ML18227C492
| ML18227C492 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 07/18/1974 |
| From: | Cleveland R US Atomic Energy Commission (AEC) |
| To: | US Atomic Energy Commission (AEC) |
| References | |
| Download: ML18227C492 (4) | |
Text
Docket Hos. 50-250~
and 50-251 i
JVL 18 lg74 DcQKwW %1~
i e3 DISTRIBUTION:
I;-. Branch Chiefs EP-1 Reading EGCase'>> 'L L Reading
OGC Loca1 PDR DElliott>> OR-3 AGiambusso, RP RS (3)
GKnighton>>
EP N
AJoseph>>
RS JHendrie>>
- FCross, DBER TR Assistant Directors RFPxaley>>
ACRS (3)
TR Branch Chiefs RP Assistant Directors
'9 Daniel R Huller>> Assistant Mrector for Environmental Prospects THRU:
George P4 Knighton>> Chief>> Environmental Pro)acts Branch Pl FORTHCKfIHG MEETING FLORIDA PORK 6 LIGHT COMPANY TURKEY POINT 3 AtQ) 4 DATEt TINE LQCATIOT12 PURPOSE OF MEETING.
Wednesday>> July 24>> 1974 8430 84224 Turkey Point Plant Briefing by PAL on cuxrent status of envixonaental assessments at Turkey Point PARTICIPAECS.
AEC R
S
- Cleveland Arnold Joseph Feff Swinebroad Ford Cxoss PTA)RIDA, POMER 6 IXGHT COIAJlY Robert Uhxig Jack DeHastery et el O i8<ncl sl8ncrr 1I
,1L.> Clavctcnr1 nerf 1Iy1 Enclosures Agenda Richard S
CleveXand>>
Prospect Hanager Envtronmmtal Pro)ects Branch Moo 1 Directorate of Licensing t
OPPICC~
aVRNAMC&
DATC SP'.EP-1 RClevelandtsh 7/
(74 Form hEC-318 (RCT. 9-S3) hKar1 0240 k U, dr 44VCRNMCNT PRINTIN4 OPPICCI I014 CSC
~ CO
1 RJ 0
0 D
e
AGEi%)A ITEMS FOR TURKEY POINT.HEREBY 7/24/'74 1.
Status summary of construction program and. related activities.
2.
Review of status of program on mechanicaE cooling devices, plus reports prepared to date and planned.
3.
Review of status of program on alternative water sources, plus reports done and planned.
4.
Review -of status of program on water circulation in Card Sound and Biscayne Bay, plus reports done and planned 5.
Review of status of design and operation of discharge control stxucture.
6 ~
Review ox status of public access to cooling canal area and other parts of site, including status of Boy
&. Girl Scout camps.
7.
Summary of proposal fox modifying monitoring for heavy metals.
8.
Summary of assessment of ground watex monitoring data.
9.
Highlights of past 1/2 year,'s regular monitoring progxam, including summary of any problem.areas that might ba suggested.
10.
'Overall. summary of other environmenta1 assessment activities, including study of terrestrial biome south of cooling canal area.
'0