken from official statistics IFIL Doc. 78-3064 Filed 2-3-78; 8:45 am) tory Commission, Washington, D.C.

complied by thc Department of Com. 20555, Attention: Director, Division of merce, Bureau of Census. Operating Reactors.

The Commission ls required to deter- [7590-Ol]

mine thc apparent U.S. consumption NUCLEAR REGULATORY Dated at Bethesda, Md.. this 27th of watch movements, in 197V and on or day of January 1978.

before April 1, 1978 report such deter- COMMISSION mination to the Secretary of the Trea- (Docket No. 50-250) For the Nuclear Regulatory Com-sury. the Secretary of'he Interior, mission.

and the Sceretary of Commerce and to FLORIDA POWER AtID LIGHT CO.

publish such detennlnatlon in the STAIILEYJ, NowlcKI, Issuance of Amendments to Facttity Operotina Acting Chfaf, Operating Reac-FEBEIIAI, REOIsTEtt, together with the Ltcense tors Branch No. 3, Dtvtstott of number of watches and watch move-ments which are the product of the The U.S. Nuclear Regulatory Com- Operatittg Reactors.

Virgin Islands, Guam, and American mhslon (the Commission) has Issued (FR Doc. 78-3060 Filed 2-3-78; 8:45 am)

FEDERAL REGISTER VOLe 43r NO 25 MONDAYr FEBRUARY 6 1918

"~

l

G'3b2!i NOT CES will not result in any significant, envi. was nol, required sl< ce thc amendment rcvisrd by Amcndmcnt Nos. 1, 2, 3, 1'on<lien!,al Inlp'<cl, '1nd Lh'll, pursuant, docs not involve a ignlfleant )mgards an<i 4 bc accepted as iircir application to 10 CFR 51.5(d)(4) an environmental consideration. for a 40.year op< rating license.

impart.,taLcment or negative declara. The Commlsslo< has dctcrmh1cd In connection wlLh a petition fil<d Lion and cnvlronmcntal Impact, ap- that thc issuance of this amendrncnt by Central Power and Ligl<t Co. re.

p<'<isal need not be prrparcd in con. will noL result, in any significant rnvi- qucsLing an anI,ILI>>-t I)raring, lioua ncction with issuance of this amcnd- ronrnental impact and that, pun)uant ion Llg))LID)I i'~ I'<rw<;r L'I). /II(<l a menl. For further details with rcspccL I.o 10 CFR 51.S(d)(4) an cnvironmcntal motion,on p<<bt use 10, Ipff, ivilh the to !his action, sco (\) Lhe appllcailons Impart, statement, negative drclaratlnn Coma)lssloi) Iri<rsuani lo IU,C:I'13 2.768 for <uncndment daLcd May 17, and or environmental hnpact appraisal for waiver of Lhe requlrrmcnl that a August 12. 1977, (2) hmendmcnt No.

~

nccd not. be prepared in connection Final Safety Analysis lteport be filed 3g to License No. DPIL-20. and (3) the with issuance, of this amendmcnt. at the same lime as the application for Co<n<nisslon's related Safety Evalua- For further details with,respect lo an operating license, in order Lint the tion.'All nf these Ite<ns are available LhLS action, sec (I) the appllcallon for review of 'Lhe Mill'trusL Ir"ues could for public Inspection at thc Commis- amendment dated October 4, 1976, begin. By Memorandum an<) Order s!on's Public Document Room, 1717 H which wa." superseded in its entire!.y date<i June 15. 1977 (Houston Light c<:

S!rect NW.. Washington. D.C., and at by letter dated Decembe< 21, 19'I6 (as Power Co., eL al. (South Texas Pro)ect, the Kalamazoo Public Library. 315 supplemeni,ed by letters dated Janu- Unl!, Nos. 1 and 2), CLI-77-13, 5 NRC South Rose Street, Kalamazoo, Mich., ary 7 and February 16, 1977), (2) 1303 (l 977)). thc Comnllsslon decided 49006. A copy of items (2) and (3) may Amendment No. 30 Lo License No. Lhat. Iu< ther consideration of antit< us!,

bc ob!,alned upon request addressed to DPE3-31, and (3) the CommLsslon's re-Issues should lake place in lhe context lhe U.S. Nuclear Regu)atory 'Commis. lated Safety Evalual,ion. All of thcsc of an operating lire<use procreding and sion. Washington, D.C. 20555, At!en Items arc available for public inspec-tion: Director, Division of Operating tion at the Commission's Public Dont- granird ihe wn!ver lo peru<It early Rrari,ors. ment Room, 1717 H Street, NW., submission of the appiicatlo>> and con-Washington, D.C., and at the Environ- slderal,ion of'these Issues.

Dated at Beihcsda. Md., this 28th mental and Urban Affairs Library, On August 25, 1977, thc Office OI day of November 1977. Florida Nuclear Etenctor Regulation requested Intenmtional Unlvcrsily.

For l,he Nuclear Regulatory Com. Miami, Fla. 33199. A copy of items (2) the advice of the Attorney General on m i as Ion. (3) may be obtained upon request ad- the a<rtitrust matters pursuan! Lo sec A. Sci I wzN ca a, dressed to the U.S. Nuclear 13cgula- tlon 105(c)(l) of the Atomic Encrgv Chief, Operating Reactors tory Commission. Washington, D.C. Act <>f 1954.

Branch No. I, Division of Op- 20555, Attent!on: Director, Division of Nolircs of rcctlpt of the rnnainlng era t f Dg Rcncl ors. Operating Reactors. porLlons of the '<ppllcatlon dealing I FR Doc. 77-38157 Filed 12-19-77; 8:45 an>) Dated at Bcl,hesda, Md., this 13th with rad!ologlcal healLh and safety dav of December 1977. matters (Final Safety Analysis For the Nuclear Regulatory Com- Rcpori) and envlronmenlal mat!e< s t7590-01] (Envh'onlnental Repol'I ) <vill i)c Out) ~

IDockeL No. 50-250] n<ission. lisi<c<i by the Comn1lcslon upon ilrcir FLORIDA POWER AND LIGHT CO.

Gzoaox Lr~n, receli.!and notice of opportunity for Chief, Opera( fr< g Reactors hearing will be>>ublished at lhe appro-I<<vance of Arnondrnen< lo Faci!Ily Oporallng Branch No. 3 Diufsfon of Opcr- priate Iinu!. It is anticipated l,hat the Licenco aOng Reactors. Final Safety Analysis Report and the (FR Doc. 77-38158 Filed 12-19-77; 8:45 an>) Envlronnu)ntal Report w!II be subn<it-The U.S. Nuclear Regulatory Com- tcd about hpr II 1978; mission (thc Commission), has issued A copy of the application (Applica-hmn1dmenl No. 30 to Farillty Operat- [7590-01] tion and Amen<!men!, Nos. 1 to 4) and ing I.!cense No. DPR-31, issued l,o [Dockei Nos. STN 50-498, STN 60-499, STN tire Con<<nission's Mcmo<andu<u an<i Florida Power and Light Co., which re- 60-498A, and STN 60-499A) Order, <laled Junc 15, 1977, are a<gil-Technical Specifications for Op. 'lsr.d a!)ie fol'uirllc lnspccLlon ai !he Coul-eration of the Turkey Point Nuclear HOUSTON LIGHTING 8, POWER CO., ET AL m!as!on s P<lblic Docun)eni, Iloom, Generating Station, Unit No. 3, locat- of Applicaiion for Opora<ing LIconco ed ln Dade County, Fla. The amend- Receip< 1717 H Stree!, NW., Wash!>>I:ton, D.C.

mcnL is effective as of the date of issu- Houston Lighting & Power Co., on 2055S, an<! a! the lo<'al public docu.

ance. its behalf and as agent forthc cllv of n<cnt room located In the Maiagcrda Thc a<nendmcnL will modify operat- San Antonio, Central Power and Light County Courthouse, 1700 SevenL)1 Ing limits in the Tcchnical Specifica- Co.. and the city of Austin (the appli- Sircct. B~y City, Tex. 77414. Coi!i<s of tions to allow operation nf Unit Iio. 3 cants). pursuant,to section 103 of the li<e Co:ninisa!Or s Memorandum an<!

at Lhe orlghml design condition of Atomic Energy Act of 1954 as amend. Order. dated June 15, 1977, n:ay br ol> ~

2250 psla and 546.2'F inlet. tempera- ed, filed with the Nuclear+egulatory talned by a r"ques! addresd<d to tire ture. The changes will also increase Commission (!he Commission) Amen<i. Director. Div!sion of Pro]ert liana~< ~

the allowable fuel residence time to ment No. 4 to their application to con- ment. U,S.Afar<<r Nurlrar Regula'ory C"no< ~

27P00 effcrtive full power hours. s!ruct and oprralc two pressuri".ed mission, Wmh!ngton, D.C. 20555.

The application for lhc amendment, walcr reactors known as thc Sout'h Dated a! Be! hepda. Md.. Ihls 9th dwv complies with the standards and re- Texas Prospect which are located ap. of Decrn<ber In77.

qulremcnb of thc Atomic Energy Act proximately 15 mlles southwest,of Bay For thc Nur!ear Rcrulainry Cnm.

of 1954, as amended (the Act), and Lhc City on the west side of the Colorado Commission's rules and regulations. River in Matagorda CouDty, Tcx. miss! On, The Commission has made appropri- Amendment No. 4 filed on August 24, Pr.h < I;. I'A<<11.

ate findings as required by the Acl, and 1977, contains a general updating of CJI ief, I,I2!I( I\'Dier J<racfor e the Commission's rules and rrguia. InformaL!on found ln the application J)ranch Xo. J, Dip<sion of Prn.

tlons in 10 CFR Chapter I, which arc and thc latest annual reports for each fret. gcrr<r n!.

scl, forth In the license a<ncndment. applicant. Thc applicants request that Prior public notice of this amendment the application (filed July 5, 1974) as IFIL Dnr. 'I -:15!59 Flird 12-!9-77: 8.<5 arrr FEDERAL R'EGISTER, VOL 42. NO. 244 TUESDAY, DE(:ElhBER 2n, IPTT

NOTICES The Comndssion has determined that mental Impact and that pursuant to 10 not result in any slgnlQcant environ-the issuance of this amendment will not CFR 5 51.5(d) (4) an environmental im- mental Impact and that pursuant to 10 result in any sigxdQcant environmental pact statement or negative declaration CFR 5 51.5(d) (4) an environmental hn-Impact and that pursuant to 10 CFR and environmental impact appraisal pact statement or negative declaration 515(d) (4) an environmental statement, need not be prepared in connection with and environmental hnpact appraisal or negative declaration and environ- the issuance of these amendments. need not be prepared in connection with mental impact appraisal need not bo For further details with respect to this issuance of these amendments.

prepared 1n connection with hsuance of action, see (1) the application for For further detaQs with respect to this this amendment. amendments dated March 30, 1977, as action. see (1) the application for For further details with respect to this supplemented June 21, August 23, Sep- amendments dated February 23, 19V7, as action, see (1) the applications for tember 8. 14 and 24. 197V, (2) Amend- supplemented by letter dated April 25, amendment dated March 3. 19VV; June 8, ment Nos. 4V, 47 and 44 to License Nos. 1977, and (2) Amendments Nos. 29 and 197V; July 1, 197V, as supplemented; and DPR-38, DPR-47. and DPR-55. re- 26 to Licenses Nos. DPR-31 and DPR-September 16, 1977, (2) Amendment No. spectively, and (3) the Commission'8 41. All of these items are available for 39 to License No. DPR-28, and (3) the related Safety Evaluation. All of these public inspection at the Comndsslon's Commission's related Safety'valuation. 1tems are available for public Inspection Public Document Room, 1V17 H Street All of these items are available for public at the Commission's Public Document NW.. Washington, D.C. and at the En-inspection at ~e Commission's Public Room, 1717 H Street, NW., Washington, vironmental and Urban Affairs Library, Document Rooin, 1V17 H Street NW., D.C. and at the Oconee County Library, Florida International University, Miami, Washington. D.C., and at the Brooks 201 South Spring St., Walhalla. S.C. Pla. 33199. A copy of item (2) may be Memorial Library, 224 Main Street, Brat- 29691. A copy of items (2) and (3) may obtained upon request addressed to the tleboro, Vt. A copy of items (2) and (3) be obtained upon request addressed to the U.S. Nuclear Regulatory Comndssion, may be obtained upon request addressed U.S. Nuclear Regulatory Commission, Washington, D.C. 20555. Attention: Di-to the U.S. Nuclear Regulatory Commis- Washington. D.C. 20555, Attention: Di- rector, Division of Operating, Reactors.

sion, Washington, D.C. 20555. Attention: rector, Division of Operating Reactors. Dated at Bethesda, Maryland, this 7th Director, Division of Operating Reactors. Dated at Bethesda, Maryland, this 4th day of October 1977.

Dated at Bethesda, Md., this 30th day day of October 1977. Por the Nuclear Regulatory Commis-of September 1977. Por the Nuclear Regulator Commission. sion.

For the Nuclear Regulatory Commis- A. Scxrmznczz, GEoRGE LRAR, sion. Chief, Operating Reactors Chfcf, Operating Reactors MoRzoN B. FaxRzxx,z, Branch No. 1, Dfvtsfon of Branch No, 3, Division of Actfnp Chfef, Operatfnp Re- Operatfng Reactors. Operatfng Reactors.

actors Branch No. 4, Division IPXt Doc.77-30288 PXt 10-19-VV;8:46 aml of Operating Reactors. [PXt Doc.V7-30287 Plied 10-19-77;8:45 aml

[PXt Doc.77-30593 Piled 10-19-VV;8:45 aml t7590 Ol] [ 7590-01 $

Dockets Nos.60-360 and 50-961) I Docket No.60-391 I

[ 7590-01 ] GEORGIA POWER CO. ET AL IDocket Nos.60-269, 60-270 and 60-2871 FLORIDA POWER AIID UGHT CO.

DUKE POWER CO. Issuance of Amendments to Facility Issuance of Amendment to Facility Operating Ucenses Operating Ucense Issuance of Amendments to Facility The CD. Nuclear Regulatory Comnds-Operating Licenses Notice ls hereby given that the U.S.

Regulatory Commission (the sion (the Commission) has issued The U.S. Nuclear Regulatory Comnds- Nuclear Amendment No. 46 to Facility Operating sion 'the Commission) has issued Commission) has Issued Amendments 29 and 26 to Facility Operating Li- License No. DPR-57 issued to Georgia Amendment Nos. 47, 47 and 44 to Facility Nos. Nos. DPR-31 and DPR-41, respec- Power Company, Oglethrope Electric Operating License Nos. DPR-38, DPR-47 censes tively, issued to Florida Power and Light Membership Corporation, Municipal and DPR-55, respectively, Issued to Duke Company revised Environmental Electric Association of Georgia and City Power Company which revised the Tech- Technical which SpeclQcatlons for operation of of. Dalton, Georgia, which revised Tech-nical Speciflcations for operation of the the Turkey Point Nuclear Generating n1cal Speculcations for operation of the Oconee Nuclear Station, Unit Nos. 1. 2 Units Nos. 3 and 4, located in Dade Edwin L Hatch Nuclear Plant, Unit No.

and 3, located in Oconee County, South County, Florida. The amendments are 1, located in Appling County, Georgia.

Carolina. The amendments are effective effective as of the date of issuance. The amendment is effective as of 1ts date as of the date of Issuance. The amendments will revise the En- of issuance.

Those amendments revise the Techrdcal vironmental Technical SpeciQcations to The amendment consists of changes to Specifications to establish operating lim- authorize deletion of the monthly and the Technical SpeclQcations which re-its for Unit 1 cycle 4 operation and quarterly monitoring of the E-series wells vtses the range listed for the shroud tighten leakage limits through the Steam from the groundwater monitoring pro- water level indicator shown in Table Generator tubes. granls. 3.2-11.

Tho application for the hmendments The application for the amendment compiles with the standards and require- The application for the amendments ments of the Atomic Energy Act of 1954, compues with the standards and require- compiles with the standards and require-as amended (the Act) . and the Commis- ments of the Atomic Energy Act o! 1954, ments of the Atomic Energy Act of 1954, sion's rules and regulations. The Com- as amended'(the Act), and the Commis- as amended (the Act), and the Comnds-mission has made appropriate findings sion's rules and regulations. The Com- slon's rules and regulations. The Com-as required by the Act and the Commis- mission has made appropriate findings mission has made appropriate Qndings sion's rules and regulations in 10 CFR as required by the Act and the Commis- as required by the Act and the Commis-Chapter I, which are set forth in the sion's rules and regulations in 10 CFR sion's rules and regulations In 10 CFR license amendments. Prior public notice Chapter 1, which are set forth in the Chapter I, which are set forth in the II-of these amendments was not required license amendments. Prior public notice cense amendment. Prior public notice of since the amendments do not involve a of these amendments was not required this amendment was not required since slgnIQcant hazards consideration. since the amendments do not involve a the amendment does not involve a sig-The Commission has determined that significant hazards consideration. nificant hazards consideration.

the Issuance of these amendments will 'he Commission has deterndned that The Commission has determined that not result in any signQcant environ- the issuance of these amendments will the Issuance of this amendment will not EEOERAL REGISTER VOL 42, NO. 203 THURSDAY, OClOBER 20, 1977

l'

~ NOTICES 55501 REASON FOR CLOSHFGr The ProPossls be- 555-01 $ Co on's rules and regulations. The ing reviewed Includo Informntlon of s pro- Comm ion has made,appropriate find-prletnry or confident!sf nnture, including ADVISORY COUNCIL; TASK GROUP NO. 2 ings as required by thc Act and the tcchnlcnl informstlon; finsncisl dsts, such Meeting Commission's rules and regulations in ss salaries; snd pcrsonsl lnformstlon con- 10 CFR Chapter I, which are sct forth cerning lndlvldusis sssocistcd with the pro- In accordance with the Federal Ad- in thc license amendments. Prior pub-parsls. These mntters are within exemptions visory Comnrlttee Act, Pub. L.92-463, lic notice of these amendments was not (4) snd (6) of 5 U.S.C. 652b(c), Government the National Science Foundation an- required since the amendments do not ln the Sunshlno Act. nounces the following meeting: involve a significant hazards considera-AUTHORITY TO CLOSE hfEETINO: This NhhfE! Task Group No, 2 of the NSP Ad- tion.

dctcrmlnstlon wns rnndo by the Committee visory Council. The Commission has determined that hfsnsgcment omcer pursunnt to provisions of Section 10(d) of Pub. L.92-403. Tha Com- PLACE: Boom 421, Nstlonnl Science Foun- the Issuance of these amendments will mittee hfsnngcment omcer wss delegated dstlon, 1800 Q Street NW., Washington, D.C. not result ln any s)gnlficant environmen-the suthorlty to rnnke such dctermlnstions 20550. tal impact and that pursuant to 10 CFR by the Acting Director, NSP, on February 18, DATE: November 2, 1077. 51.5(d) (4) an environmental 'mpact 1917.

TIhlE: 9 s.m.

statement or negative declaration and M. REBECCA WINKLER, environmental impact appraisal need Actirrg Commftfce TYPE OP MEEI'ING: Open, not be prcparcd in connection with issu-frfanagerrrcnt Ogiccr. CONTACT PERSON: ance of these amendments.

I FR Doc.77-30183 Filed 10-14-77;8:45 nm I For further details with respect to hln. hfsrgsrot L Wlndus, Executive Secre- this action, see (1) the app)lcailon for tary, NSP Advisory Conrrcli, Nstlonsl Sci- amendments dated September 21, 1977.

onco Foundstlon, Room 518, Washington,

[ 7555-01 ] D.C. 20550; telephono 202-032-4384. as supplemented by letter dated Septem- .

SUBCOMMITTEE ON DEVELOPMENTAL PURPOSE OF TASK GROUP: The purposa ber 29, 19VV, (2) Amendments Nos. 28 BIOLOGY OF THE ADVISORY COMMIT- of tho Task Group, composed of members of and 25 to Licenses Nos. DPR-31 and TEE FOR PHYSIOLOGY, CEI.LULAR AND tho NSP Advisory Council, is to provide the DPR-41, and (3) the Commission's re-MOLECULAR BIOLOGY full Council with s mechanism to consldor lated Safety Evaluation. All of these numerous issues of intcrcst to the Council items are available for public inspection Meeting that have bccn nsslgncd by the Nntionsl at thc Commission's Public Document In accordance with the Federal Ad- Science Foundation. Boom, 1717 H Strcct NW., Washington, visory Committee Act, Pub. L.92-463 SUhthfARY hfINUTESr htsy ba obtained from D.C. and at thc Environmental and as amended, the National Science Foun- the Committee hfnnngcment Coordlnstlon Urban AIIai'rs Lib'rary, Florida Interna-dation announces the following meeting: Staff, Dlvlslon of Porsonnol snd Mnnsgcment, tional University, Miami, Florida 33199.

NAhiE: Subcommittee on Devclopmentnl Boom 248, Nstionnl Scisnce Poundstlon, Acopy of items (2) and (3) maybe ob-Biology of tho Advisory Committee for Physi- Washington, D.C. 20550.

tained upon request addressed to the U.S.

ology, Collnlnr nnd Molecnlsr Biology. AGENDA: To Identify snd rovlow thc wnys Nuclear Regulatory Commission, Wash-non-scientists now pnrtlclpsic in tho for- ington, D.C. 20555, Attention: Director.

DATE AND TIhlE: November 3, 4, snd 5, mntlon of iho nstlon's science policy, the Division of Operating Reactors.

1977-9 s.m. Io 5 p.m. each dsy. for involving tho pub<<

PLACE: Room 321, Nntlonnl Science Foun- present.nrrnngements Dated at Bethesda, Md., this 4th day dstlon, 1800 O Street NIV. Wnshington, D.C. llc ln the developmont of Foundntion poli- ,

of October 1977.

20550.

~

cies, nnd suggest possible new nppronchcs or Improvements in NSP prnctfccs. For the Nuclear Regulatory Commis-TYPE OF hlEETINO: Closed. sion.

Dated: October 10. 1977.

~s CONTACT PERSON: GEORcE LEAR>

M, REBECCA WIHKLER, Cfrfef, Operating Itcactors Dr. hfsry E. Clutter, Program Director for Acffrrg Comrnfttec Deveiopmcntnl Biology, Boom 326, Nntlonsl Branch No. 3, DIvision of Op-Foundntion, Wsshlngton, D.C. Managcmcrrt 0ffl cer. eratfrrg Reactors.

, Science 20550; telephone 202-632-4314. IPR Doc.77-30186 FIled 10 14-77;8:46 sml I FR Doc.77-29940 Piled 10-14-77;8:45 sm I PURPOSE OF SUBCOhfhfITTEE: To provide sdvico snd rccommendstions concerning [ 7590-01 ]

support for resesrch hr dnvelopmcntnl biology. NUCLEAR REGULATORY

[ 7590-01 ]

J ILlcenso No. SNM-1265l AGENDA.'To review snd evnluntc rcscsrch COMMISSlON proposals as part of the sclcctfon process GENERAL ELECTRIC MORRIS OPERATION, I Dockot Nos.60-250 snd 50-251) for swsrds. Request for Order To Stay Shipment of REASON FOR CLOSING: The proposals be-FLORIDA POWER AND LIGHT CO." Spent Fuel ing reviewed Includo informstlon of n propri- issuance of Amendments to Facility f Notice ls hereby given that by petition etary or confidcntlsl nsture, hrcluding tech>> Operating! Jcenses dated September 16, 1977, the State of nlcsl Informntlon; nnsnclnl dntn, such ns salaries; nnd pcrsonsl lnformstlon concern- The U.S. Nuclear Regulatory Com- Illinois requested that shipments of ing Indlvldunls sssocisted with tim proposals. mission (the Commission) has issued spent fuel to the General Electric Com-Theso mstters sro within exemptions (4) nnd Amendments Nos. 28 and 25 to Facility pany, Morris, Illinois, be stopped and (6) of 5 U.S.C. 552b(c), Government In the Operating Licenses Nos. DPR-31 and that the Commission begin preparation

~

sunshnm Act.. DPR-41, rcspectlvely, issued to Florida of an environmental impact statement AUTHORITY TO CLOSE hlEETING: This Power and Light Company which re- on the conversion of tho General Elec-deicrmlnstlon wns mnde by tho Committee vised Technical Specifications for op- tric Midwest Fuel Recovery Plant at hfsnngcment Omcer pursunnt to provisions eration of the Turkey Point Nuclear Gen- Morris into a long-term storage facility of Section 10(d) of Pub. I.92-463. TIro Com- erating Units Nos. 3 and 4, located in for spent fuel. In. accordance with the mittee hfnnngcment Oillccr wss dclegntcd the Dade County, Florida. The amendmcnts procedures specified ln 10 CFR 2.200 ap-snthorny to msko such dctcrmlnstlons by are effective as of the date of issuance. propriate action will be taken on this tho Acting Dlrccior, NSF, on Februsry 18, The amendmcnt consists of changes rcqucst within'a reasonable time.

19'17.

to Tcchnical Speclflcatlon 4.4.6 cover- A copy of the I~quest Is aVallable for Dated: October 12, 1977. ing Tendon Surveillance for Turkey Inspection and copying in the Commis-Point Units Nos. 3 and 4. sion's Public Document Room, 1'll'I H M. REBECCA WINKLER> The application for the amendments Street, NW., Washington, D.C. 20555, Acffng Cornmfttcc compiles with the standards and re- and at the local Public Document Boom hfanagcmcnt Oi)leer. quirements of the Atomic Energy Act of at the Morris Public I,lbrary, 604 Liberty IPR Doc.77-30184 Filed 10-14-V7;8:45 sm J 1954, as amended (the Act), and tho St., Morris, III. 60451.

FEDERAl REGISTER, VOL. 42, NO. 20~ONDAY, OCTOBER 17, 1977

N 4

21670=; NOTICES.

~ ~

  • of information contained fn the Centr ' SOUTHERN NINTH CIRCUIT OF UNITED mental impact statement or- negative Records." System. These dupHcatfve STATES CIRCUIT JUDGE NOMINATING declaration and environmental fmpact.

'COMMISSION -

records fall into the following categories: =

appraisal need not be. prepared fn con-(1) L1stlngs of fndlvfduals used to as- Schedule of MeeHngs . nectfon. with issuance of these-amend-sist in the locatfon and apprehension of ments.

fndfvfduah for whom legal process 1s The scheduleof meetin8s of the noml- For further detaHswithrespect to this outstanding (fugitfves); nating panel for the Southern Ninth Cfr-'ction, seel (1) The appHcatfon'oz" .

(2) Listings of individuals used fn the.'- cuit of the United States Circuit Judge amendments dated May 21 1976 (2) identtflcation of particular offenders in Nomfimt Ut Com"Hssfon fs as foHows: 'mendments No. 24 and 23 to Lfcenses .

casea where the FBI has jurisdiction. 1. The nrst meeting wiu bo heid on May 9; Nos. DPR-31 and DpR-41, and (3) the.

Theae liSttngS inClude VariOuS PhOtO- 1977 at 9:3O a~. In the court room cf tho Commfssfon's related Safety Evaluation.

U~. Court of Appeals cn the 16th Iiocr of the of these items are avaHable for pub-

"'ll graph albumS and backgreund data COn- UJS cerning persons who have been formerly c har g ed w1th apa rtic ularcrimeandwho may be, suspect h sb Har cri inal ac- for Co urthouse, 312 North Spring Street, Hc inspection at the Commission's'PubHc 8 '

nocti c lifcrnfa'Tho ~p<<o g candidates and to dl ~

fs meeting is to discuss procedures and criteria Document Room, 1717 Washington. D.C., a d at the E viron-I Street NW.,

tivities; and photographs of individuals prcsp<<tive csndids<<s; " mental + Urban Affairs Library. Plorida who- are unknown but suspected of ln- ~2. Tho second meeting wlil be held in the Internatfonal University. Mami, Plorfda volvement fn a particular criminal ac- court room of tho UA. courthouse in Las 33199. A copy of items (2) and (3) may ttvttys fOr. eXamPle, 'bank- SurVeHlanCe Vegae, NeVada. May 27, 1977 at 10 a.m. The be Obtained uPOn requeSt addressed tO ~.

puzpceo of tha meeting'will bo-to Interview the U.S. Nuclear Regulatory Commis-

"(3).~t gs"of RdivfduM as pa*o 3 sion, Washington, D.C. 20555, Attention:

Division ot'Operating Reactors.

an'overaH criminal fnteHfgence effort by IO29 of the Iya. Fedeml Court Building h Director, Dated at Bethesda; Maryland, tMS the FBL Tilts WOUld inclUde photograph phcenhr. Arizona, on Msy 29, 1977 st 9:30 am.

albums lists of individuals known to be. Tho puzpcs<<f t'ho m<<ting wlu be to in<<, 20th day of APZH 1 977.

involved in cz'inlfnal actfvftyi including',view candidates... - ' -

  • Por the NucIear. Regulatory Commtsr -"

theft from &%mt e shfPmm~ ~ter - These meetings wHI not be open to the sion.

state. transportation of stolen proper y, '-PubHO to Pub Q 92~63 GEoRCE LEARN and individuals fn the uppex echelon of (D) aspursuant CMefOperattnp - Reactors organized crhne; (4) Listings of indivfdUals in connec-,

tton'with.the FBI's mandate to carry o

'... amend&.

(Cf; 5 Ucf.C, 552b(c)

Branch No 3, DivfsfoIL of Operattnp Reactors.

Presidential directives on'anuary anapenien cer.

1943,.JuLy'-24, 1950, December 15, 1953. =

'and February 18, 1976, WhICh deSignated Pzt Dcc.VV-IRISS riled 4-27-77;Sidd aml PIN QM84I I Doc)ret No.

~

. the FBI to carry out investigative work NORTHERN STATES POWER CO." OF MIN-t@R, and foreig countertnteHfgence., ..' NUCLEAR REGULATORY NESOTA AND NORTHERN STATES COMMISSION These Hstings may include photograph'.',~ POWER COMPANY OF WISCONSIN, albumS and Other HstfngS. COntafnfng. + IDcckets Ncs.de-2SO and SO-2SII FLORIDA POWER AND LIGHT'CO.

ET Af Availabilityof Final This would include lists of fdefltffled andi for Tyrone Energy Park Environmental'tatement suspected foreign fnteHfgence agents and - Issuanco of Amendments to Facility Operating Licenses. Pursuant to the National Environ-

". (5) SPecial Indices dupHcatlve of the mental PoHcy Act of 1969 and the United The U.S. Nuclear Regulatory Commts- States Nuclear Regulatory Commission's:

central indices used to access the Central sion (the, Commission) has t ued regulations in 10 CPR Part 51, notice fs-Records System have been created from Amendments Nos 24 and 23 to PacHfty hereby. given that the Final Environ--

eto time in conjunction with the Operating LfcenMS* No. DP~I and mental Statement prepared by the Com~

admfntstratfon and fnvestf8atlon of ma- DRP~I, respectively, issued to Florida= mission's Office of Nuclear Reactor Reg-jor,~m. Thf duPHcatfon and seg~- powerandLfghtcom'p~whfd,revt d ulation related to the proposed Tyrone" gatton,. f~fHt t ~~ to. document prepared tn connection wN1 major cases-Technical Specfft,atfons for 0~ration of ~ergy Park to be constructed by the cq the Turkey pofnt Nuclear Generating appHcants Northern States Power Com-

~some of the information contained tn Units Nos.3 and 4, located in Dade Coun- pany of Mnesota, Northern States Power the 'main flles has also been extracted ty, Florida. The-amendments are effec- Company of Wisconsin, Cooperative- ~

and.placed on computer to enable vari- tive as of the date of issuance Power Association, Dafryland Power CO-ouszdfvfsfons to retrieve information These amendments consfstof changes operative. and the Lake Superior District more;rapidly by avoiding the need <<r 'to the Technical Speclflcatlons which Power Company, fn Dunn County, Wis-a manual search for information main- mill change the reactor coolant pressure- consin, ts avaHable for inspection by the.

tafned;fil the main fHes. For examPle temperature Hmfts to account for neu- pubHc fn the Commission's PubHc Docu-sfnce,.fnvestfgatfon of major frauds re- tron irradiation induced increases in re- ment Room at 1717 H Street NW.. Wash-quires the Agent to coHect and organize actor vessel metal nH ductHity tempera-: ington. D.C., and fn the Stout Library,

~ massfve volumes of evidence and other University of Wisconsin, Menonomfe, investigative information, the PB1 fs us- The appHcatfon for the amendments Wisconsin. The Final 'nvironmental fng computers to do this ln a more ac- compHes with the standards and require-- Statement fs also being made avaflable curate, and expedltlous manner. Addi ments of the Atomic Energy Act of 1954, at the State Clearinghouse, Bureau of tionaHy,".Agents occasfonaHy seize evt= as amended (the Act), and the Plannfng and Budget, Department of computerized form and PB< ~ sion's rules and regulatfons. The Com- Admfnfstratfon, State Oflfce Building, 1 Commls-'ence'fn computers are used to organize and sort mission has made appropriate flndfngs- West WHson Street, Madison, Wfsconsfn.

'the informatfon in preparation for deal- trfaL as required by the Act and the Commls- and. the %'est Central Wfsconsfn- Re-Also, personnel type information sion's rules and regulations in 10 CFR gional Planning Commission, 'l31 Oxford tng with such matters as attendance and production and accuracy requirements fs maintained by some divisions.. - '

AprH 16 1977

'f

'ince Chapter L which are set forth in the li= Avenue, Eau Clafre, Wisconsin.

cense amendments. Prior pubHc notice. The Notice'of AvaHabHlty of the Draft these amendments was not required Environmental Statement for the Tyrone the amendments do not involve a Energy Part and requests for comments signtflcant hazards consideration. from fnterested persons was pubHshed fn

" The Commtssfon has determh'ed that, the FESEEsz. RzczsTEE on July 6, 1976

.Xcttnpatto" pa ." the issuance of these amend ents wH1 (41 PR 27'l89). 'Ilie comments received Id',Dcc.77-12097 Piled 4-27-77;3143 sml nOt reSult in any, SigniflCant enVtrOn-: from Federal, State, and local agencies

'"w -:

1 1

P PEDERAL REGIsTER,, voL. 42No. 32 IHURsOAY,.APRIL 23, 19yy.,

C,+

~ I h

I lt l

cense ee anagement ranch t.NLLVDUM.

w Office of'dmini ation

'ACILITY ANENOI'IENT CLASSIFICATION s

Applicant: 3 Z'~)

License No.(s} 9P trail Control No:

(pea:n fa gyro/> p gad Application Dated: Fee Remitted yes.

Applicant's Fee Classification: Class . I, II, III, IY, Y, YI,~(lone No:

' ' Date of

/'mendment Issuance This application h been reviewed. by DOR/DP!1 in accordance with Section

~ ~ ~ ~

1.~

170.22 of Part 170 and is properly categorized.

~

~

2. This application is incorrectly classified 'nd should be properly categorized as Class . Justification for reclassification:
3. Additional information is requ",r d to properly categorize the license mmmm Jm ~ 4 ~

Will I I'IIIII 'I t

~ s ~

~

I The application was filed (a) by a nonprofit. educational institution, (b) by a Government agency,~c)pursuant to written I'lRC reco."..".. nda-tions and the amendment will be issued for the convenience of the Commission, and (d)@Other (state reason thereforj:

z, zo4- g D

'tra r vision of pefat>

'c2aer '-/2 ng yd Reactors/Project,,~nage.-.eni

5. This application has been reviewed and is exempt from fees.

. ) C,iq,iI';;~ ('l.-(I L.

William 0. Hiller, Chief RECEIVED BY LFMB mate..<. ~J)~...;......

Timo. 'J,.i.t ~;,............

O<'.To'. p,.

c,, 'o-95'as' License Fee Hanagement Branch

~h~~en e- co<<- I Qeclc; c 'F'k.

gizc i7S' Q ~g+~QVLOP, Pt ~~

Io'P~

1 I

~R RECT

+4 ~o n STR ON C

UNITED STATES ockets 0 NUCLEAR REGULATORY COMMISSION 0 ding

+n ~O WASHINGTON, D.C. 20555 CParrish

++*++ June 8. 1978 Docket N . 50-26O/ 51 Docketing and Service Section Office of the Secretary of the Commission sUBJEGT: FLORIDA POWER 8I LIGHT CO%PAN (Turkey Point 3 It 4)

Two signed originals of the Federal Register Notice identified below are enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies (12 ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availability of Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice

. of Opportunity for Hearing.

0 Notice of Availability of NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availability of Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

0 Notice of Issuance of Facility Operating License(s) or Amendment(s).

0 Other: Order for Modification of License Office of Nuclear Reactor Regulation

Enclosure:

As Stated OFFICE~ ....pI) R.;.988ie!.l.

SURNAME~ Parrish:lb DATE~ 6/8/78 NRC FORM 102 II.76)

I I

'I t: L J

b

c"4'ERO 7590-01 0

Cy O

UNITED STATES DI STRI 8 UTI ON NUCLEAR REGULATORY COMMISSION Dockets(2)

WASHINGTON, D.C. 20555 ORB¹1 Reading

+n

'Parrish

~

~O

+W*k+

Docket No. 0-250 5 50-25] fhy 26, 1978

. Docketing and Service Section Office of the Secretary of the Commission

SUBJECT:

FLORIDA PIJER 5, LIGHT COMPANY (Tur key Point 3 5 4)

Two signed originals of the Federal Register Notice identified below are enclosed, for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( 12) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availability of Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to.Facility Operating License.

0 Notice of Receipt of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availability of NRC Draft/Final Envirorimental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availability of Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

l9Notice of Issuance of Facility Operating License(s) or Amendment(s).

QOth<<. Referenced document has been sent to PDR.

Office of Nuclear Reactor Regulation

Enclosure:

As Stated ORB¹1 x27433 PRE CParrish 5/26/7P DATE~

1 5/gQ/78 NRO FORM 102 (1.76)

I I F t', if/ F t

~

~

~F,R RE'q1 C ~e Cy 0

0 O

~ '

UNITED STATES DISTRIBUTION bRBl Rdg

-2 251 NUCLEAR REGULATORY COMMISSION CSParrish 4~ ~O WASHINGTON,-D.C. 20555

++*++

Nay 15, 1979 Docket No. 5O-25O 50-25)

Docketing and Service Section Office of the Secretary of the Commission

SUBJECT:

FLORIDA POINTER AND LIGHT COtPANY (TURKEY POENT 3 8I 4)

Amendment Hos. 48 and 40 Two signed originals of the Federal Register Notice identified below are enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies (12 ) of the Notice are enclosed for your use, 0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availability of Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availability of NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availability of Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

+Notice of Issuance of Facility.Operating Licensegggggmendment(s).

0 Other:

Office of Nuclear Reactor Regulation

Enclosure:

As Stated OFFICE~ DOR: ORB1 SURNAME~ CSParrish:j DATE~ Q.5/.1.5/,79....,......,..

NRO FORM 102 (I 76)

0: . ~

'J I

e I

S 4 y ll

I-

<~p',R RECy~

cket No . 50-250 NUGLEAR REGULATQRY coMMlssloNCSParri sh WASHINGTON, D.C. 20555

'F+*++ 0Rg]

April 25, 3979 Docket No. 50-250 50-251 Docketing and Service Section Office of the Secretary of the Commission

SUBJECT:

FLORIDA POHER AND LIGHT COIIIPANY - TURKEY POINT 3 8I 4 Amendments 46 and 39 Two signed originals of the Federal Register Notice identified below are enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s),

0 Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.'

Notice of Availability of Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availability of NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization 0 Notice of Availability of Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

g Notice of Issuance of Facility Operating License@)g Amendment(s).

g3 Other:

Office of Nuclear Reactor Regulation

Enclosure:

As Stated OFFICE~ DOR:ORB1 g

'CSP'a'ri'i'sh':

jb SURNAME~ 04/g7/79 DATE~

NRC FORM 102 {1.76)

1 1

J tl f

~y Ii I

p I I ca i e 50-250 NUCLEAR REGUiATCRT coMMleetoN ORB81 Reading WASHINGTON, D.C. 20555

++*++

Apr$ 1 3, 1979 Docket No.50 250 Docketing and Service Section Office of the Secretary of the Commission

SUBJECT:

FLORIDA P01$ ER AND LIGHT COMPANY (TURKEY POINT 3 5 4)

Two signed originals of the Federal Register Notice identified below are enclosed foryour transmittal to the Office of the Federal Register for publication. Additional conformed copies ( 1Z ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availability of Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice

~ of Opportunity for Hearing.

0 Notice of Availability of NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availability of Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

)D Notice of Issuance of Facility Operating License@)$ Amendment@

0 Other:

Office of Nuclear Reactor Regulation

Enclosure:

As Stated OI-FICE~ 8HDO : Bl SURNAME~ CgP DATE~ 04/P' NRC FORM 102 (1.76)

li P f 7~69Pi) g,, '..::- ~.

'TATBQ~

' .~+.,

1 F 1

V h

4

.'T~ 18

~~: ~~ >-. "'

o~ P . -

'.NUCLEAR"REGULATORY BPMMIRI WASHINGTON, D.C. 20555 CSParrish March 23, 1979 Docket No 50 250/251 Docketing and Service Section Office of the Secretary of the Commission SUBJECT FLORIDA POWER AND LIGHT COI'1PANY (TURKEY, POINT 3 8I 4)

I Two signed originals of the Federal Register Notice identified below are enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( 12 ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s),and Operating License(s).

0 Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.'

Notice of Availability of Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s}; Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity, for Hearing.

0 Notice of Availability of NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

'i 0 Notice of Availability of Safety Evaluation Report.

Q Notice of Issuance of Facility Operating License(NIXr Amendment(s).

A'l1 referenced documents have been rovided to the PDRs.

Office of Nuclear Reactor Regulation

Enclosure:

As Stated DOR:ORB OFFICE~

SURNAME~ CS Parrish:j DATE~ 03/23/79 IIRC FOAM 102 (1 76)

. Q!~

" 'l 4

~w w ~-

f&T,I(4~'2:,

0"

~ ., - >>, ...p.

phd bQ f'~ A" b

/ > ~

m H

4 1

E f'

l I' II I

p j

"*<IA 4I g 1 S

gF.R RE'CU~"'O' I STRI'BUTION

)ocket Fs s 50-250 UNITED STATES an NUCLEAR REGULATORY COMMISSION CSParrish WASHINGTON, D.C. 20555 ORBl Rdg W~*y+

March 5, 1979 Docket No.

50-250 50-251 Docketing and Service Section Office of the Secretary of the Commission SUBJFCT FLORIDA POIJER AND LIGHT COMPANY (TURKEY POINT 3 5 4)

Two signed originals of the Federal Register Notice identified below are enclosed for your transmittal "to the Office of the Federal Register for publication. Additional conformed copies ( 1Z ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availability of Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to'Facility Operating License.

0 Notice of Receipt of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availability of NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availability of Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

XZ, Notice of Issuance of Facility Operating LIcense(sgim(Amendment(s).

All referenced documents have been provided to the PDRs.

Office of Nuclear Reactor Regulation

Enclosure:

As Stated OFFICE~ DOR'ORB1 SURNAME~ CSParrish: jb, DATE~ 03/05/79 NRC FORM 102 II-76)

4 4

P

0 P

I ~

AJ W

I II '

WR R6<O

~o Cy 0 DISTRIBUTION I

O UNITED STATES Docket File 50-250 NUCLEAR REGULATORY COMMISSION and - 1 WASHINGTON, D.C. 20555 ORB1 Rdg

++*++ CSParrish Docket No. Vm / /9'7$

50-251 and Service Section'ffice

'ocketing of the Secretary of the Commission

SUBJECT:

FLORIDA POWER AND LIGHT COMPANY (Turkey Polnt 3 8 4)

Two signed originals of the Federal Register Notice identified below are enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s) 0 Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availability of Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt'of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availability of NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availability of Safety Evaluation Report.

0 Notice of Issuance of 'Construction Permit(s).

0 Notice of Issuance of Facility Operating License(s) or Amendment(s).

IXI Other: A11 'refe enced d Office of Nuclear Reactor Regulation

Enclosure:

, As Stated OFF CE~ ..QQR;..0861,.......

CSParrish:j SURNAME~ -'-1'1'/--'"'j-78" DATE~

NRC FORM 102 0 76)

0 1'll 4 N

P P ' ltl

DI STRI BUT IO ocket F es 502-50 UNITED STATES CSParrish NUCLEAR REGULATORY COMMISSION

+~ WASHINGTON, D,C. 20555

+>>*++ November 2, 1978 Docket No. 50-250 Docketing and Service Section Office of the Secretary of the Commission

SUBJECT:

'LORIDA P01<ER AND LIGHT COMPANY (TURKEY POINT, UNIT NO. 5)

Two signed originals of the Federal Register Notice identified below are enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availability of Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License 0 Notice of Receipt of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availability of NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availability of Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

0 Notice of issuance of Facility Operating License(s) or Amendment(s).

5] Other: Referenced d Office of Nuclear Reactor Regulation

Enclosure:

As Stated OFFCE~ DOR:ORB1 CSP'arr'is)i: jb SURNAME~

'IQ'+78' DATE~

NRO FORM 102 0 76)

r t

E 3

d g II g ~ l ll

gp,R REOOg

~o TION Cy 0

O Doc I UNITED STATES ORBgl Reading NUCLEAR REGULATORY COMMISSION CParrish

~O WASHINGTON, D.C. 20555

+)t *+ +

August 7, 1978 Docket N 60 250/ 51 Docketing and Service Section Office of the Secretary of the Commission SLIfgEc7 FLORIDA POlfER 81 LIGHT COMPANY (Turkey Point Units 3 5 4)

Two signed originals of the Federal Register Notice identified below are enclosed for~our transmittal to the Office of the Federal Register for publication. Additional conformed copies (1< ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availability of Applicant's Environmental Report.

ixl Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availability of NRC Draft/Final Environmental Statement.

'J 0 Notice of Limited Work Authorization.

0 Notice of Availability of Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

0 Notice of Issuance of Facility Operating License(s) or Amendment(s).

0 other. P1ease insert date for 30-day intervention period and inforilt ee erry o e a e nse e . a e o e nser e C.NR~W Required pub1ishing date Mednesday August 9,XN 'l978.

W)~E Office'of Nuclear Reactor Regulation

Enclosure:

As Stated DOR:OR881 DFFFOE~

SURNAME~ ..CP..ar,.r..i.sh,:.1,h...,.

DATE~ ....8/7/,78..

NRC FOAM 102 (1.76)

\

il

'L 1 t 4

~ ~, I"

\

~ ~

'b w c

L

~P.R RECU DISTRIBUTION

~o , DOCKET F 50-250 Cy 0 AND O

I UNITED STATES ORB1 Rdg O Cy NUCLEAR REGULATORY COMMISSION CSParrfsh

+~ gO WASHINGTON, D.C. 20555

+>>*<<+

Docket No. 5O<<25O~ November 6, 1978 and 50-251M Docketing and Service Section Office of the Secretary of the Commission

SUBJECT:

FLORIDA PONER AND LIGHT COMPANY (Turkey Point, Units 3 and 4)

Two signed originals of the Federal Register Notice identified below are enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s); Time for Submission of Views on Antitrust Matters.

0 Notice of Availability of Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availability of NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availability of Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

0 Notice of Issuance of Facility Operating License(s) or Amendment(s).

9 Other:

Office of Nuclear Reactor Regulation

Enclosure:

As Stated DOR:ORB1 OFF CE~, i'sFi

'-CSPar"r" SURNAME~, '..1.1./,6/.7.8.....,.....

OATE~ .

NRO FORM 102 (1 76)

P 4

r 1

'r

GPR REQII P

~4 0 co

/

tg STATES NUCLEAR REGULATORY COMMISSION I D STR I BUT ION

@-mfa'NITED WASHINGTON, D.C. 20555 November 20, 1978 Dockets 50-250/251 ORBIIIl RF Docket Ng. CSParrish Docketing and Service Section Office of the Secretary of the Commission r GtffkfEDT; PI+III PI tNO I

IGNI Ilfpftffy (TURKEY POINT NUCLEAR Two signed originals of the Federal Register Notice identified below are enclosed for your transmittal to the Office of the Federal Register for publication. Addiiional conformed copies ( of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availability of Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

s 0 Notice of Receipt of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availability of NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availability of Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

0 Notice of Issuance of Facility Operating License(s) or Amendment(s).

Dt Other: Referenced. documents have been ro ided to the P Rs.

Office of Nuclear Reactor Regulation

Enclosure:

As Stated OFFICE~ OR:ORB81/LA CSParrish:pa SURNAME~

DATE~ 11/A/78 NRC FORM 102 I1.7BI

f h

I ~

f

)

1' U

V D U

gP,R REGIj

~o Cy

( 0

'g UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON( D.C. 20555 5IL25~0. November 7, 1978 0((eke( 0.

and GO-251 Docketing and Service Section Office of the Secretary of the Commission SUBJECT FLORIDA POWER AND LIGHT COMPANY (TURKEY POINT 3 5, 4)

Two signed originals of the Federal Register Notice identifiedbelow are enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availability of Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of IssUance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availability of NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availability of Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

0 Notice of issuance of Facility Operating License(s) or Amendment(s).

Ql Other;

///I (."!Z.

Office of Nuclear Reactor Regulation

Enclosure:

As Stated OFFICE~ DOR:ORB1 SURNAME~ CSParrish:g DATE~ 11/07/78 NRC FORM 102 0 76)

~ . ~ '

w I

6F,R RECU 0

t co oO =r ib ion t

ttt UNITED STATES ckets NUCLEAR REGULATORY COMMISSION OR eading

~O WASHINGTON, D.C. 20555 CParrish

+**+4 flarch 24, 1978 Docket No. 6 ~26 Docketing and Service Section Office of the Secretary of the Commission

SUBJECT:

FLORIDA POllER 8 LIGHT COflPANY (Tnnkey Point Units 1 and 2)

Amendments 34 and 28 Two signed originals of the Federal Register Notice identified below are enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( "< ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s) 0 Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availability of Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availability of NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availability of Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

gl Notice of Issuance of Facility Operating License(s) or Amendment(s).

g Other. Referenced documents have been provided PGRs.

Office of Nuclear Reactor Regulation

Enclosure:

As Stated OFF LE~ DOR: ORB Ill SURNAME~ CP.a.r..r..i.sh.:-1 DATE~ 3/24/78 NRC FORM 102 I1.76)

\

N 4

l J-I fF

~ 'E V = ~

1

't 4

JUL' 8 197&

NENORANDUII FOR: A1 Schwencer, Chief, ORB B FROHh, Paul S. Check, Chief', Reactor Safety Branch, DOR

SUBJECT:

SINGLE FAILURE ON TURKEY POINT, UNHS 3 AND 4 In our review of the inservice testing program of valves for Turkey Point 4, we have identified a single failure in Turkey Point, Units 3 and 4, that could prevent the required ECCS flm from entering the vessel.

As shown in Drawing FPSL No. E-503185-7, Rev. 6, and RSAR Figure 6.2-1, Rev. 33, the tin Residual Heat Removal pumps normally inject ECCS flow into the three cold legs through valves 3-744A and 3-744B (for Untt 4, 4-744A and 4-7448). If there is a passive failure which prevents injection through this normal pathe then normally closed valves 3-863A, 3-863B and 3-872 can be opeaed to allow flow to one of the cold legs. Furhhermore, in the hot leg recirculation mage, which is achieved about 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after the LOCA, valves 3-863A and 3-863B must be opened.

The single failure that we have identified is the spurious opening of 45Ãhr valve 3-863A or 3-8638 during the injection mode. This could divert fIow,.

through these valves to either the Refueling Water Storage Tank ot /he due/ion og /he RHR pumps. In either event. it is nest Hear that suC'ficient water is entering the vessel. A possible way of correcting this apparent problem is by looking out power to valves 3-863A and 3-863B (For Unit 4, 4-863A and 4-863B). We We have brought this situation to the licensee,'s attention and he ageees that we have a valid concern. bX OFiginal SiiPCIi FOES 0W Paul S.;Check, Chief Reactor Safety Branch, D Division of Operating Reactors cc: V. Stello F. Coffman

8. Weiss 772870357 C. Berlinger H. Grotenhuis C. Cheng Distribution:

V. Nerses Central File L. Olsban RS Reading PCheck OPPICd~ RS/DOR RS/DOR- RS han: pmj FCoffma PCheck OURNAMd~

DATd~ 6g8/7S 6JM7S eX>>s NRC FGRM 318 (9-76) NRCM 0240 k V, 5, OOVRRNMRNT PRINTINO OPPICd> IOTO 42lM24

j a

~

1 I

~ ~

~ ~ . 1 II g a

lttp ' 'a Ja Lh a I'8 a P

I ~,

Ja

'H it 1 I I <7 ' ff I

P<

7 I

paa F' II I g f QI f, ~ -1 e a

~ a It a

~,, I I'

~ I j P It a

JI a

cap p I'a t P e

I J

Q<<40,'r S0- R->0 D R I BUT ION:

ocket Files (2) gAB Projects JUM. l N78 gAB Chron.

DJSkovholt, File DPh1 RCDeYoung, DPI FLiederbach, gAB Docket Hos -'-25 AGarland, gAB

&~50- 51 fiiBIORAHDUH FOR: Malter R. Butler, Plant Systems Branch, Division of Operating Reactors FROhji Walter P. Haass, Chief, guality Assurance Branch, Division of Project htanagement SUBJECT FPL STEAN GENERATOR REPLACEMENT FOR TURKEY POINT UNITS 3 8I 4. EYALUATION OF FLORIDA POWER 5 LIGHT COMPANY (FPL) RESPONSE TO REQUEST FOR ADDITIONAL INFORL@TIOH ON (EQUALITY ASSURANCE

REFERENCE:

Memorandum - C. J. Heltemes, Jr. to Walter R. Butler, Dec. 27, 1977. "FPL Steam Generator Replacement-Request for Additional Information, guality Assurance The gull,sty Assurance Branch (gAB) has evaluated the response to our question 42'l.l of the referenced memo contained in Section 2.1.4 of Revision 3 of the Steam Generator Repair Report,. dated April 1978.

Me have limited our review to~ the responses to Regulatory Guides 1.28, 1.37, 1.38, 1.58, 1.64, 1.88, and 1.123. lie find the responses and commitments relative to these guides to be acceptable.

The response to our guestion 421 .2 is acceptable in that FPL has committed that the FPL gA program, applicable to field operations affected by the replacement of the steam generators, will be that described in FPL's gA Topical Report, FPLTgAR 1-76A. Rev. 2 except as amplified in Section 3.6.1 of Rev. 3 of the Steam Generator Repair Report. He find these amplif'ications acceptable.

The response to our guestion 421.3 is acceptable except that the response on page A-13-1 of Rev. 3, dated April 1978, should be modified as follows:

The statement "FPL and Bechtel comply with the intent of Regulatory Guide 1.38...." should be changed to read: "FPL and Bechtel comply with the regulatory position of Regulatory Guide 1.38...."

Original.signed b~

A,M Garland 77ZSTOSSS t

y+

Malter P. Haass, Chief ality Assur e Branch OenCE~ ... l3PH:.g ...DPM.:.g ..DP..M:. A 0VRNANE~

4 OATE9 0/ L i.72...*

FLi.e.derha h.:.g NRC FORM 518 (9-76) NRCM 0240

...AG r..l.a.

6/- -./.?8 d

P8aas.s- ---".

6/ -/78----

I 0 OOVERNNENT PRINTINO OFCICEs l070 020 024

s' r>h g)

Ji 'j' g>>.h Il I r

  • 0 l

r I I

I' I

h ll I

h ll rt I

I r ItH I

II tl I th ji Jt

  • I J i

I JI I

, I ll

~ . hl I

t, I I

I I J I r

I

> '41" fWTiel'lV 6A~itt'9 .W), j 1

h I'

I ~ h "t ~

~R REMI 0

O O DIS .BU UNITED STATES NUCLEAR REGULATORY COMMISSION Docket r+ o~ 0 ea sng WASHINGTON, D.C. 20555

/P CParrish Docket o. I 25O June 7, 'l978 Docketing and Service Section Office of the Secretary of the Commission

SUBJECT:

FLORIDA POWER ND LIGHT COMPANY (Turkey Point Un)t 3)

Amendmdnt No. 36 Two signed originals of the Federal Register Notice identified below are enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( 12 ) of the Notice are enclosed for your use.

0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

0 Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

0 Notice of Availability of Applicant's Environmental Report.

0 Notice of Proposed Issuance of Amendment to Facility Operating License.

0 Notice of Receipt of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

0 Notice of Availability of NRC Draft/Final Environmental Statement.

0 Notice of Limited Work Authorization.

0 Notice of Availability of Safety Evaluation Report.

0 Notice of Issuance of Construction Permit(s).

Gtl Notice of Issuance of Facility Operating License(s) or Amendment(s).

00 Other Referenced IhtHEUKN documents have been rovfded PDRs.

Office of Nuclear Reactor Regulation

Enclosure:

As Stated DOR: ORBgl OFFICE~

SURNAME~ CParrish:,1.b!

DATE~ 6/6/78 NRC FORM 102 (1.?8)

4

' ~ ~ ~

'4 R

e

Docket Hot~50-200)261

~ ATTACHMENT HI).HHELD FROM PUBLIC DISCLOSURE Ml 25 1978 DIST.

f LEHORANDUH FOR: Albert Schwencer Chief, RSLB R/F w/o encls.

Operating Reactors Branch O'I ~Docket Files w/o encl Division of Operating Reactors, NRR JRMiller w/o encls.

RAClark w/encls.

FRO>t: Robert A. Clark, Chief EWMcPeek w/encls Reactor Safeguards Licensing Brahch Division of Operating Reactors M. Grotenhuis, encl.

SUNECT: TURKEY POINT 'UNITS 3 AND 4 MODIFIED /WENDED SECURITY PLAN REYIEW Enclosed are five copies of the report on the 10 CFR 73.55 review of Turkey Point Units 3 and 4. The repor t is. the result of' meeting held with the licensee on April 20, 19?8. The, report should receive the same distribution as the Phase I agreement. The distribution is described in the 0. R. (Miler memorandum of August 12, 197?, attached.

o..1.,-~ ~-n:d by:

Robert A. Clark, Chief Reactor Safeguards Licensing Branch Division of Operating Reactor s

Enclosures:

l. Report on 10 CFR 73.55 Review

~

of Turkey Point Units 3 and 4

2. Memo J"; R. Miller to K. Goller, D. Vassallo, R. Denise 12, 19?7 dtd.'ugust 773430182 OFSICK~ RSLB:DOR , L :DOR AS/RS:D R dURNAMlf ~ klTACHIIEHT I HHELD 0 P BLIC DISCLOSU ..HAGlaxk EMMePhEK----.

OATC+ ..........5/Q./78...... ........5 ./....

NRC FORM 318 (9.76) NRCM 0240 4 V d OOVCRNMCNT PRINTINO OPPICE> IOTd ded d24

rw I 4 4

II ~ 4 4

~ 4

'4 I 4~ I N

'I '

IF+ Ff ff(

4 F'l 44

+ I' I a 4 F 4 w) ~

~ ~

II I ~

4 4 llrf jk .

  • 4ljf4 F

>4 ffw I fag I

4 ajr r 4-fj ' 'I'prf j~ '4,41 4

44 - fl

~ Ff% 1' jt 4(R ',,

4 444 C

f 4 Pl Fj 4

1 wj gg, ff a F FF r

jt 4 4

! fp.

~ Il'4( 4 4 It 4

n DISTRIBUTION:

File

'E

-i Wetral File IE Rdg.

RSI Rd .

ADFC Chron. 4~ si sgril 6, 1978 JCStone,.o'Vi ~ '

WEllORCiRilI FQif: 0. Kisent<ut, @f9 toe Systems littd Projects, MR, t>HR FROti", '8.'. $ niezem;, A/9 for'ield Coor'dinat)ott', OROI', IE

' BLOCK(BiG OF STCgl LI'4E fiICi'FFCAEHTDLPRESSURE c'UBJECT:

SAFETY lHQKTIO i SMgd 99ABiG NQLGCtN ArT $ Q.K HESTD)CHOUSE OKSIKEG PIAgS " -'

C Qttring cl"'rccGA't 'fnspM~tion 4t tie Go Rob'fnsoQ 2g during cooldo'e the licctt oe b'epochs tw safety itt3~chion ittitiation it vQs fotttNf Hat tfgnal hat the Mgjt d)fferential prwsure bi>t",~e ri stoa;a lines end the stla line he~xv>>.r. TMs 'Mock $ s ban~-vireos into ti,"tt sam switch

, that is ttmd to Mock the yrmsurizar 'tow p);assure and lo'-~ level safety infect)on siglMl Vixen 'pl'iQQrg press%'e 'ls 6HO'A 2996. psigo 749 tccAAical sp~cifications (TctblG 3+5 3') 61191t'ocking boite but do ttot address i:ite blocking of'he steam 'lite high Bffer- prossltrizQF'ignttls end~al pressttr~~ .sigh'l.

The st~ am Header pressttre traAst:>Nter has e va'y narrow range; tainir!ttg output, ef AO psig. Thereof'<re. Curing cooldottn as stem generator pressum. drops & ~ 449 psig a safety 4tt$ ection t>)ll occttr $ i. this signttl is not Nockatf I He [tave also deteriaimd that Surrey 1 arid 2.and Yt rhea Po)tt4 3 end 4 have the sano CAstrttt," nt, and sicp>al Mockittg a&angertent and'technical sp-c)fication rcquif'QQGnts Qs N. 8 RCMttson 2.

4R@'GQR is requested to deters>ne the acceptability of blocMng the stean fin~ @if'fem<iihl pressttre safety $ ojectiott. sit;ttal dur$ ttg cooldo>e siklultNt>~ottsly l".$ 0: t ae blockittg of tAQ coiAcident pressttf'i XQf'CM levH and low pressure signal. Technical Sp'eB'ieagions for the Ave afore-t.- nt)oned'p'lattts sitoultt be mdifieg as require%

Qflitl5dl ctgsod $

p'A Safexek J. fl. $ t;ines. 8/lt for Fie)rf Coordinttfion t

Nv)sion of RQactol Oper4%wQM ce: F. J, Long, RII , lisp"c"ion, lE Q. 6- Hittch1ay, AII J. 9. Weigkbors, 0.'0'-1'-

H. Grotenhuis GAB-1 A. Se4~,"ence', 64-1

., CL'AAGT: Q. C. Stone (ggpgo) 3) FC: ROI: I E AOFC:ROI: IE JCStone JHSniezeg 773i10332 4/5/78 LO 4/ /78

MAR 0 8 F78 Docket Nos.: 50-250, 251 tlEMORANDUN FOR: Karl R. Goller, Assistant Director for Operating Reactors, DOR FROM Robert L. Baer, Chief, Reactor Safety Branch, DOR

SUBJECT:

TURKEY POINT - SAFETY EVALUATION SUPPLEMENT (TACS 87290)

PLANT NAt~E: Turkey Point Units 3 and 4 DOCKET NOS.: 50-250, 251 PROJECT HANAGER: H. Grotenhuis, ORB 81 OPERATIONAL TECHNOLOGY BRANCH: Reactor Safety STATUS: Complete Attached is the Reactor Safety Branch evaluation of Florida Power 8 Light's submittal of additional information on Turkey Point Units 3 and 4 with steam generator tube plugging levels up to 19%. We find the information acceptable based on the accident analyses and accom<<

panying Technical Specification limits presented.

Original signed by Robert Baer Robert L. Baer, Chief Reactor Safety. Branch Division of Operating Reactors

Enclosure:

As stated cc: V. Stello DISTRIBUTION:

D. Eisenhut J. Guibert RS Reading R. Cudlin R. Baer P. Check R. 'Landry Reading C. Berlinger F. Coffman S. Weiss A. Schwencer f5. Grotenhuis J. Giannelli 773560296 R. Landry c

OPPICE~

SURNAME~

RS/DOR g

...RgkfLd.ry. ...t.'......

RS/DOR ~

SIIRIII...,...

RS/DOR RDDRl DATE~ 3/g /78 3/g /78 3/$ /78 NRC FORM 318 (9.76) NRCM 0240 Q VI 0, OOVEIIHMEHT PIIINTINC OPPICEI I 070 02~24

~ Ut U. ~ l U IPt UU = UUU 4 UU l

U 4 5-f g

C 4

fUt l~

4 ~ 0 P. IW ~ gU UH UU 4, r) s 4

4'0 r4 WU U U UU U U UUU c4 I

l gn 4 4

U ~

~

p ) (, ~ 4l

~

P 5 'UU~ ~ i . UU

~ I l PU U l "<ky 4'U

~

~< >Of-'m>< Xan~gZgq.

'4088 f"9Cfr)iZ

)UU 4 U 4

g 1 il ~ ll

'44 1

)U' 4 l

~ U

)l U ~

4 Pg"U U Ur ~ ~

'1 4'$ 'j! I

~ U,l . ~

U 4 '

PANS g Iyg Docket Nos.: 50-250/251 MEMORANDUM FOR: Brian K. Grimes. Chief Environmental Evaluation Branch, DOR FROM John T. Collins, Chief Effluent Treatment Systems Branch, DSE

SUBJECT:

TAR 7094. TURKEY POINT UNITS 3 AND 4, STEN> GENERATOR REPAIR REPORT - REVISION 1 Me have reviewed the subject report dated December 1977 and we have no substantive comments to offer at this time.

John T. Collins, Chief Effluent Treatment Systems Branch Division of Site Safety and Environmental Analysis cc: R. Vollmer M. Kreger DISTRIBUTION:

Central File DSE Reading ETSB Reading - Subject File 4.4 JCollins 773010187 OPPICE~ SB' SURNAME~

DATE~

..JG IJ 3 Lna...

DsJmas........

NRC FORM 318 (9-76) NRCM 0240 0 Ue So 4OVERNMENT PRINTINO OPPICEI ISTd d2d d24

e I

$ ~

h" I I 4

~ I, I ~

}1} .'I hI}" I'.4 h I ~

+I 4v 4

4 44+ 1

'C I

4

'I It I

h tl II W III}

I'I

}l Il 4'4 1 II 1

I h 4 . I

'FEB 38 1978 Docket Nos.: 50-250, 251 MEMORANDUM FOR: Karl R. Goller, Ass)stant Director for Operating Reactors, DOR Robert L. Baer, Chief, Reactor Safety Branch, DOR FROM'UBJECT:

TURKEY POINT << INCREASED LEVEL OF ALLOWABLE STEAN GENEMTOR TUBE PLUGGING (TACS 07290)

PLANT NANE: Turkey Point Units 3 and 4 DOCKET NOS.: 50-250, 251.

PROBECT NNAGER: H. Grotenhufs, ORB82 OPERATIONAL TECHNOLOGY BRANCH: Reactor Safety STATUS: Complete Attached ls the Reactor Safety Branch evalaution of Flor dia Power 5 Light's f)roposal for operation of Turkey Po)nt Units 3 and 4 at steam generator tube p'}ugg$ ng levels up to 19K. We find the proposal to be acceptable based on the accident analyses and accompanying Technlcal Specification limits presented.

Original signed by Robert Baer Robert L. Baer, Ch)ef Reactor Safety Branch Div)sion of Operating Reactors

Enclosure:

As stated cc: V. Stello DISTRIBUTION D. Eisenhut Central Fil es J. Guihtrt RS Rdg.

R. Cudl)n RBaer P. Check RLandry Rdg.

C-. Ber linger F. Cofflnan S. Wekss A. Schwencer M. GrotenhuSs J. Giannelli R. Landry OPPICC~ DOR:RS DOR:RS DOR: RS RLand SWeiss RBaer 77355039-CURNAMC~

2/z g UATC~,......~.

)/78 2/~l/78 2j5p78 NRC FORM 318 (9.76) NRCM 0240 4 U, 0, OOVCRNMCNT PRINTINO OFFICCI I070 02~24

I v

~>>4 ~ 4 <<f'" ~ ' ~

>>4 V 4

!4>>

~ 4 >>~

7 'I 4 N 14 'I I I 4>>'>><<4 J>>4 I 1 t

<<1 444I -" 44>>

P'44 I V I tl I I>> )

t <<V 4 ~ <<

~ P 4 V . I V I I

4 I 4 7< ben@a Loaigizo LQ~K 4.~od'oH

>>V 0 ~

~

>>=V<<4-l ('f

. I>>4 ft A

~ -

'4 ~4 4 41 II 4

4 I~

V fl'-<<4 '

~ '>>

IL '! 'l'. I'V~

, ",.'f) 4 n

III

FEB 08 1gy8 Docket Nos.: 50-250/251 HEHORANDUN FOR: Karl R. Goller, Assistant Director for Operating Reactors, DOR FROM Robert L. Baer, Chief, Reactor Safety Branch, I DOR

SUBJECT:

TURKEY POINT SUBMITTAL FOR OPERATION 1GTH 19K STEAM GENERATOR TUBES PLUGGED jTACS 87290)

PLANT NlV)E: Turkey Point Units 3/4 RESOONSIBLE BRANCH: ORB-3, R. Clark OPERATIONAL TECHNOLOGY BRANCH: Reactor Safety STATUS: Awà ting Information Attached is a request for information which the Reactor Safety Branch needs to complete its review of the licensees submittal justifying operation of the Turkey Point plant with up to 19K of the steam generator tubes plugged. lfe request that the attached questions be transmitted to the 1 licensee as soon as possible.

Origlnal Bigael by Robert Baer Robert L. Baer, Chief Reactor Safety Branch Division of Operlting Reactors Encl os ur e:

As stated DISTRIBUTION cc: V. Stello D. Eisenhut RS Rdg.

D. Ziemann RBaer G. Lear RLandry Rdg, R. Cudlin J. Guibert C. Berlinger F. Coffman S. Meiss R. Clark R. Landry 773gZ0246 J. Giannelli

Contact:

R. Landry, DOR X28050 OOR:RSg DOR:RS DOR:RS~

SUANAMEW RLandly. t SWeiss RBaer ~~

DATE~ 2/y /78 2/P /78 2/Q /78 NRC FORM 318 (9-76) NRCM 0240 4 UI 8 OOYERNMENT IaRINTINO OIaIaICEI ID'TO 525 024

~y I

R y

R R ~ ~ I A

"I'I'S ~ ~ II<< ~ N 'yv N

II I ~ "I N

I ti II VR Wy<< N ty'I I

~ 'I I I ~ I t IW l VI'IIQ

' R

%l', I th I4y, ll

'I'g

<<fc

~ y

~ U R

V R

y'tr<< I,I I N

)

V W

,R ~

IR,R ll ~ I

~ 'g N

R ~

v ~ I

GEO g g 197?

Docket Nos.: 50-260 60-251 MEMORANDUM FOR: Karl R. Goller, Assistant Director for Operating Reactors, DOR FROM: Robert L. Baer, Chief, Reactor Safety Branch, DOR SU'8JECT: STEAM GENERATOR REPAIR PROGRAM FOR TURKEY POINT PLANT NAME: Turkey Point Units 3 and 4 DOCKFT HOS.: 60-250, 50-251 RESPONSIBLE BRANCH AND PROJECT MANAGER! ORB>>3, R. Clark OPERATIONAL TECHNOLOGY BRANCH INVOLVED: Reactor Safety

'EVIEW STATUS: Under Active Review The Reactor Safety Branch has completed a preliminary review of Flor-ida Power and Light Company's Steam Generator Repair Report.

Based on this review. we have concluded that we do not have any con-cerns which will affect the design of the new steam generators. It is expected that we will request some additional information regarding the analysis of potential transients and accidents.. Clarification of some of the information presented in FPL's submittal may also be required. These concerns may affect operating limits and repair procedures but should not affect the steam generator design, Rpbert L. Baer, Chief Reactor Safety Branch Division of Operating Reactors cc: V. Ste'llo D. Eisenhut R. Cudlin J. Guibert G. Lear L. Shao M. Butler B. Grimes R. Clark-C. Berlinger F. Coffman S. Meiss J. Giannelli, SWeiss RBaer 773OSOOS3 OPFICKW

@j aURNAMEW '--RSj'40 -- KK-- -AS%DO --------- RS/88 DATE&

12 77 12/~77 NRC FORM 518 (9 76) NRCIC 0240 4 u> a. oovaRNM arm s w NviNo orrtcas cosa- aaa.aaa

Ik

~ f I

i. N - ~

<<I<<'

n

  • 1.

It I <<4<<P<<<<ggtl I

= t t P kk f<<J'et f t<<4" 4 4I I lk I ~ f l 4~ I I

tl<<)ft 'l I It ~ ' e << 4 << , ,<<,, f

'I

~ I ftl <<PIQC" f jl<<1k' <<4 lj f +tkff <<<< f t<<ll fl I

.~ -" tklk k

=-, << 'I I. 'k fI f ~) f<< <<IIII

-f ~

<<el \, lilt <<I P f<<

I N

I I k t ,

~

k

<<) ' <<k0 <<<<kfkk I, +f'4I ~ ~

e "II I 'k I I'I ff<<<<tf<<

I, e Ik II 4 f<<

lk 1

,<<1 fftt f'f 1

\ Ik ~ 1 f 'I /

4 Sl t>)

4 I.

k',)J 1 I 'I

\ 1 f<<<<

DEC 6 1977 Distribution December 6,,1,977 ocket ORB g3 FLASH NOTE GLear RClark Docket No. 50-250 HEYIORANDUtl FOR: George Lear, Chief, Operating Reactors Branch 83, DOR FRY: Richard Clark, Project Ranager, Operating Reactors Branch 83, DOR

SUBJECT:

TURKEY POINT UNIT NO. 3 - STEAM GENERATOR INSPECTION Turkey Point Unit No. 3 shutdown for refueling, maintenance and inspections on November 24, 1977. As the first order of'usiness, FPL scheduled the inspection of the Unit 3 steam generators.'nit 3 had operated since January 1977 vrithout any measureable primary to secondary leakage through the steam generators. At present, 5.7% of the tubes in the Unit 3 steam generators are plugged. Based on the preliminary inspection results, FPL estimates that they may plug an additional 5$ of. the tubes to operate through cycle 5.

FPL expects to be ready to startup Unit 3 by January 22, 1977. NRC approval is required before Unit 3 can resume power operation. FPL estimates that the results of the steam generator inspections and evaluation will be submitted to us by January 3, 1978.

OI"iginaJ SIorIe .

g,J.Chrg'ichard Clark, Project Hanager Operating Reactors Branch f3 Division of Operating Reactors >

cc: E. G. Case V. Stello K. R. Goller D. Eisenhut R. Baer L. Shao D. Stuart 772980087 DRRICE~ ORB P~/g ORB j/3 OININAMCW RCl a .mj f GLear FLASK-'lKIT'E'.--'

12/6/77 12/6/77 DATE NRC FORM 518 (9-76) NRI 0240 4 UI 0, ODVRRNMIINTRIIINTIHO ORRICKI IOTO 42~28/

4t 0

~ H 4

I H

kl

DEC 0 2 1977 K. R. Goller, Assistant Director HENORANDUH FOR:

for Operating Reactors gg/

Division of Operating Reactors g gQ Z-8'/

FROM: L., C. Shao, Chief Engineering Branch Division of Operating Reactors

SUBJECT:

TURNEY POINT UNITS 3 5 4 AND SURRY UNITS 1'5 2 STEAM GENERATOR REPAIRS The purpose of this memorandum is to inform you that the Engineering Branch w)11 not meet, your schedules for first round questions on the above subject submittals. We are still reviewing the proposals and have not yet received input from our consultants. Me anticipate that our questions will be submitted,,to you by December 23, 1977

~

4'.

C. Shao, Chief Engineering Branch Division of Operating Reactors

Contact:

R. LaGrange Ext. 28060 cc: V. Stello D. Eisenhut R. Stuart G. Lear R. Reid J. Guibert R. Cudlin R. Clark H. Fairtile R. LaQrange OFRIC6~ EB: DOR

-2856O-9~~ E~-- 772980069 dURNAM6% ....RLaGrange';m RS.tua.r..t,,

OATe~ 11/'t78/77,,, 11677 NRC FORM 518 (9.76) NRCM 0240 5 VI 0, OOVRRNMRNT RRINTINO OFRICes I07d Odd&64

I'K Itvt it' tt

~ L vv K <<- vv K

I

~ 'I

'I,.

i III. ',K'., v,f JI E

vv f . 'tvpjf

~" + )v,*v gt I' o ~ ~

1 I

Kb

.0 NOV 28 1977 Docket Nos.: 50-260/251 MEMORANDUM FOR: Karl R. Goller, Assistant D)rector for Operating Reactors, DOR FROM: Robert L. Baer, Chief, Reactor Safety Branch, DOR

SUBJECT:

EVALUATION OF TURKEY POINT UNITS NO. 3 AND NO. 4 tWRGINS FOR DNBR REDUCTION DUE TO FUEL ROD BOM Attached $s an evaluation of the Turkey Point Un)ts No. 3 and No. 4 sub-mittal sih$ ch fisted the thermal mar gin credits available for offsetting DNBR rdduction due to fuel rod bed. Me conclude, on the basis of this evaluation, that no reduction $ n FhH fs required to accomodate the effects 'f fuel rod bovi$ ng for Turkey Point Units No. 3 and No. 4, since sufficient thermal margin exists.

pr jgina1 Bi@nod b7 Robort Baor Robert L. Baer, Safety BranchChief'eactor Division of Operating Reactors

Enclosure:

As:stated DI STRIBUTI ON cc: V. Stello Central Fil,es D. Eisenhut RS Rdg.

G. Lear RBaer B. Cudlin CKibert Rdg.

J. Guibert D, Ziemann R. Clark ti. Fletcher C. Berlinger F. Coffman S. Meiss R. Lobel C. Kibert 772930274 brrIcs~ DOR1 RS DOR:RS DOR:RS CKi bert:ct CBerlinger B~eer SURNAMS~

11/ lQ /77 11/ ggPT 1 Ij~/'77" NRC FORM 518 (9-76) NRCM 0240 A U, S, OOVSIINMSNT PIUNTINO OrrICSI IQTS 026 424

p 8 8 4 8 n 8 II 4 8

n 8 '

M If

~

~en 8 ~ ~ 4 M If

' I I 8 ft f

8 I 8 M 8 8

~ '

n 8

48" 8 I

~ IM ek

'I

~ n.

8'I

~I nn 8 $

888,44 1

8 .

j

~ ~ 8 4 If

~ f I+8)88 kl f1 e

I4 g

~ 8 I 8 4

Kn I 4 8 ~ e 4 4 I M 8'I, 8 ~ 18 4

<4 I f In MM

NOV a> ]977 MEMORANDUM fOR: Thomas D. Murphy, Leader Radiation Protection Section, RAB FROM: Richard Emch Radiation Protection Section, RAB

SUBJECT:

TURKEY POINT TRIP REPORT

'n fiovember 1 and 2, I attended the training program for an identification badge at Turkey Point Station. I attended the training with D. Solberg.

RES and J. Lee, ETSB and,the INEL people who will be performing the Inplant Program at Turkey Point. On November 1, 1977, we were given 'easurement a half day of videotape and live instructor training in radiation protection and the emergency plan. Me were also given the "Turkey Point Plant Health Physics Training Manual" to study< Later. whole body counts were performed on us and urine samples were taken from,us.

On November 2, 1977, we took a test to prove that we had gained adequate knowledge of Turkey Point's radiation p'rotection procedures. Then the others were given "red" identification badges allowing them .unescorted access to the 4Radiation Control Area (RCA)." However, due to my lack of experience as a "hands on" radiation worker, I was given a "blue" badge.

I will have to be escorted at all times inside the "RCA." The health physicist, L. Cushen, said that I could get a "red" badge if I went through their week-long training for ",first time" radiation workers. Since Cushen assui ed me that the INEL people would escort me inside the "RCA," I decided that further training and the "red" badge were not necessary for me.

Richard Emch Radiation Protection Section Radiological Assessment Branch, DSE cc: H. Kreger D. Muller.

R. Vollmer R. Fraley B. Grimes D. Bunch L. Barrett J. Collins D. Solberg D. Crutchfield DISTRIBUTION J. Lee Docket File E. Case DSE Reading S. Hanauer RAB Reading H. Denton NRC PDR/Local PD OPPICR9 ,RAB:DSg, ~ E SURNAME& RLEmc:. T.

CATE&

11/P/77 1 /y/77 NRC 1'ORM 518 (9.76) NRI 0240 6 Uo 8 COVSRNMCNT PIIINTIN4 OPI'ICCs $ 074>> SRlh024

I I I I I<< WI(<<,)) 'r ( 'I 'IE ~ )<<r I

a <<

I <<t I

I I I '

~ 1-I f I(

<<' )

I I I ~

1 a t 'f t)' ;a )]

f I

~ l I "I a ~ I f'I <<

a t ",

I

,~

I

<< I

(' <<'

I( (f (

G

~,

I I I I) ' ,1 ll m I,<<

IE a f<<

)<<, r.

a 1

t" I'))

t<< ~ ll I ~

~

r I

'<<1 I

~ I II

'g'A I\ I tr

OCT 21 1977 Docket Number: 50-250/251 MEMORANDUM FOR: Karl R. Goller, Assistant Director for Operating Reactors, DOR FROft: Robert L. Baer, Chief, Reactor Safety Branch, DOR

SUBJECT:

REVIBt OF TECHNICAL SPECIFICATIONS CHANGE (TAC a6goC)

PLANT NAME: Turkey Point, Units No. 3 and 4 DOCKET NUMBER: 50-250/251 PROJECT MANAGER: R. Clark PROJECT BRANCH: ORB 83 REVIEW BRANCH: Reactor Safety REVIEW STATUS: Complete The Reactor Safety Branch has completed its review of the proposed revision to the Technical Specifications for Turkey Point, Units 3 and 4. The review has indicated that the revision proposed by the licensee is acceptable.

Original signed by Robert Baer Robert L. Baer, Chief Reactor Safety Branch Division of Operating Reactors

Enclosure:

As stated cc: V. Stello 8. Lear D. Eisenhut C. Berlinger DISTRIBUTION:

D. Ziemann .F. Coffman P. Check S. Meiss RS Reading J. Guibert R. Clark R. Baer Reading R. Cudlin K. Parczewski K. Parczewski Reading opplce~ RS/DOR,(+. RS/.DQR~.... RS/DDR ...,....

eURNAMKW KParczewski: CBerlinger RBaer 7728602S1 10/~/77 b 10 /77 10/8/77 NRC FORM 518 (9.76) NRCM 0240 0 U, d, OOVCRNMENT PRINTINO OPPICKI IOTd end ed4

j I I I 0

I

-IM'Mg It I

I

'1 t'()~

1 1 ~* q MM II g Cfr ~ 4 1 1

~ . 44 4 ~ -1'1 I' r 1

I

~ 4, F

t 1

~; vfp lp 1

I lr 4

~ I ~ I*

1 r I 4' p 1

11 $ 1 I iI yy>> I-'r(0 ri 3f.f'f PXQ(fOg E'

~ II * ~

M '

1 I

1 I M

1'M il I Il'f"

'MI 4

D JUL 6 197?

NOTE TO: D. G. Eisenhut RE: TURKEY POINT UNITS 3 5 4 lte learned on 7/1/77 that, after the completion of refueling and the inspection of steam generators, FPL discovered that 11 row one tube plugs were missing. These plugs are about 6 inches in length and 0.775 inch in diameter. FPL is in process of opening up the reactor again to try to find these missing plugs. This will delay the re-start of Unit 4, and the schedule is not determined.

Potentially this incident may become a big problem should they not be able to find @11 these plugs, because they do not have a loose part monitoring system on site. Besides, what assurance do we have that the plugs would not come loose and get back to the reactor again?

This 'makes the reliability of the-explosive plugging method question-able. Ile are.following'the development closely.

FPL may request an extension of the Unit, 3 operation if theyUnit cannot, et Unit 4 back to power before the scheduled shutdown for 3 was scheduled to come down on 7/16/77).

L. C. Shao, Chief Engineering Branch Division of Operating Reactors cc: J. Guibert R. Cudlin R. Stuart F. Almeter B. D. Liaw EB:D EB:DOR ornca~ --28060""-

BVANAMa& BDLia ,mb .4.4s.ha.o.............

772i60005 g DATa~ ....u.k.<.7z....... .7/...,/.7..7....., I -r NRC FORM 518 (9.76) NRCM 0240 A v: s. oovssvwatm rswviHo orr(cd lors ssaes4

I 4

~ ~ I l, r " I I

F'q I t IV I,

VV

'Fh I I '"

F V ~ t "1 Fr' hl II

~

F f

l I I

I h

  • I S

=I,,I F

I F t

h

~.

~ A l

Vr A ~

v I NOTICES; r

ADVISORY PANEL FOR LINGUISTICS PURPOSE OP PANEL: 'To provide ad-" Amendments Nos.'5 and 24 to Facility Nottce of Meeting vfce and recommendatfons concerning Operating Licenses Nos. DPR-31 and Ad-

'upport for research in . systematic DPR-41, respectively, issued to Florida In acordance with the Federal bfoIogy. Power and Light Company which revised vtsory Committee Act, Pub. L.92-463, AQENDA: To revfeur.'and evaluate re " Technical Spectflcatfons for operation of the National Science Foundation an-th following meeting:,

gm search proposah as. part of the selection the Turkey Point Nuclear Venerating Units Nos. 3 and 4.'ocated in".Dade Zrsmor hdvlsory Psnol for Lingu!sties. County, Florida. The amendments are Date snd timor Nsy'20 snd 27, 1977, 9 sm. REASON FOR CLOSINQ: The pro- effective as of the date of issuance.- =-

~ ~

to 6 p.m. osch dsy.- posals being reviewed include informa- These amendments concern changes Plsoo itoom 517, Nstionsl Sclonoo Pounds- tfon of a yroprietary or confidentia required as a result of a reevaluation of tron, lsoo 0 stroot Nw." wsshlngton D nature, including technical information; the emergency core cooling system for 20550. financial data, such as salarfes; and pez- Turkey Point Unit No. 4. The eniergency Dr Psm a chspln, Pro Senal information concerning individuals core cooling. system reevaluation ful-grsm Dlrostoi for Linguistics. Room,320," fllh, for Unit No. 4, the requirements of.

Nstlonsz so}onco Poundstlon, washington, matters are wtthfzr exemptions (4) and the Commfsston's Orders for Modtflca>>

D.c. 20550, toioyhono'02-2~320., (6) of 5 U.S.C.:552b(c), Qovernment tion of License dated August 27, 19VB, sumrnsry mlnutos (opon portion): Msy bo in the Sunshine Act; and December 3, 1978. The operating obtained from the Committee Msnsgo- Ifmfts for Unit No. 3 set forth fn. Its Tech-ment Coordlnstlon Stsrr, Division of Por- AUTHORITIES TO CLOSE MEETIÃQ: nical Spectflcattons remain unchapged sonnol snd hfsnsgomont, Rm. 213, Ns Thle determtnatfOn Wae made by the tlonsl scionco poundsuon, washington;" Committee Management" Officer yursu- although the Unit No. 3 Technical Speci-D.c. 20550. - ant to provsforis'f Section 10(d) of fications witt be modified to reflect the 1 urposo or psnolr To prov!do snd rooom- pub. L.92-463. The committee revisions to the Unit No; 4 Technical oonoorrdng sbpport for ro ment Ofltcer was delegated the authority Speciflcattons. W Manage-'ondstlons sosroh ln Linguist!'

1 ds nd ~ to make such determinations by the Act fng DireCtcr, NSF, On February 18, 1977. compiles with the'tandards and re-The application for the amendments r~h Pm~

27, 12 m to 5 pm. To rovlow snd ovslusto the ~lection p~~ s~s d prof cts ss part of for Ol"n- '. M. REBECCh WzzrKLEE

'Ctfng COmmfttee quirements of. the Atomic Energy Act of 1954, as amended (the Act), and, the 0@ocr. Commhsion's rules and regulations. The of the curront status snd futuro plsns of Management Commission has made appropriate fin-the Linguistics Program. MhV 4, 1977.~ "r. ding as required by the Act and the Com-"

Besson for oloslngr Tho propossls snd prof- mission's rules and regulations fn 10 octs hsing rovlowed lncludo lnformstion of IPPeDoc77-ZSZS2 Pled ~77;srsd smt s proprietsry or conndentlsl nature, in- CPR Chayter I, which are set forth in cluding toohnlcsl lnformstion; finsnolsl NATIONAL FOUNDATION FOR THE the license amendments. Prior puUltc of these amendmeng,was not re-no-'ice ARTS AND THE HUMANITIES quired since the amendments do not in>>

RESEARCH GRANTS PANEL MEETING volve a significan hasards consfdera-.

matters sro within oxcmptlons (4) snd tton.

(6) o! d U.S.C. 652b(c), Government ln Correctfon The Commtsston has'etermined that the. Sunshlno hct.

huthorltyto close mootlngr This dotormlns- In FL Doc. 'IV-11259, appearing on the issuance of these amendments will:

tlon wss msdo by tho Cornmittoo pursu- Page 21874 in the heue Of Prfday, April not result fn any significan environ-snt to provisions of soctlon 10(d) of Pub. 29. 19VV, the date in,the last Itne of the mental impact and. that pursuant to 10 1,. 9~83. Tho commlttoo Msnsgoment firs yaragraph should read, "June 20, CFR 51$ (d)(4) an environmental fm Ofscor wss dolegstod tho authority to 1977>> pact statement or negative declaration mslro dotermtnstions by, the Director, NSP, . k. ~ .. and environmental impact apyrafsal "

NUCLEAR REGULATORY need not be prepared fn connection with, Da~: May 4>>77. hsuance of these amendments.

M, REEEcch WzNzrLEE.

Commfttee Marfagement Officer.

COMMISSION IDockot Nos. RM29 snd CONSUMERS POWER CO. (MIDLAND

~I 'ctfng For further detath wfthrespect Wthh action. see: (1) the application for amendments dated December 9, 1976, as

~

tpa Doc.77-13ZSZSpited~77;6:45 srrvt PM'N~ I MD supplemented by letters dated December 9, December 30. 1976, and January 3, ReconstItutfon of Atomic Safety and 1977; (2) Amendments Nos. 25 and 24 to Ucenslng Appeal Board Licenses Nos. DPR-31 and DP~1; and-ADVISORY PANEL FOR h hereby given that, in accord- (3) the Commhslon's related Safety

'nceNotice SYSTEMATIC'IOLOGY with the authority in 10 CFR 2.VBV Evaluation. AII of these items are avail-Meeting ~

(a), the Chairman of. the Atomic Safety able for public inspection at the Com-In accordance with the Federal Ad- and Licensing Appeal Panel has recon- mhsfon's Pubtfo Documents Room,,1V1V vhory Committee Act 'as amendeC stftuted the Atomic Safety and Licensing H Street NW>> Washington, D.C>> and at, Pub. L. 9~63; the National. Scfence Appeal Board'for this proceeding to con- the Znvfronmental and Urban Affairs

~

Poundatfon announces the- following -

ht of th A folio~ memb Lfblazv, Plorfda International Univer-Mlchsol EX. Psrrsr, Chslrmsn. , sity; Mfamf, Ftorfda.33199. A coyy of NAME: Advhozy. Panel for Systematfc items (2) and (3) may be obtained upon B1OIOgy., ~; *,- . " , Dr. W. Rood Johnson;;

~

request. addressed to-the UJB. Nuclear DATE AND TIME: May 1977-8:20 a Jn. to 5 p Jn. each day.

26. and 27, p

Dated:

'-" .. -=-. ~

May2;$ 977 .:

MhrrohEET E. Drr Pie. ~

t. r -Ltecretarg to the AS%eat Board.

~

Regulatory Commission, Washington, D.C. 20555, Attention: Director, Division of Operating Reactors.

PLACE Room 543 gatfonat Science 0-"Street NW., Wash-. " IPR Doo.77v12994 Pttod'~77:6:. 8 sml- 'oundation1800 Dated at Bethesda, Maryland,'hh 29th day of-April19V7.

' For the Nuclear Regulatory Commh .

~~ IDockots Nos.<XO-250 snd 5O-251I' sfon.

CONTACT PERSON:; Dr>> Johzt W, FLORIDA POWER, AND LIGHT CO.;, Qsoaas Lsha; .

Wrtghtrr Program Director, Systematfc... hsuance of Atnendrnents to Facility, ~ Chfs j, Operatfng'eactors BIOIOgy, PrOgram.-ROOm 338,'atfenal <<>> -,S Opelatfng~naea Branch No. 3, Dfefsfon.of Oy- ..

Science Foundatton, Washington. D.C 20550 telephone (202) 63~848:

e

.; The UN: Nucieaj'Regulatory

'ion..;(tf)e

~s,

~Commhston);1 has.

Commfs-hsued'-

eratfng fteactors..

IPR Doc.77-12995 Plied 5-6-Tl;8;46 smt,

~ r--+'.:r---". '-=  :~ <- fEZIEEAt Earigra,;yCZ,~O- a~OIIOAY,,ag,9,1 19.+

~ ~

0 JUN 9 1977 Doc ets Nos. 50-250 and 50<<251

'/ I'lElIIIORANDUH FOR: G. Lear, Chief, .Oper ating, Reactors Branch i)3, DOR FROM: D. El 1 iott, Project Manager, Operating Reactors Branch 83, .DOR SUB JECT: FORTHCOMING ftEETj,NG QITH FLORIDA POMER AND LIGHT COMPANY DATE AND T HE: I June 1 5, 1 977, 9;00 A.fl.

LOCATION: Bechtel Corporation, Gai thers burg Office PURPOSE: To. discuss technical pr obl ems associated with Turkey Point steam generator repl acement PARTICIPANTS: . FPL DeMastry, G. Liebl er ~ et al NRC D. El 1 i ott, L. Shao, R. Baer, M. Butler, B. Grimes, H. Fairti ] e, et al Crlafaal Signed b II Donald H. El 1 iott, Project tlanager Operati ng Reactors Branch 83 Division of Operating Reactors OFFICE ~ ORB P3 SURNAIIS~ DEl 1 io:mj 772 i 60006 OATS~ 6/'g/77 NRC FORM 318 (9.76) NRCM 0240 6 Ul S OOVSRNMCNT PRINTINO OIII'ICS4 ISA Sea+&

Ir" *' K 4 g,e,e e e 1, I e't 'e'e (le I I I e(e' e

I e ~

easel(,l1 (I~

reefe II A

J

(

e I

I '

l. ~

'Jgg 9 5??

Dockeks Nos. 50-250~

and 60-251 fiEthORANOUN FOR: G. Lear, Chief, Operating Reactors Branch 03, DOR FROM: D. El'liott, Project Manager, Operating Reactors Branch >93, DOR

SUBJECT:

FORTHCOMING MEETING WITH FLORIDA POWER AND LIGHT COMPANY DATE AND TINE: , June 14, 'l977, 1:30 P.H.

LOCATION: , Gaithersburg Office - Bechtel Corporation r

PURPOSE: , Ty discuss licensing problems associated with Turkey Point steam generator replacement PARTICIPANTS: .. FPL R. Uhrig, 0. Pearson, R. Lowenstein NRC V. Stello, K. Goller, D.,'-Hsenhuh, D. Elliott, L. Shao and Js Scinto, (GELD)

Original signed by Dbgald N. Elliott, Project Manager Operating Reactors Branch <3 Division of Operating Reactors OirirICd& ....ORB...k3............,

Q II R N A M d ~ DElliott:tjj 77Z160>>

OATd& 6Q /77 NRC FORM 818 (9-76) NRCM 0240 4 U4 8, OOVdRNMdNT isRINTINO OFFICds I070 CREMd4

C g 1

~

<<4

'lgl ';

PI 1

f I

NAY si ia7p Oockets thos, 50 60 50-251 and 50<<335 NEHQRAHDUN FOR: G. Lear, Chief, Operating Reactors Branch 83, OOR D. Davis, Acting Chief, Operating Reactors Branch 82, DOR FROH: D. E11)ott, Project tfanager, Operating Reactors Branch 83. DOR E. Reeves, Project Nanager, Operating Reactors Branch N, DDR SVBB1ECT; NEETING WITH FLORIDA POWER ANO LIGHT COi4PANY 'ORTHCOHIHG DNE WD TIV)E: June 2, 1977,~1'00 B.R.

LOCATION) ~Room 5709, kanyland"Nanional Bank Building PURPOSE: To, discuss FPL's po<~er failure of Haye lg 1977 PARTICIPANTS FPL

,DDlhittier. L..Leskovjan and G. Lieb1er HRG D. E11)ott, E. Reeves, D. Tondi, 6. D. HcDonald, J. Burdoin and G. Lear original signed by D. t3. E11iott, Project fianager Operating Reactors Branch N Division of Operating Reactors Original signed by E. Reeves, Project lfanager Operating Reactors Branch 82 Division of Operating Reactors OFFICK~ ...ORH.. F3........... ORB g ~~

SVRNAMKW DElliott:tnj EReefds 77gig0008 OATK~

5/3)/77 5/g/'/77 t

NRC FORM 318 9-7la NRCM 0240 4 Vl 8 OOVKRNMKNTPRINTINO OFFICE 1078 <<SK~KrR

S '

'I IP J

t S '

9'l I'4 Sl ~ I Pd I

I I bgd.j <+ fulfil'~> i4" pe

'I S

I" PP V JI t I l

'I S

I J I

4

Hay 9, 1977 FLASH NOTE P

HEHORANOUH FOR: George Lear, Chief, Operating Reactors Branch 83, DOR FROM: Donald ft. Elliott, Operating Reactors Branch 83, DOR SUBJECT; TURKEY POINT UNIT NO. 4 STGN GENERATOR g~P 2~4 Florida Power and Light Company (FPL) has reported that they shutdown Turkey Point Unit No. 4 beaause of a primary to secondary leak in the C steam generator. FPL reported the leak rate was approximately 0.3 gpm prior to shutdown Unit No. 4 will remain shutdown for approximately 8 weeks., During the shutdown period FPL will refuel the reactor and perform an extensive inspection of the steam generators at Unit No, 4.

This note is for information.

Donald H. Elliott Operating Reactors Branch P3 Division of Operating Reactors cc: E. G. Case V. Stello K. R. Goller D. Efsenhut H. Fairtile L. Shao (3)

J. Scinto DISTRIBUTION:

Docket ORBII'3 Rdg FLASH NOTE FI1 e OPPICB~ ..,OR.BP.3.....,....,

BVRNAMBW DElliott:acr 772i600l2 OAT B~ 5/ f..,,/77 NRC FORM 518 (9.76) NRCM 0240 4 U, 8, COVBRNMBNT PRINTINO OPPICBI IOTB B~~

W>>

1 Ei kfJ I g I EI F! 1 1 f

~ N. 4 1 'if 'il >>WDE Nf, "DJP>> ~

>>Ill IF' C'

>>I f

'I" WIF>>

I I

~

I'>>

I J

'I I f

  • Jl ~

I'

-Wt Fi 0>>'

, 'WW ~

'\F>>

1 1

CEI "f>>F ND

~ '

W I P e

f'r D e

il I' >>NEF

'W I

) Ef >>EI',r I

-'4 t W

- eqf-'F>>' f

<<g

I l

-~

E

NOTICES 15989 lr (2) e~i Letters from Te>>eeeee Valley hu-to the Db t r 0! Nuclear R actor IDocket Roe.60-260 and 60-26II ~

FLORIDA POWER AND LIGHT CO.

For the Nuclear-Regulatory

'61on.

co~-

bf dated January 19, and Pehru-el'p+

'tipn 1977r

~y ls.hxnendmente issuance of Amendments to Facility Oper- C g atfnp

~

(S) 69, Sl and 82 to the Sting Ucenses and Negative Declaration Reactors

~eat Perry Nuclear Plant PSAR. Branch No. 3, Dfvfsfon oj Op-gulatory Commhslon eratinp Reactors.

lf .

ui)e nultter of Tennessee valley Authority (the Commhsfon) Walls issued Amend e

't ~ Perry Nuclear Plant Unit No. S). mentS NOS. 23 and 22 tO Facility Opernt ing Licenses Nos. Dp~l and DP I PIt Doc.77-8677 Plied s-28-77; 8 l46 aml hccc de&'. pursuant to the Atomic mended and the resPectfvety. hsued to Ft<<fda

~, ~fo f 1954

's RAm and Regulations in Light Company, which revh

~part,2and50.fthold ISCFtt ar Tm~ ~

red. That comm and their appended of the Tur- Availability of Draft Environmental Specification for operation LONG ISLAND LIGHTING CO.

State-I key point Nucfeal Generating Units Nos nlellt for Shorehalll Nuclear Power Sts amended by adding e o ow g tion, Unit No.l hereby 3 and 4 (the facflftfes) focnted in Dade d DeT provision: unty, Florida. The amendments are

$ ~fble, the licensee Co as of the date of issuance.

Pursuant to the National Envtron-9' bmit a reevaluation of ECCS effective Theamendmentsnuthorizedexpnnsfon mental Policy Act of 1969 and the calculated in ac- United States Nuclear Regulatory Com-Performance m~ce with General Electric Com- of the sPent fuel storage pool cnp'stor-mission's regulations fn 10 CFR Part 51,

'valuation Model approved by the by replacing the existirig sPent fuel notice h hereby given that a Draft En-age racks, which have a capacity for vtronmental Statement (NUREG-0165) hWC st ff and corrected for the errors at Unit No. 3 and prepared by the Commission's Office of,.

d rf~ herein ari'd any other correc- 235 fuel assemblieswith 21V at Unit No. 4, new racks which related to porn b the Model of which the licensee have a capacity for 621 fuel ~embffes Nuclear Reactor Regulation I, am~ at the tf e the ~culattons are the prop ed op ration of the Shore- "

perfozmed. per Unit. ham Nuclear Power Station, Unit No. 1, The application for the amendments located in Suffolk County, New York h I llfh day of March 19V7,,

DS4d in Bethesda, Maryland. thh complfes with the standards and require-Fo r the Nuclear Regulatory,Commh- . as amended (the Act),

ments of the Atomic Energy Act of 1954.

and the Com-avaoable for inspection by the public ln the Commission's public Document Room at 1717 H Street NW., Washing-

=

mhsfon's rules and regulations 'The ton, D.C. and in the Comsewogue Public Commhston has made appropriate find- Library, .1VO Terryvtlle Road, Port Jef-Dfrector,OIIfceof ings as required by the Act nnd the 'ferson, New York. The Draft Statement IPIID ~~~

Nuclear Reactor Repufatfon.

~~ 28 77l 'the Commission's rules and regulations fn 10 CFR Chapter I, whIch are set forth in license amendments. Notice of Pro-posed Issuance of Amendmentstopactt-16 also being made available at the State Clearinghouse, New York State Dtvhfon

-of the Budget, State Capitol, Albany, New York, and at the Trf-State Re-ity operating Licenses in connection gfonnf Planning commission, 1 world Ipccket Noe. 60~91, ~92, and ~981 ~

with this action was publhhed ln the Trade Center, 56 South, New York, New DUKE POWER CO., CHEROKEE NUCLEAR FEDERaL REGISTER on March 25, 1976 (41 York. Requests for copies of the Draft STATION, UNITS 1 2 AND S FR 19363). No request for a hearing or Environmental Statement should be ad-Resumption of Evldentialy Hearing petition for leave to intervene was flie dressed to the UN. Nuclear Regulatory Th vid ntiar hearing will r~~e followh g notice of the pro~ action. Co~h ton, W~ington, D.C. Att n-The Commission hns prepared an en- tfon: Director, Divhlon of Site Safety

~

herein on April 26, 1977, at 9:30 a.m tn vtronmentnt impact apprahal fn connec- and Environmental Analysts.

'e tton with issuance of the amendments The Applicant's Environmental Re-house in Gaffne South Carolina. ,.'nd has concluded that an environmental portas supplemented, submitted by the It fs so ordered... .'impact statement for thh particular ac- Long Island Lighting Company h also tfon is not warrant because there will available for Public insPection at the 17th dn f March 1977 no significan environmental impact above-designated locations. Notice of

'attributable to the proposed action. availability of the Applfcant's Environ-I ~ ~ - AToMIc SAFETY AND LlcENs- ~

-:r='-'".

~

'or further details with resPect to this mental RePort was Publhhed in the FED-ING BoaRD, 4' action, see (1) the aPPlication for, ERAL REGIsTER on March 18, 1976 (41 FREDERIc J. CovrhL, "...".:-.amendments dated January 28, 1976, and FR 1136'7) ~

Chairman.:= ~

supplements thereto dated April 30, May . 'Pursuant to 10 CFR Part 51, inter-

,, fPR Doc,77-8676 Pued 8-28-77;8:46 aint ~

.10 and 25, June 1, August 3, October 15 ested persons mny submit. comments on and 27, 19V6. and February 10 and 16, lhe Applicant's Environmental Report,

.1977, (2) Amendments Nos. 23 and 22 to as supplemented, and the Draft Envi-ronmentnl Statement for the Commis-IDocket Nos.60-488, 60-489, and 60-490] Lfcenses Nos. Dp~t an d Dp~t (3)sion's consideration. ~erat and State

@DUKE POWER CO., PERKINS NUCLEAR 'he Cpmmhston's rclntcd Safety Evalua- agenctes are being provided with copies STATION, UNITS 1, 2 AND 3 .. tion, and (4)'the Commission's Environ- of the Applicant's Environmental Re-Resumptfon of Evidentiary Hearing -,mental Impact Apprafsnk All of these .Port and the Draft Environmental

  • - 'tatement (local agencies may obtain

~ The evidentiary.hearing will resume 'tems are available for public inspection, th herein on April 28, 1977, at 9:30 a.m. in'at the Commhsfon's Public. Document ments are due by Mny 16, 1977. Com-tbe Courtroom of the Davie County Room,,171V H Street NW.. Washington, .ments by Federal, State, nnd focal pfff

. Courthouse tn Mocksville. North Caro- D.C. ",and 'at the Environmental and clnls, or other persons received by the

". Urban.Affairs Library, Florida Internn Commhsfon. will be made available for It fs so ordered.. - ";;.;. -". tfonnl University, Mfnmt, Florida 33199 public inspection at the'Commfssfon's Public Docmnent Room in Washington, Dated at Bethesda, Maryland, thh"' Acopyof Items (2), (3),'nnd (4) may D.C. and the Comsewogue public Z,1-17th dny of March 1977. I "6,'.""-. bc obtained upon request addressed to -brary, 170 Terryville Road, port Jeffer-

,;.-,.;. AToMic ShpmY.'"AND LICE'Ns-:-.the U.S.Nuclear Regulatory commission, .son. New York. Upon'consideration of

'ING BORED, .. " ~ .;~ ~ Washington, D,C. 20555, Attention: Di-- comments submitted with respect to FREDERIc J. CovFAL,:,, -', - rector, Dfvhfon of Operating Reactors.. Draft, Environmental Statement, the

. - Dated at Bethesda, pfaryfand-thfs 17 Commission's staff will PrePare 8 Final IPIt Doc.'I7-8676 Piled 2-28-7I:8:46 aml'ny.of March 1977:. --..;~;-,-r 7, Envfronmelltat . Statement, the nVnft-r I

i:;FEDERAL.REGISTERr VOL'42r NO. Sy THURSDAY, MARCH 24,'977 1 ~

'a f.

2 ." .'C ~

', r sr- . r'

MEMORANDUM FOR: K. R. Goller, Assistant Director for Operating-Reactors, DOR FROM: Donald.M. Elliott, Project Manager, Operating Reactors Branch 83, DOR THRU: George Lear, Chief, Operating Reactors Branch P3, DOR

SUBJECT:

STEAM GENERATOR TUBE LEAK AT TURKEY POINT UNIT NO. 4 On January 25, 1977, Turkey Point Unit No. 4 was shutdown to repair a'9 gallon per hour tube leak in steam generator 4C. The leaky tube was determined to be in Row 45 Column 51. This is the second Unit No. 4 shutdown resulting from a steam generator tube leak since December 3, 1976.

Since the leaky tube is adjacent to the previously plugged tube in Row 45 Column 50 (Nemo for K. R. Goller, from D. M. Elliott, January 25, 1977),

FPL also plugged the tube in Row 45 Column 49 in a ef'fort to prevent recurring leaks in this area. The tube leak was determined by FPL to be located at or just below the bottom support plate.

Following the plugging operation for the above two tubes and during the secondary system pressure check, a slight leak was detected in the RoQ 22 Column 56 tube. FPL also plugged this tube. The leak location within the tube was not determined.

The tube leaks were not associated with small bend radius tubes. Unit No. 4 was returned to power, following tube plugging, on January 30, 1977.

Donald H. Elliott Operating Reactors Branch 83 Division of Operating Reactors cc: M. Fairtile D. Eisenhut L. Shao DISTRIBUTION F. Almeter Docket B. Liaw ORBg3 Rdg R. Stuart TJCarter J. Scinto (OELD) DElliott S. Goldberg (OELD) GLear CParrish ORB83 ORBP3 SURNAMCW E11iott.: cr GLear Gjj-f ., 772 i,60023.<'.

OATC ~ 2/ M /77 2/ 2- /77 PONn AEC 318 (Rcr. 9-S3) hXChC 0240 Q U. C, OOVCRNMCN'r PRINTINO OrrlCCI IOTA CZe 100

'4 444= ~ I 4

~ I I jI" D

't I '

Dc-t 4 ~. ~ ' ~ "4 tf I 4 WP

~4 tf lc ID I It Il 4 4 *!

4 ~

4 4

  • ~ 4 I ~

4 '4 ~

4444 H C ~ 4 P

<<4 4

4 I't 4

4

~ f 4 ~ ' I b P*

a PW

~

SHE ~

'H WWI' ) '

14 ~ Ef' 411 t14 1 Ht

'ij 4 4. ~

-4 4 If I

, II<<

4 I

  • ' lt ~ cf L - tlj'i

'I P 4 I DPI f

.Ilcjj 4 ll 4

~ ~

P fft4 CDW" H

4(4 tf c 'l 4

4 I- tl fc t ll 14 ~

ffi

\HH tl 4 4 fft

~

W,,j 1

I

.'* .. NOTICES 5148 denberatlve process and te thus-subf<<t to 'ain unchanged although tho Unit No:

Technfcal Specfflcatfons will bo modf-Tbfs <<'ndment modffles the Tech-nical Speclflcations by lowering the trip catf ing.

exemptlon (5) of the Act. 4 Authority to eicos meeting:

committee d '

hfan- fled to reflect tho revisions to the Unit ' Ievcl,setpoints for'the differential pres- cool telel mlnatlon was made by tho bahts No. 3'Technical Syecfflcatfons.. sure=instruments associated with )he gement Omcer p The applfeatfen for the amendmentS standalds. and re-HPCI Turbine trfp. ~". '-

Stcam

' Lin* ~

the-seve mlttee hfaaagemcnt omcer wse delegated tho compiles- wftII the Atomfc

~

Energy Act The appHcatfon for the 'amendment, one authority tomakodetermlnstlonsby thoDI- quirements of the ino rector, NSP, on y'cbruary IL 1876.,.... Of 1954, as amended (the Act), and the

'." .. Colnmission's rules and regulations The compHes vifth the standards and requlre-ments of the Atomic Energy Act of 1954, tors M REBBECCA WINKLER cern Commission has made appropriate find- as amended (the Act), and thb Commfs- tion fngs as requfred by tho Act and the Com- sion's rules and regulations, The Com- the entcrlt Olfter mfssfon's, rules and regulations fn 10 mission has made appropriate findings CFR Chapter Ir which are sct forth fn as required by tho Act and the Commis-fro JANUARY 24, 1977. perl

. the license amendments. Prior pubHc "

sion's rules and regulations in 10 CFR IPn Dcc 77 2~643 Flied I 26 77 8'45 smi 'otice of these amendments was not re- Chapter I, whfch are sct forth In the tfon NATIONALSCIENCE FOUNDATION quired since the amendincnts do not fn-volve a significant hazards consfdera-license amendment. Prior public notice of this amendment wl(snot required since

'ome ADVISORY COUNCIL, '" tion.

'the amendment does not involve a sig- as Revfsfon of Charter The Commission has determined that, nfflcdnt hazards consideration... m the issuance of these amendments will The Commfssfon has determined that 4CO result & any sfgnfflcant environ- the issuance of this amendment will not 'not in mental fmpact and that pursuant to 10 result in any sfgnlflcant environmental Foundation Advisory COIIncfL'FR 51.5(d) (4) an environmental fm-'mpact" and that pursuant to 10 CFR SL5 mi Ch pact statement or negative declaration (d)(4) an environmentaI Impact state- -

lice Yfsory Council was estabHshed. On and environmental impact appraisal 'ment or negative declaration and en-

  • of March8,1976toprovideadviceandcoun- neednotbepreparedinconnection with vlronmental impact apprafsaI need not sine sel to the NSF Director and principal issuance of these amendments. be prepared- in'connection with issuance members of hfs staff on Foundation-wide For further details with respect to this'f this'amendment. sl issues. This revision wfH Provide <<r action, see (1) the appHcation for For. further detafls with ~esPect to - the membership on the Council of non- amendments dated December 21', Ig76; this action, see (I) the appHcatlon for res scientists as well as scfentfsts. as suppIemented by letters dated Decem- amendment date/ December 17,'9V6. imp The revision described above fs re- ber g, December'22, december 30, 1976 - (2) Amendment No. 26 to License No. re- 51.5 tlected in the Council's modffled charter. and January 3, 1977 (2) Amendments, DpR-49, and (3) the Commission's- or:

Copfes of the charter addendum Ilute the Nos. 22 and 21 to Licenses Nos. DP~I lated Safety Evaluation. All of'hese me initial charter, have been forwarded to and DP~I and, (3) the Commission's items are available for public fnspectfon pre the Library of Congress for Public in- reiateh Safety Evaluation.'Ml of these at the Commission's PubHc Document th syectfon and fHed with the standing corn-. items are available for pttbHc inspection Room', 171V H Street, N.W., Washington.

mfttees of Congress havfng Iegislative at the Commission'8 pubHo Document'.C. and at Third the Cedar Rapids Public Li-Iurfsdfctfon of the National Science Room 1717 H Street, N.W;, Washington, brary,'26 Avenue, SX., Cedar.

Foundation. . D.C. and at the Envfronmental;and Ur- RapMs, Iowa 52401. D ban Affafrs library, Florida Interna- A.copy of items. (2) and, (3) may be 17'o tional University, Miami, Florida 33199. obtained upon request addressed to the A copy of ftems (2) and (3)'ay be ob- UB. Nuclear Regulatory Commission, All

[PR Doc.77-2641 Pued I-26-77;8:45 am I tained upOn requeSt addr4Ssed to the WaShingtOn, D.C. 20555, AttentiOn:, fns U.S. Nuclear Regulatory Commission, Director, Dfvtsfon of Operating; Re-

. Washington, D.C 20555, Attentfon: Df- actors.,

NUg EAR REGULA fpR(

~

-rector, Division of Operating Reactors. Dated at. Bethesda." Maryland, thfs- Pu

~MMISSIpN Q Dated at Bethesda, Maryland, this 14th lVth day'of January 19'lV;

'LORIDA POWER keR N~ ~2M a d ~251],

AND LIGHT CO.

d'ay of January 19VV For the Nuclear Regulat

.~

~ C~f mission.. - ~ '-

For the Nuclear Regulatory

.~ '- Com-.

ob U

A

  • ,Issuance of Amendments to Faclilfy- - sfon.

', tfo Ol"mongucen~ ~ ~

GMRGEL 8, Reactors': . Branch N0.3,Dt~onojO Ma Notice fs hereby given that the UB.. Chfej, Oye"attng Nuclear ReguIatory Commfss on (the ",Opel'g

" Branch NoR- 3; Dfofsion o '

+I edc tors j "

erdttnp Reactors.

IPR D<<.77-2283 Filed .1-26-77;8:45 ~L

~,

-. ~

  • Commfssfon) has issued Am dments NOS. 22 and 21 tO FaCIHty Oyeratfng Li- I FR Doc.77-2282 Piled I-26-77;8.45

" 'smi of'io

=,

". IDoceetNo.50-267I CenSeS NOS. DPR-3I and DPR-41, re- '

spectfvely, ssued to Florida Power a d . ' IDocheqNG,56-33 I . PUBLIC SERVICE COMPANY for operation of key Point Nuclear Generating Units Nos- =

3 and 4; located fn Dade County, ida.. The amendments are effective the Tur Flor-as of .,

IOWA ELECTRIC CO v T, AL.  :

LIGHT AND POWER Issuance of Amend(nent to Facility, OperatinKLlcense

~

',, i, COLORADO Issuance of Amendment to Facility,

". 'perating Ucense Notice fs hereby given- that the U.S.

OF'yec~cggfpns

~ .M the date of issuance *

. Tha UZ. Nuclear Regulatory Commis Nuclear RegulatoIVr Commission- (the No:-

These amendments concern changes sfon. (the. Commission) has, issued Commission) has issued Amendment No. V required. as a result of (I) the steam Amendment No. 26 to FacfHty Operating 17'o Facility OPerating LicenseCom- TH generator repair and (2) a reevaluation License No. Dp~g issued to Zowa Elec-' DPR-34 Issued'o PubHctemporarHy Service re-of the erne'rgency core cooling system, trio Light and power Company, Central- pany of Colorado which for Turkey Point Unit The orner- . vfsed Technfcaf Specification for No: 3. Iowa Power Cooperative, any Corn Belt operation. of the Fort St. Vrafn Nuclear reevaluation gency core cooling system fulMs; for Unit No. 3 the requirements nfcaI Power Coo p at ve" which revised Tech- G nerath g Station, Speciflcations for operation of the County, Colorado. The amendment was I~t d fn Weld of the Commission's Order for Modfflca-

- tion of-License dated August.27; 1976.-. Duane Arnold Energy Center, located in- effective on December g, 1976.

The 'operating Ifmfts for.Unit No;4 set. Linn County, Xowa The. amendment ls . The amendment temporarHy'evised the provfsfons fn the. Technical Specifi- to

~

forth fn its Technfcal Spscfflcations re- ' effectfve as of,its.date of fssuance..

f$

r F f

P r'

4 "1C t

/

rs'III~AT;-'TANIIAIIw'51 J 'HPFI j

RD8tAl; REGI57ERt.votr. 42'Q

~, 0 ~'tl '

~,,

4 'T s - w r

'%~Pc f

Q /III/TA'ff~

/=MS aW

~j JQf I P lg77 Docket No. 50-250 HEttORANDUN FOR: K. R. Golfer,.Assistant Director for Operating Reactors,'OR FROM: D. G. Eisenhut, Assistant Director for Operational Technology, DOR

SUBJECT:

TURKEY POINT, UNIT.3 PROPOSED REVISIONS TO TECHNICAL SPECIFICATIONS PLANT NAfIE: Turkey Point, Unit 3 .

DOCKET NO.: 60-250 RESPONSIBLE BRANCH AND PROJECT.NNAGER: ORB83, Donald H. Elliott OPERATING KECHNOLOGY BRANCH INVOLVED: Reactor Safety Branch The Reactor System Branch has reviewed the revision 4o the Technical Specifications for the Turkey Point, Unit 3 Plant. This revision has been proposed by the licensee based on a reana1ysfs of, the ECCS performance with upper head temperature equal to the hot leg temperature. Our review has indicated that the submitted rivision is acceptable provided the value of peaking factor in the revised specifications is changed too:

2.22.

Darrell G. Eisenhut, Assistant Director for Operational Technology "

Division of Operhting Reactors

Enclosure:

as stated cc: V. Stello D. Elliott R. Baer , N. Fletebher

.G. Lear . K. Parczewski C. Berlinger N. Anderson F. Coffman S. Meiss DI STR I BUT I ON Central Files DEisenhut RSRd. KParczewski Rd .

OFFICC~ DOR: RS, (I $

KParczewski:

P DOR.: RS..~...... DOR:RS OQ.. ',..... LO.T..

CURNAMC~ ---------------- 6%- CBerlinger RBaer DEi u 1/ $ /77 1/ t /77 1/ /77 1/ /77 772160026 DATC~ P POTID hEC-318 (ROT. 9-33) hEWf 0240 Q U, 2, OOVCRNMCNT PRINTINO OF ICCI IOTA 22II I06

I I 1

I' I

J

DEt: 07 1976 MEMOKQH)UM FOR: Harold R. Denton, Director, Division ok Site Safety and Environmental Analysis PROM: Victor Stello, Jr., Director, Division of Operating Reactors

SUBJECT:

REQUEST FOR REVIW OF METEOROLOGICAL DATA IN SUPPORT OF DECOM1ISSIONING THE TtJRKEY POINT METEOROLOGICAL TOVTBR PLQFZ N&K: Turkey Point 3 and 4 DOCKET NUMBERS: 50-250 251 LICENSING STAGE: Licensed PROJECT MANAGER: D. Elliott RESPONSIBLE BRANCH: ORB-3; EEB

. REQUESTED COMPLETION DATE: February 2S, 1977 This is a request for technical assistance in reviewing data submitted by Florida Power and Light in support of decommissioning the Turkey Point meteorological tower. The licensee proposes to use data telemetered from the South Dade meteorological tower in lieu of using the station tower.

He request that the Hydrology-Meteorology Branch review the data submitted and determine whether the South Dade information is adequately representa-tive of the Turkey Point site from the standpoint of determining the im-pact of routine effluents and accidental releases and whether the proposed telemetry of the data is acceptable.

A copy of the licensee's submittal is being transmitted to E. Markee with his copy of this memorandum.

Victor Stel o, Jr., Director" Division of Operating Reactors Office of Nuclear Reactor Regulation

Enclosure:

As stated DISTRIBUTION.

Central Files cc: See following page EEB Reading V. Stello E. Adensam D. Davis @-Wo

Contact:

E. Adensam, EEB/DOR

~ /.

28066.

E R EE D DO f/DO,'-

SVRNAMCW EA e am br B enhut VSte lo 12/j /76 12/ i /76 12/ /76 12/ 1/76 OATS W Form hEC 318 (RST. 9-53) hBCM 0240 k UI Sl OOVSRNMSNT RRIIITINO ORRICEI 1074 SSS ISS

F ~

1

~

1 , ~

I I er

~ ~ L 1

~=

rh PT l r

ll PI

) 1 ~

P,y LI I'lh I' r-" 1 k ~

ffg y r

> ~:

Y Pl 1' UQ

~ e "1' P ll'

~

~ Li ~

~ 7 1

$ ~

1 1'I 1 ~

11 ~ )1 I gl f ~

1 fh

~ 1

~ h P 1 1 rer 1'

JUL 6 1978 Docket Hos. 50-250 and 50-251 tlEttORANDUM FOR: Dohn T. Collins, Chief Effluent Treatment Systems. Branch, QSE FROM: L. G. Hulman, Chief Hydrology-lleteorology Branch, GSE SUBJECT': METEOROLOGICAL INFORMATION FOR TURKEY POINT APPENDIX I ENLUATION Lle have determined that meteorological data from the South Dade site would be most appropriate for the Appendix I 'evaluation at Turkey Point. However, a complete annual cycle of meteorological data from the South Dade site has never been submitted to the staff. Before we can complete our meteorological assessment 'for the Turkey Point Appendix I evaluation, we need an acceptable response to the following request for additiona'I information: \

Several years of onsite meteorological data from the South Dade site shou'Id'e availab'le. Provide joint frequency distributions (in the. format described in Regulatory Guide 1.23) by atmospheric stability (defined by the vertical temperature gradient between the ll.G m and 57.9 m levels) for the South Dade site for at least a tw>>year period of record.

Data recovery for the entire period should be greater than 90$ .

Hourly averaged data may also be provided on magnetic tape using the enclosed format.

oy letter of Nay 15, 1978, Florida Power and Light Company submitted additional information concerning the proposed decommissioning of the present Turkey Point meteorological measurements program. This additional information does not affect the meteorological assessment for the Turkey Point Appegdix I evaluation.

DISTRIBUTION Original 0'gael bF DSE Rdg HMB Rdg Docket Fi N

5

~

- ~

L. G. Hulman L, G. Hulman, Chief

'ydrp]ogy-ileteorology, Branch Division of Site Safety and Environmental Analys is cc: E. Narkee 78i56Q260 M. Burke ORRICR+ i. rairobe DS  : SE:Sf' 'ÃB St)RNAMR~

srobent jdEHMP n

,DATR~

07/~/78 07/O~78 07/36/78 NRC FORM 318 (9-76) NRCM 0240  % Ul $ OOVRRNMRNT PRlNTINO OlrlrlCRl 10Th>> 04~23

E ~ 'J P a 1

L ff ~ I

~, J t

v E

k V

'v ~ ~E P $

'I C, '

tf, P V t a E t L

'I LL a

IV

, ~ if ' I~

~ )

J a ~ I t a

'PP 1 E V 1 I

> w V 1"

. I~ JN" I E ~

~ ~

I V

  • 11

~

I 'V, IV

'I P' ~

I'

' 'I P Pt- ~

a "I ' ' '\g

'1 .' E f

~

4

~ va V

1 V 'ft V"'. ~ I EC - ' V V

1 1 ~

I=

a

'I' yd'.~ ~q>d 0;NVkgfao i~

I G. 1 fPP PG ~ rX 1

r , ~,

If 'J I

F ~

P I I E I 11

-'* I J

L VPL) 'N ~2 P

N P, I

, if F V

I VEI 'I II, t

JULY 9 4 1978 FLASH NOTE TO: A. Schwencer, Chief, Operating Reactors Branch 81, DOR FROM: Marsha11 Grotenhufs, Project Manager, Operating Reactors Branch 8'1. DOR SUB JECT: TURKEY POINT 3 - STEAN GENERATOR TUBE LEAK Qn July 19, 1978 a small leak was detected, fn Turkey Point Unit 3 Steam Generator C. Monitoring the leak all day 7-20-78 to determine the magnitude, it was found to range from 0.106 gph to 0.177 gph.

(Technical Specifications limit permits up to 0.3 gpm or 18 gph).

Monitoring of the leak is continuing. Present plans are to bring Unit'2 (fossil) back on line as soon as possible, shut down Unit 3 for repafr and hold Unit 4 at SOS power. This fs expected to delay Unit 4 shutdo)In for refuelfng and steam generator inspection by approximately one week from the scheduled date of August 1, 1978.

Original Signed Grotenhufs, Project Manager BY'arshall Operating Reactors Branch 8 Division of Operating Reactors cc: D, Eisenhut B. Grfmes V. Stello J. Scinto .

S. Goldberg R. LaGrange B. D. Lfau DISTRIBUTION

~~Nfl!)

ORBgl Reading MGrotenhuis CParrish ORBk'1 Subject File ORB j/1 x27433: t%""

CURNAMCW Mgrotanh.u.i.s....,....

7/24/78 DATC~ 7/Pt/78 NRC FORM 518 (9.76) NRI 0240 6 U 8, OOVCRNMCNT PRINTINO OPPICCI IOTO CC~+

~

.' l I

'I ~

II p>>

V ~

', P I

C 4

I F I J

fl V>> ' ll II h

'l f C>> ~

( ( V F

I, C>>f f f~

f, F ll ~

I I V V f ~