Responding to Letters of 12/8/1977 & 12/15/1977 Requesting Completion of Two Questionnaires, FPL Determined Optimal Utilization of Operating Personnel Prevents from Responding to Two Subject Surveys
ML18227B801
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/20/1978
From: Robert E. Uhrig
Florida Power & Light Co
To: Case E
Office of Nuclear Reactor Regulation
References
L-78-25
Download: ML18227B801 (6)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM <RIDS)

DISTRIBUTION FOR INCOMING MATERIAL 0-250/

1/335/389 REC:

CASE E

G NRC ORG:

UHRIG R E FL PWR Kc LIGHT DOCDATE: 01/20/78 DATE RCVD: 01/23/78 DOCTYPE:

LETTER NOTARIZED:

NO COPIES RECEIVED

SUBJECT:

LTR 3 ENCL 0,,

RESPONSE

TO NRC"S 12/09/77 REQUEST FOR COMPLETION QF QUESTIONNAIRES CONCERNING STEAM GENERATORS AND STANDBY DIESEL GENERATORS.

PLANT NAME: TURKEY POINT UNIT 3 TURKEY POINT UNIT 4 ST.

LUCIE UNIT ST.

LUCIE UNIT 2 REVIEWER INITIAL:

XJM DISTR IBUTER INITIAL:

++ww+++++++ww+ww+ DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS DISTRIBUTION OF."RELIABILITYOF STANDBY DIESEL GENERATOR UNITS" PER J.

<DISTRIBUTION CODE A014)

FOR ACTION:

BRANC INTERNAL:

I8.E4+LTR ONLY(1 >

HANAUER+4LTR ONLY< 1)

EISENHUT+4LTR ONLY(1)

BAER++LTR QNLY< 1)

GRIMES++LTR ONLY(i)

J.

MCGOUGH+4LTR ONLY< 1)

NRC PDR+wLTR ONLY< 1)

OELD++LTR ONLY(i>

CHECK4+LTR ONLY<i)

SHAO4+LTR ONLY(i>

BUTLER+<LTR ONLY(1)

J.

COLLINS++LTR ONLY( 1 )

F.

CLEMENSON44LTR ONLY< 1)

EXTERNAL:

LPDRiS MIAMI'L++LTRONLY(1)

TIC+4LTR ONLY<i)

NSIC++LTR ONLY( 1 ACRS CAT 8++LTR ONLY< 16)

DISTRIBUTION:

LTR 40 ENCL 0 SIZE:

2P THE END N

CONTROL NBR:

780240025

~

4 4

~

II II I

lh 4

lh Ef 3

4 h

~ '

3 4

4

gl, IBI((I (( 'I glO. BOX1I033100IPAMI, FL 33'101

<<><3 IJL>IB((l( LtjjJj',.jZi'i( I'II It$)]I jP

FLORIDAPOWER & LIGHT COMPANY January 20, 1978 L-78-25 Mr. Edson G. Case,Acting Director Office of Nuclear Reactor Regulation U. S.'uclear Regulatory Commission Washington, DC 20555

Dear Mr. Case:

Re:

Turkey Point Units 3 and 4 and St. Lucie Unit 1 License Nos.

DPR-31, DPR-41, and DPR-67 Steam Generator and Standby Diesel Generator Questionnaires We have received letters from your staff dated December 9,

1977 and December 15, 1977 requesting that Florida Powex 6 Light Company (FPL) complete questionnaires concerning steam generators and standby diesel generators, respectively.

We have reviewed these questionnaires and determined that their completion would be a significant undertaking for FPL personnel who are essential to the completion of activities required for the operation of our nuclear units.

For example, the staff at St. Lucie Unit 1 is preparing for the first refueling outage at that plant which is scheduled to begin in March, 1978.

j:t will be a lengthy outage and will require extensive preparation.

Because personnel in-volved in this outage preparation will be the same as those who would respond to the quest'ionnaires at St. Zucie, little time will be available for 'writing the responses.

Also, the Turkey Point. Unit 4 steam generator inspections are due in February, 1978.

This will require

'.the Turkey Point Staff to prepare for and,conduct the inspections.

ln addition, they are preparing for the Unit 4 refueling outage, scheduled for Spring, 1978.

Hence, the Turkey Point, Plant Staff, too will have little time for preparation of the ques-tionnaire responses.

Most of the information requested by the steam generator questionnaire has already been provided for the Turkey Point Plant in reports filed with your staff concerning secondary water chemistry and the condition of the steam generator tubes.

We have also provided a great deal of information on this sub-ject to EPRX which should be available to your staff.

PEOPLE.

~ ~ SERVING PEOPI E

E.

I

0 Hr. Edson G.

Case Page Two

. The first steam generator tube surveillance at St. Lucie Unit 1 is scheduled for the first refueling outage.

Until several months after that outage, data will not be available.

However, the NRC may obtain any basic plant and steam generator design information from the NSSS vendor.

If there is infor-mation for either Turkey Point or St. Lucie which cannot be obtained through the channels we have suggested, please let us know.

We have estimated that the standby diesel'generator questionnaire would require a mini'mum of 200 man-hours per unit for travel time, inspections, record review, data compilation, and preparation and review of the completed questionnaire.

We are unable to justify the expenditure of this time by personnel whose activities are required for plant operation.

Xn conclusion, we have determined that optimal utilization of our operating personnel prevents us from responding to the two subject surveys.

You~rmyry truly Vice President.