Response to Letter Re Change to Tech Spec on Steam Generator Tubing Inspection, Advising, Anticipate Proposed Amendment Will Be Submitted by October 1, 1974
ML18227C011
Person / Time
Site: Turkey Point  
Issue date: 08/28/1974
From: Robert E. Uhrig
Florida Power & Light Co
To: Goller K
US Atomic Energy Commission (AEC)
References
Download: ML18227C011 (4)


Text

AFC D RIBUTION FOR PART 50 DOCKET MA'?IAL (TEMPORARY FoiQi)

CONTROL NO:

FILE:

cuss UNCLASS XXX PROP INFO FROM:

Florida Power

& Light Company Miami, Fla. 33101 Mr. R.E. Uhrig TO'eR. Goller 8-28-74 ORXG 3 signed INPUT 9-3-74 CC OTHER NO REC,'D cs 3

DATE OP DOC DATE REC'D LTR RPT OTHER SENT AEC PDR XXX SENT LOCAL PDR XXX CKET NO!

50-250 51 PLANT NME:

Turkey Point 3

& 4 DESCRIPTION:

Ltr re our 7-18-74 ltr..re Inservice Inspection of Pressurized Water Reactor Steam Generator Tubes....adv that they will submit an amdt by October 1, 1974 ENCLOSURES:

AOKNOrVLEDGE DOÃOT g,EMOVE FOR ACTION/INFORMATION 9-6-74 JB BUTLER(L)

W/

Copies CLARK(L)

W/

Copies PARR(L)

W/

Copies KNXEL(L)

W/

Copies SCHWENCER(L)

W/

Cope.es STOI.Z(I.)

W/

Copies VASSALLO(L)

W/

Copies PURPL'E (L)

W/

Copies ZXElQSN (L)

W/

Copies DICKER(E)

W/

Copies KNIGHTCN(E) "

'/

Copies YOUNGBLOOD(E),

W/

Copies REGAN (E)

W/

Copies

~LEAR(L)

W/9 Copies W/

Copies W/ 'opies INTERNAL DXSTRIBUTIO.J v

REG FII.

PDR v OGC, ROOM P-506A NUNTZING/STAFF CASH WGIAMBUSSO BOYD MOORE (L) (BWR)

DEYOUxilG(L) (PWR)

SKOVHOLT (L) v'OLLER(L)

PE COLLINS DENISE

~ REG OPR PXLP. & REGXON (2)

MORRIS ST'ELH TECH REVIEW W SCHROEDER MACCARY KNIGHT PAWLICKI SHAO STELLO HOUSTON NOVAK ROSS XPPOLITO TEDESCO LONG LAINAS BENAROYA VOLILKR DENTON GRXIIES GAlkMILL KASTNER BALLARD SPANGLER EllPXRO

)lDLLER DICKER KNIGHTON YOUNGBLOOD REGAN PROJECT LDR HARLESS LIC ASST DIGGS (L)

, GEARIN (L)

GOULBOURNE (I.)

~

KREUTZER (E)

LEE (L) liAIGRET (L)

REED (E)

SERVICE (L)

SHEPPARD (I.)

SLATER (E)

SMITH (I.)

mrEETS (L)

WILLIAMS.(E)

W?ILSON (I.)

A/r XND BRAIT>)JLN, SALTZlJAN B,

HURT PLANS MNCDONALD CkIAPNAN DUBE w/input E.

COUPE DE THO~AIPSON {2)

KLECKER EISENHUT EXTERNAL DXSTRXBUTION LOCAL PDR ~O'eeee'eee'de TIC

{Ar" i'...~'j.;.: )

N SIC (BUCl?ANAil)

ASLB Newton Anderson

'CRS HOLDING

~ t rFl~(I)(2) (10)-NATIONAL I ABS I-ASLBP(EfN Bld,."=B.2-9)

PENNINGTOiN)

Rm E-201 GT 1-MM SWIN Bi',OAD, Rm E-201 GT 1-CONSULT:O'TS NI:l"."iA."K/7ilURL./

GBA BXAN 1-PDR-SAN/LA.;Y

- ~>ROD)~."A N...i.i'1

~-Ge 0

R ~>0.;)

O..'.)

J.-AGi'"D {r"U"".".

GUS5:"'='.-'n B-"27 C';

GT

Il

~

~

~

l II

~

l Ill

~

~

~ ~ '4' t

i ls

~1 CI 8eRu~a~oe Docketee P,O. BOX 3100 MIAMI,FLORIDA 3310)

FLORIDA POWER 81 LIGHT COMPANY August,,28, 1974 pl, h

J Mr. Karl R; Goller, Assistant Director for Operating Reactors Directorate of Licensing Office of Regulation U. S. Atomic Energy Commission Washington, D.

C.

20545

Dear Mr. Goller:

TURKEY POINT PLAN UNITS 3 AND 4 DOCKET NOS.

0-25 AND 50-251 REGULA UIDE 1.83 INSERVICE INSPECTION OF PRESSURIZED WATER REACTOR STEAM GENERATOR TUBES In response to your letter of July 18,

1974, we, find it in-appropriate at this time to submit a change to the Technical Specifications on steam generator tubing inspection.

As you are aware, we have found primary to secondary leakage (AO-250/

74-9 and AO-251/74-2) in the Units 3 and 4 steam generator(s).

Consequently, we are in the process of conducting extensive tubing inspections on the Unit 4 steam generators and we will take corrective action as deemed appropriate on Unit 3.

We are currently reviewing Regulatory Guide 1.83 and working with Westinghouse to obtain a better understanding of steam generator tubing performance previous to development of changes to our Technical Specifications.

We anticipate that we will submit our proposed amendment by October 1,

1974.

Very truly yours, Robert E. Uhrig Vice President DWR/REU/cpc 1'f'