|
---|
Category:Environmental Monitoring Report
MONTHYEARML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-037, Annual Radioactive Effluent Release Report2023-03-0101 March 2023 Annual Radioactive Effluent Release Report L-2022-076, Subsequent License Renewal Application - Appendix E Environmental Report Supplement 22022-06-0909 June 2022 Subsequent License Renewal Application - Appendix E Environmental Report Supplement 2 L-2022-070, 2021 Annual Radiological Environmental Operating Report2022-05-0303 May 2022 2021 Annual Radiological Environmental Operating Report L-2022-031, Annual Radioactive Effluent Release Report2022-03-0101 March 2022 Annual Radioactive Effluent Release Report L-2021-243, Errata Corrections to FPL Letter L-2021-043 Re 2020 Annual Radioactive Effluent Release Report2021-12-16016 December 2021 Errata Corrections to FPL Letter L-2021-043 Re 2020 Annual Radioactive Effluent Release Report L-2021-099, 2020 Annual Radiological Environmental Operating Report2021-05-10010 May 2021 2020 Annual Radiological Environmental Operating Report L-2021-043, 2020 Annual Radioactive Effluent Release Report, January 2020 Through December 20202021-02-23023 February 2021 2020 Annual Radioactive Effluent Release Report, January 2020 Through December 2020 L-2020-079, 2019 Annual Radiological Environmental Operating Report for Turkey Point Units 32020-05-0707 May 2020 2019 Annual Radiological Environmental Operating Report for Turkey Point Units 3 L-2020-032, 2019 Annual Radioactive Effluent Release Report2020-02-27027 February 2020 2019 Annual Radioactive Effluent Release Report ML19221B5832019-07-25025 July 2019 Biological Opinion for Turkey Point Nuclear Plant Units 3 and 4 License Renewal ML19206B3492019-06-18018 June 2019 Required Turkey Point Annual Monitoring Data 3 - tn_1999_2018_022819 ML19151A7292019-05-31031 May 2019 Public Comment from Laura Reynolds on the Dseis for the Turkey Point SLRA L-2019-017, Submittal of 2018 Annual Radioactive Effluent Release Report2019-02-27027 February 2019 Submittal of 2018 Annual Radioactive Effluent Release Report L-2019-020, Subsequent License Renewal Application Environmental Report Environmental Authorizations Updated Information2019-01-23023 January 2019 Subsequent License Renewal Application Environmental Report Environmental Authorizations Updated Information ML18227A9572018-08-15015 August 2018 Submit Environmental Monitoring Report No. 10, January 1, 1977 Through December 31, 1977 ML18227A9612018-08-15015 August 2018 Submit Semiannual Environmental Report No. 7, January 1, 1976 Through June 30, 1976 ML18187A0302018-07-23023 July 2018 Cooling Tower Retrofit Is Feasible and Cost-Effective L-2018-054, Turkey Point, Units 3 and 4 - 2017 Annual Radioactive Effluent Release Report2018-02-16016 February 2018 Turkey Point, Units 3 and 4 - 2017 Annual Radioactive Effluent Release Report ML18066A5622018-02-16016 February 2018 2017 Annual Radioactive Effluent Release Report L-2017-083, Submittal of 2016 Annual Radiological Environmental Operating Report2017-05-11011 May 2017 Submittal of 2016 Annual Radiological Environmental Operating Report L-2017-029, Submittal of 2016 Annual Radioactive Effluent Release Report2017-02-28028 February 2017 Submittal of 2016 Annual Radioactive Effluent Release Report L-2017-028, Submittal of Special Report of Containment Tendon Corrosion Protection Medium Volume Reduction2017-02-22022 February 2017 Submittal of Special Report of Containment Tendon Corrosion Protection Medium Volume Reduction L-2016-106, Annual Radiological Environmental Operating Report for 20152016-05-12012 May 2016 Annual Radiological Environmental Operating Report for 2015 ML18187A0262016-03-22022 March 2016 FPL Faces Lawsuit Over Leaky Nuclear Cooling Canals at Turkey Point L-2016-029, Submittal of Radioactive Effluent Release Report for 20152016-02-26026 February 2016 Submittal of Radioactive Effluent Release Report for 2015 L-2015-102, Transmittal of 2014 Annual Radiological Environmental Operating Report2015-05-11011 May 2015 Transmittal of 2014 Annual Radiological Environmental Operating Report L-2015-038, 2014 Annual Radioactive Effluent Release Report for the Period January 1, 2014 Through December 31, 20142015-02-25025 February 2015 2014 Annual Radioactive Effluent Release Report for the Period January 1, 2014 Through December 31, 2014 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 10 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 10 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 13 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 13 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 9 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 9 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 8 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 8 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 7 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 7 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 6 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 6 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 5 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 5 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 4 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 4 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 3 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 3 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 2 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 2 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 1 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 1 of 18 ML15364A4222014-08-31031 August 2014 Annual Post-Uprate Monitoring Report for Uprate Project. Part 5 of 18 ML15364A4202014-08-31031 August 2014 Annual Post-Uprate Monitoring Report for Uprate Project. Part 3 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 11 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 11 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 12 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 12 of 18 ML15364A4232014-08-31031 August 2014 Annual Post-Uprate Monitoring Report for Uprate Project. Part 6 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 14 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 14 of 18 ML15364A4182014-08-31031 August 2014 Annual Post-Uprate Monitoring Report for Uprate Project. Part 1 of 18 ML15364A4212014-08-31031 August 2014 Annual Post-Uprate Monitoring Report for Uprate Project. Part 4 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 17 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 17 of 18 ML15364A4372014-08-31031 August 2014 Annual Post-Uprate Monitoring Report for Uprate Project. Part 18 of 18 ML15364A4342014-08-31031 August 2014 Annual Post-Uprate Monitoring Report for Uprate Project. Part 16 of 18 2023-03-01
[Table view] Category:Letter
MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] |
Text
U.Q. NUCLI)AR IIEGULATOIIYCO 'lS I ON 0 0 C V. L' glQ)gl@+
t!.70)
FILE NUMOL'll MAC DISTRIBUTION Fon'~I'ABT 60 DOC I(CT MATEII I AL I I FROM:Flordia Power'8 Light Co. DATE OF OQPUMI. NT 7- -7 Miami, Plordia W.S. Tucker, Jr. DATE RCFENE06 9LETTE R ~ ONOTOFllZEO PROP INPUT FORM NUMOER OF COPIES IIECEIVEO OORIGINAL KIUNCLASSIFIE O
~COAX~,
OESC RIPTION ENCLOSURE Ltr., trans the following.....' Grounwater ""onitoring Data: Report Sequence 8 I
103 for July 1; 1976 and the Lybortory analysis of the groundwater s'amples from June 1, 1976...
(','Carbon Signed .Cj; Received).
.: DO¹OT REMOVE i i PLANT NA)'IE: Turkey Pt. 0 3 5.4 ACKNOWLEDGE~
SAFETY FOR ACTION/II4FORIvlATION ASSIGNED A'D: AS. IgxV.n~".P ~
RANCII CI ITEF: :Lear ~h'r l~~TISI ~
PROJECT lit )AGER: PROJEC ~ I' C ASST.: arrr1s LC AS INTERNAI. DISTRI DUTIO)4 E'G F 5YSiTENS SAFETY rS ( VK~ZSXE"'" SI~TZ SAl'l
....r
~
)IE INES!Ai'< ~
~"-S.r. . ~I. IRO A'.le'.'STS 76)".'1~V.'T I,. ~
SCt! R()::D "R )3F it'!'<ROYA t
D~t'l Q~MUII'~
OELD GOSSIC1' STAFI. ENGXNEERXNG IPPOLITO Zltt Sn ZnL OIXPC- >IAC( '<"~ I(IRI .'i~GOD
'ASE KNX(tlIT
)IANAUER SIIIZ.'I',XL OP:;RATING REAC'1'QRS ARI.ES PAI 11.XCKX I PROJECT NANAGEHI'.NT REACTOR SAFE'IIY OPERAYI~I', rC I Q %.'.>
BOYD ROSS E I!il'.iRIUT s r.
P ~COLLINS NOVA)(. SHAO U)ULUA HOUSTON ROS'! TOCZY BAI:.R pr'Ti::i:Sou CIIIXI( Blr"I.'LER S> >>Z .XS
'I:J.'I IIELir. (:Ig) I!'.S M'OLL 1lEl.TF.i~! I'. S AT5:X B)ii'lC)
SI:OVIIOI.T SALT7..'Ih".I J OLLDtS I l 'l'I ' I\
~ ~
I I
~ $ ~ ~
'I IlOL l I lll ~ l g Il:( I Lii !r'll 'I)l~'I IIlln
~ ~ ~ ~
~
~
) (
NAT'.A13: 13)l001<IIAVI',N NA')
'XC: RI',(l ~ V XI'. l.l(Il:!I()N(OIILltI.
SXC: lA 1'l)ll 7335 hSL13: CON! il)I,'I'ANTS lltl l ~
~
1 L
lg
.KVf//g IR'e~atoiP P~
>~'~wg ~ ITIC j
-':,'dp 'r~ / RIOA POi GMT COL'IPANY
>/
r
, oocnYU>
($ U tp, a~uX i8~
~i g(p 5octe+
Cbrt Mr. W. V. Storch, Director Resources Planning Central and Southern Florida Flood Control District P. O. Box V Nest Palm Beach, Florida 33402
Dear Mr. Storch:
Re: FCD/FPL Agreement, Turkey Point Groundwater Monitoring Report Hater Sam le Anal sis is the Groundwater Monitoring D'ata Report
'ttached Sequence No. 103 for the FCD wells (G-Series) for the July 1, 1976 reporting period. Also attached is the the laboratory analysis of the groundwater samples from June 1, 1976 reporting period.
Sincerely, g ag, S. Tucker, Jr., Manager
~
g- 'Environmental Affairs Enc.
cc: Mr. Donald Elliot, USNRC (Appendix B, Environmental~
Tech. Specs., Turkey Point)
'7335 PEOPI.E... SERVING PEOPLE
- Lu;~~us
- POW=-R 6 LIGHT .CO.: .-.:..... REPORT SEQUENCE NO.
DATE SUBMITTED
,GROUNDWATER 'MONITORING DATA .:
FOR TUR!<EY, POINT- FCD. WELLS (G-SERIES)
~ . ~ I '
r SURFACE Y/ATER LEVEL SURFACE Y/ATER FIELD hlEASUREt>IEtIT LAD RESULTS EFERENCE )hEASL>RE D AT DEPTH DEPTH CQtIDIZTIV VlELL NQ. DATE TIME ELEYAT10>'I ELEV. D EPTH ttQTES 0 ELO)V 0ELO'lY ELEV. ITY TEMPC 1YATER'AthPLE CI (F'K, thSL) (FX,WSL) DELOY/ 0 'II05 (FT,,thSL) REF.,(FT) REF(FT) t R EF. (FT.} (FT.,thSL) I3>II Cp $ P Ph(
%5<<>% }g(4'>i 44< <<'f I>.-krI
..v7C5 2. 02
' 6 '1'>>~>-*g cr ji.-'".'>L%>elf'
'l3,>A'":/L'>I7i,:-':i%
~(-'7 2.)9 >V/.(>>qg j>>
~~/'0'g~E -"[Pj,$6 II
).90 -Q Q~t "'9N('> g'3 .e p,f."dj5g(~p$ +if.':I;o' ~gpvf > f~;"~g%',
'i7"~At." pe)g~j
/>"J 2.39 o Qc
,pepin;~<p~e.
I,"3i,, Ii.~3>>c,
>:, j;gjk-cygne; e:->j'O ~',ei
>';!>.i > pg< gjglI~<
>'p<>> ~ptSeN"'"
~> Z($ Ig>'e~f/
'>$ ~~ 5:>r >r Pg'r> '&S >k II"qI, r>'.ppj "-)
"~IZj~I CC/) 7$ Q >Lg )Gv k6::0+p ."-;g:6":27 ..33k>s: >>
A)ai"'gj4PA
> '\>r "6'"59"
" l2.) 3.29 )'6 I >gee>)$
=.!':8!Ltd
"~p<<%:.Z4~".'(S 3:4-'G-L; Q b~j sq,)a<vs.'-J'V~~Lsggj
-) 7I 9.8
>'>>>r .><<> ><< 'g
<<I36P~~Qe3>e
- I:">I'.oqj! -57,'89 j4bl><~~<+~ @
e 3,eI
>".> ep><<yI>xi I 3":(>H:'<g,'
>$ ~$ )( >>g >r, j$ >>>'e ~~>T g
G. I I Q~t( R8<S~. Vi 3>",P!0,::>S 6/gA')!'i g~ (ST~.>
'>'g5x$
ger
> ">1>r Pi>> 'i4<c~+4'PP>: (>+pei if),"'(".>IS" M4;$;spy>$ >>
I~II$ $ '.i>
c> ) gP jXPr .<~,
P"..}>>P,F'3 r>S I" "v0;ge S.O7 3y.1f!y4 "'J 0.;:~r -. 46.95
,':~98 2. 80 I -8>I "I::I>Pl -"I 7:.Ig +<3,>>>'gloo9g ~ QWt .).Qj
.. 0'-taO (3"'I 0 i3 Z.7O o( I. I 2>
/
Pf ~
r
- vi ze3 Q;i; -4XS
- -) t.:i'i.',
FLORIDA POIfER 8 .LIGHT CO. BEPORT SEQUENCE NO.
DATE SUBMITTED GROUNDWATER tttONITORING DATA FOR TURKEY= POINT- FCD V/ELLS (G-SERIES) SHEET 2 of 5 SURFACE iYATER LEVEL SURFACE VIATER FIELD t?(EASUREh'IEttT LAD (EFERENCt: RESULTS DEPTH DEPTH t.ir:ASU .CD nT V'ELL NO. ELEV. CONDUCTIV V'ATER ELEVAT10N (FT.,h'ISL)
DEiOVi REF(FT)
('"'") BELOVI REF. (FT)
(FX, t(SL)
DcPTH O':Lti'V Re~F (F T ITY (FT.,t?!SL) (t.llCAOM'!05 t'F it Ct.i)
TEh!P., C SAtlPLE CI PPtl NOTES S-I I. 7'I. A lb 6- l 2A I I <l'o s.79 l-((' Z ~l,3: l:7o ~ "9'- 50::-'0
~zt";
('-'1 6" l 2B l Il-'~ z 92 -" 'l-tl 1-'I~ --', '-'l 6.09 -C!
. G-l 3 II)t'.05 2 oLt Z"~i ) q3 '20; -:"':
-fil.5;95 2-f" 7
'0" -35.95 lg,7t't',O.
'40'..'45,2l
/'" F?0'.: ',;:,:::.
.-55;95 }IggI;'j) 3.48 :.;za - I 6'.52 >~~>> P~l-.k~.
-36.52
"-, '0="::-;..-56.52 S l5 -l (u' -:=' I- ~oi)
G-I GA 6 l68 G-l 7A
/),
7 I t't1S
~l((
~~<'.~
4.88
~4.07 S.79
- 3. Pg peg 8'(
'0';.
I,q<t t'"IS' 50'; -45;la
-5O'-';..
-i -l5;95
-4ixl L(CjOt".it)
>I(',ua G-178 ~8'"~4.20 .,',-;2".'+ .20 -.: -l5.80 2".l'pc':(
S-I 8 a-l (Sz))' g -26 l y lO~,fi G" l BA 7<<('El~ 3 3I ~13'/ 'f Mt"~-'~
G-l SB 7 l7. 0~M Qcl
FLORIDA POWER 8 LIGHT CO; .,;L=.'>ORT SEQUENCE NO.
DATE SUBMITTED c
GROUNDWATER MONITORING DATA FOR TURKEY POINT FCD V'ELLS (G-SERIES) SHEET 3 of 5 I
tlFASUREhlENT LAO SURFACE YIATER LEVEL aqua SURFACE YIATER FIELD RESULTS R EF EREN CE DEPTH DEPTH > <EASUflED AT COMDUCTIV YIATER YIELL NO TIME ELEVATlO'l ELEV. ELEV. DEPTH C CI NOTES D ELOYI 0ELOYI ELEV. ITY SAMPLE (F T.,MSL) REF.,(FTJ (FT.,MSL)
REF.,(FT.)
(FT., hlSL) 0.'c!c'EMP.,
CELO'ri
~REF. (FT.)
(FThMSL)
'-'i7.""2'<2'i (4:I C I!0 h6,,0$
P<.'cl CLI)
I" "'<<~;
PPM g: G;,,20';
ji>>'p'j~'ATE f~ 'I 2,78 < <!'/ LR j~~<<>>
~A .,vs'<,~Pc A@~(d~,'! r.
cc
"'.y p'gp<'>>'p
~'jigr <<g.>>:~['g
-'>>, '>><5<& @: ' (<cd s~p
+r<,f p g >8ri'y.;<<)<'.
-. c~pc.':i j'c>>2<j ~<>>
<<j9 4.20 his <.0I $ Qg0 Vh"."<4 ~.~">> = ""-::":-:-'6 '"'4O""'""."'5'<<5"6 "VK:-:
'< <4wt">>
()(~C;~<<<<+<!i
<@Q>>p>>~~>~I
$g,<r rc QQgQ>><>>ccc -~. >>>><+<~<<>><.
<6<$ ,
Q~sitff$gQj 32~ 5<02 I~~ I'6" h-.:6,0A(< -;,'-44.9 c gY.h>>>>>wc.
'-:--";6~ 239 :?hf-: i.3gc, 4.56 '2.C.& "'"I"'"'I-:!."<2F'0 "-':i "4>>'4':- <>
'<."6.-,;2,4A j~~ 4m 9 2 3'7 "jSijg!I:;! c:<'5,'0, <<;".4;5, !8;Ikt,"
.2I,G".;g'48 i3'/; 4.52 .
2 Pt f-:<;~~!gg g,'2'afar ~16'.4>>6:.-:>e4! ~ j<<Jq~gg~fcc 6~>>y '<. giA>>.8
='-'5'.25:"-
~.G'56. /3>~ 5.72 g o P'j~!kJ:jj:!
c .*'<<
~ (i;:25b 4.82 '-;tP>~"'j'" $
j;6.;,2 f;l i i'.84 I 'Il I:7S @gg>Q.'-, ~$ 2'bg!;.": '-.:'I,6:06 .'0;:kPi
<IJ<<@ygp;KPPg~
<<<4>>;~'>>c>>K g-:.4'Oc>> -",56.0
,c;~W~ ~!"..V.- a 60'~~.'56;0 .Q'1 '~':-'.
gpss;g~p:.'.
. I
FLORlDA POV/ER 8 LlGHT CO. Pi'=!=ORT SEQUENCE NO.
DATE SUBMlTTED GROUNDWATER ViONITORlNG DATA FOR TURKEY POINT FC D WELLS (G-SERIES} SHEET 4 of 5 SURFACE WATER LEVEL SURFACE WATER FIELD tIEASUREMEtIT LAD REFERENCE RESULTS DEP.TH DEPTH I,IEASUPED AT WELL NO. DATE TIME ELEVATION DEI'OW ELEV. D.":PTH V<'ATER Ti"') DELO<V Q.<i,'v'ONDUCTIV NOTES DELOW ITY TEI<IP., C CI (FT,MSL) ( I; ii.,ro:",,os SAMPLE (FT.,MSL) REF.,(FT) REF.,(F T.)
REF. IFT< (FT tISL)
Pc<il C J) P Pt<I
- -.',G',28 2.70 ').<t g
34l 2. q<l 4.66 5.67 4 )5
)>5>
3.6) I ql 4.72 .~,O~J 6.24 bJ hi~
FLORIDA POVIER 8 LIGHT CO. REPORT SEQUENCE NO.
DATE SUBMITTED 4 o GROUNDWATER MONITORING DATA F.OR TURKEY POINT FCD WELLS (G-SERIES) SHEET 5 of 5 SURFACE WATER LEVEL SURFACE WATER FIELD MEASUREMENT LAB RESULTS EFERENCE DEPTII DEPTH hIEASUAED AT CONOUCTIV. WATER WELL NO DATE TIME ELEVATION ELEV. ELEV. DEPTII TEI'IP C CI NOTES 8 ELOV( BEU W ELEV. ITY (FTsMSL) REF (FT) (FT ~ MSL) BELOW SAMPLE (FT. hISL) REF.,(F T) REF. (F T) (FT.,MSL) IM?CP0hq<05 PLA ChtI PPM y 2~
g {';"",I I'1c' g( u'.Q 7. .-!7."09 '14m'::- >yr:9 Vg.;
g)Qo;a), '-"570g " /" '-" ".S'K"'"It'~
'g>'60";)av, e
'57;09
G-SERIES WELT S Well Desi nation 'Chl'o'ii'des'PM G-2A 50 17,200 G-3B 20 16,950 G-5B 20 13,520 G-6 20 2,185 G-9B 20 16,950 G-10A 50 18,500 G-12A 50 17,735 G-13 40 16,170 G-16A 50 16,185 G-17B 20 5,275 G-19B 20 390 G-23B 20 . 15,000 G-26A 50 10,000 G-30A 50'0 17,440 G'-31B 14,700 G-33A 50 16,095