ML18227B993

From kanterella
Jump to navigation Jump to search
Response to Letter of 1/15/1975 Regarding Changes in Operator Requalification Program
ML18227B993
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/27/1975
From: Collins P
Office of Nuclear Reactor Regulation
To: Hays J
Florida Power & Light Co
References
Download: ML18227B993 (4)


Text

DIST:

Jgn 2V'875 PDR Local PDR OLB R/F Docket Nos: 50-250/251 Docket Files ACRS(16)

RO(3)

Florida Power lt Light Company DElliotT ATTN: Nr. J. K. Hays, JJHolman Plant Superintendent Nuclear ZKRKKQXK Turkey,'oint Plant JRBuchanan P. 0. Box 3100 OGC Miami, Florida 33101 KGoller TJCarter Gentlemen: GLear STeets This is in reply to your letter, dated January 15, 1975 regarding chanodes in your operator x'equalification program.

Ue have reviewed your proposals and have determined that the annual examination may be scheduled for Kirch 1975. Also, those individuals presently enrolled in the senior operator training prol,ram need not be administered the requalification annual examination if they pass NRC senior operator examinations scheduled for Narch 7, 1975. Me vill inform you o'f what 'lectures the successful candidates should attend after grading the examinations.

I hope this information will be of use to you.

Sincerely, ORIGINAl. ~IQNKO QQ P. F. CC .'NS Paul F. Collins, Chief Operator Licensing Branch Division of Reactor Licensing cc: Nr. Jack Newman Newman, Reis 6 Azelrad 1100 Connecticut Avenue, N.V.

Hashington, D. C. 20036 OPPICE3P OLB:L ORBl/3'Elliott dIIRNAMEW PFColl n '.df 147/75 1/77/75 Poan hEC-318 (Rev. 9-33) hZChi 0240 QU d; OOVERNMENT PRINTINO OPPICEI l074 52d Idd

I

~ P h g FI

P.O. BOX 3I00 MIAMI, FLORIDA 3310I FLORIDA POWER 5 LIGHT COMPANY Turkey Point Plant January 15, 1975 Director of Licensing U. S. Atomic Energy Commission Washington, D. C. 20545

Dear Sir:

In a telephone conversation on January 14, 1975, between Mr. Paul Collins (AEC) and Mr. K. E. Beatty (FPL), a request was made by Mr. Beatty to ex-tend the date from January, 1975, to March, 1975, for the annual licensed operator requalification examination at the Turkey Point Plant. In dis-cussing the. request, it was determined that the requalification program at Turkey Point actua11y began in March, 1974, after the operators'ad:re-turned to work from the three-month work stoppage. Mr. Collins then agreed that it would be all right to extend until March, 1975, the date of the annual requalification program examination. Mr. Beatty then asked Turkey Point Senior Operator examination, to be given shortly to the Re-if the actor Operators that are desiring upgrading to Senior Operator, would count for their annual examination. Mr. Collins agreed that successful comple-tion of this examination would also be acceptable as their annual requali-fication examination. However, if any of these desiring upgrading are un-successful in passing the Senior Operator examination, they will then be required to take and pass the annual requalification examination for their classification at Turkey Point.

The other licensed personnel at Turkey Point that are not desiring upgrading will be examined, as ageed, in March, 1975.

Should you need any additional information, please contact me.

Very truly yours, J. K. H Plant Superintendent Nuclear JKH:AA/sl cc: H.,E. Yaeger K. E. Beatty C. M. Wethy File HELPING BUILD FLORIDA

0

~ Pea